CIP-010 and CIP-011 Current Status. Reliability First CIP Webinar Thursday, June 22, 2010 Mike Ketchens 06/22/10. Timeline Project 2008-06-Cyber Security Order 706 Phase II. Standard Drafting Team requested industry feedback on the initial drafts – due 6/3/2010. - PowerPoint PPT Presentation
Citation preview
CIP-010 and CIP-011Current Status
ReliabilityFirst CIP Webinar
Thursday, June 22, 2010
Mike Ketchens
06/22/10
TimelineProject 2008-06-Cyber Security Order 706 Phase II
Standard Drafting Team requested industry feedback on the initial drafts – due 6/3/2010.
ReliabilityFirst CIP Team provided feedback.
Drafting team met with FERC Staff members on May 27, 2010 to solicit their feedback.
Drafting team is currently utilizing the feedback received to refine the draft and hopes to put it out for formal review in July/August 2010.
Items of Special Note
CIP-010 and CIP-011 Eliminate Critical Asset and Critical Cyber Asset
terms
Introduce new terms and definitionsBES Cyber System ComponentBES Cyber SystemControl Center
Highlights of Changes
CIP-010• Replaces CIP-002
• Has three (3) Requirements and three (3) sub-requirements
• Classification of BES Cyber Systems as Low, Medium, or High based on categorization of impact on BES
Highlights of Changes
CIP-011• Replaces CIP-003 through CIP-009
• Has thirty two requirements and thirty two tables each similar in format to a sub requirement
• Implements a catalogue of controls based on impact of BES Cyber Systems as identified in CIP-010
QUESTIONS
Questions should be emailed to Matt Thomas (matt.thomas@rfirst.org), Subject: “CIP WEBINAR”
Questions will considered in the order they are received
Clarifying questions are welcome and we’ll do our best to answer during the question period
Challenges to a position should be addressed to the presenter and will be taken offline
Recommended