CITY OF VIRGINIA BEACH TRANSPORTATION SYSTEM IN 2040 · 9/2/2011  · city of virginia beach...

Preview:

Citation preview

CITY OF VIRGINIA BEACH TRANSPORTATION SYSTEM IN 2040 ENVISION VB 2040 COMMITTEE PRESENTATION SEPTEMBER 2, 2011 MARK SCHNAUFER PLANNING AND SGA OFFICES

EXISTING CITY TRANSPORTATION PLANS • Master Transportation Plan (2009) • Bikeways and Trails Plan (2011) • HRT Buses and Paratransit • Regional Transit

SEPT 2, 2011 ENVISION VB 2040 2

MASTER TRANSPORTATION PLAN • Chapter of City Comprehensive Plan • Updated 2009. Next update 2014 • Historically road focused

• Ultimate ROW and/or lanes identified • Bike facilities mentioned • Minor transit • No major changes since SE Parkway mid ‘80s • No major modeling verification since ‘80s

• 2014 update to model with and w/o SE Parkway and new population projections

SEPT 2, 2011 ENVISION VB 2040 3

BIKEWAYS AND TRAILS PLAN

• Original adoption 2004

• Updated April 2011

• Ultimate buildout plan

• Rec and Transportation

SEPT 2, 2011 ENVISION VB 2040 4

TRANSIT PLANNING-LOCAL • Coordination with HRT year by year • City determines/pays for service • HRT Developing 6-year Transit Development Plan • 2011 Efficiency Study • 2012-Two new routes under study

• Express Route-Oceanfront to Newtown LRT • Mall-Bases-General Booth (37 replacement)

• Virginia Beach Transit Extension Study (2013 Completion)

SEPT 2, 2011 ENVISION VB 2040 5

HRT EXISTING ROUTE MAP

SEPT 2, 2011 ENVISION VB 2040 6

PARATRANSIT • Service matches HRT routes and

schedules • ¾ mile radius from existing routes • Must be a certified passenger

through HRT • Caregivers are also eligible • ADA required • Contracted service through HRT

SEPT 2, 2011 ENVISION VB 2040 7

REGIONAL TRANSIT • HR Regional Transit Vision Plan: 2011

• Long-range Plan-3 phases

• 2025 • 2035 • After 2035

• LRT, BRT, Streetcar, Ferry, Express Bus, Circulator Bus

• Endorsed by HRT, WATA, DRPT, HRTPO

• www.drpt.virginia.gov/activities/hrrtvp.aspx or

Google “Hampton Roads Regional Transit Vision Plan”

SEPT 2, 2011 ENVISION VB 2040 8

REGIONAL TRANSIT PLAN

SEPT 2, 2011 ENVISION VB 2040 9

• RT to Oceanfront (2025) • Enhanced bus Little Crk, PA, L.H., NAS,

Corporate Landing (2025) • LRT to ODU/Navy (2025) • LRT Harbor Park-Greenbriar (2035) • LRT Military-Airport-Navy (after 2035)

CONSIDERATIONS FOR THE FUTURE USERS

LIFESTYLES NEEDS

OPTIONS/MODES FACILITIES

SEPT 2, 2011 ENVISION VB 2040 10

TRANSPORTATION USERS

Working Adults

Students

Kids

Parents

Caregivers

Seniors / Disabled

Emergency Service

Military

Tourists

Delivery and

Service Providers

SEPT 2, 2011 ENVISION VB 2040 11

Lifes

tyles

• Urbanites • “Traditional Families” • Beach Cottage • Beach Apartment • Military • Seasonal • Adult Student

SEPT 2, 2011 ENVISION VB 2040 12

SEPT 2, 2011 ENVISION VB 2040 13

Medical Access Recreation Education

Employment Long Distance Transportation Entertainment

Shopping / Dining Deliveries

User Needs

BALA

NCIN

G O

PTIO

NS A

ND

MOD

ES

Vehicular Off-Road

SEPT 2, 2011 ENVISION VB 2040 14

2040 Transportation Infrastructure Development

Vision

Users

Needs

Modes and Facilities

Lifestyles and Development

Patterns

Balancing of Options,

Alternatives, and Modes

SEPT 2, 2011 ENVISION VB 2040 15

YOUR CHALLENGE

Recommended