Change Management Jerzy.Nawrocki@put.poznan.pl Requirements Engineering & Project Management...

Preview:

Citation preview

Change ManagementChange Management

Jerzy.Nawrocki@put.poznan.plwww.cs.put.poznan.pl/jnawrocki/require/

Requirements Engineering & Project ManagementLecture 10

J.Nawrocki, Change Management

XPrince Roles and Changes

Project ManagerAnalyst Architect

Changing requirementsChanging requirements Team dynamicsTeam dynamics

J.Nawrocki, Change Management

Agenda

•CMM and Change Management•Requirements Management Practices•Situational Leadership

• Introduction• XPrince Team• Project Lifecycle• The Analyst Role• The Architect Role• The Project

Manager Role• Scaling up• Conclusions

J.Nawrocki, Change Management

Agenda

•CMM and Change Management•Requirements Management Practices•Situational Leadership

• Introduction• XPrince Team• Project Lifecycle• The Analyst Role• The Architect Role• The Project

Manager Role• Scaling up• Conclusions

J.Nawrocki, Change Management

Software Configuration Item (SCI)

SCI = “Information that is created as part of the software engineering process.” [R.Pressman]

Types of SCIs: computer programs (source code or

exec) documents (also requirem. specification) data (e.g. test cases)

if (a > b) a-= b;

18 27

J.Nawrocki, Change Management

Baseline [IEEE 610-1990]

A specification or product that has been formally reviewed and agreed upon,

that thereafter serves as the basis for further development, and

that can be changed only through formal change control procedures.

Specification

DesignCode

Test cases

J.Nawrocki, Change Management

Base-line

Baseline or SCI?

Engineering

Change it!

Change control

SCI

FTR

SCI

Baseline library

Baseline

J.Nawrocki, Change Management

SCCB

Software Configuration Control Board (SCCB)

Authorises: the establishment of software baselines, the identification of configuration items, the creation of products from the

baseline library.Represents the interests of the project

manager and all groups affected by changes to baselines.

Reviews and authorises changes.

J.Nawrocki, Change Management

CMM & Change Management

Ac5. Change requests & problem reports for all SCIs are

initiated, recorded, reviewed, approved, and trackedaccording to a documented

procedure.

Remove2nd floor!

J.Nawrocki, Change Management

Change Control

Change request

Err

User S.C. Manager

Change request

Developer

Change report

SCCB

Deci-sion

J.Nawrocki, Change Management

Change Control

Change request

Err Change request

Developer

Change report

SCCB

Deci-sion

Change request

P. Manager

User S.C. Manager

J.Nawrocki, Change Management

Change request

Change request

Change request number: ............................

Sender: .........................................................

Sender’s e-mail: ...........................................

Date: ..............................................................

Urgency: ................. Importance: ..............

Description: .................................................

.......................................................................

.......................................................................

Evaluator: .....................................................

Evaluate by: ........... Type (in/external) .......

J.Nawrocki, Change Management

Change report

Change report

Change request number: ..........................

Evaluator: ...................................................

Evaluator’s e-mail: .....................................

Date: ............................................................

Urgency: ................ Importance: ..............

Is the change justifiable? ..........................

Main risk factors: .......................................

Possible implementor: ..............................

Change implement. effort (expect): .........

Change evaluation effort (actual): ............

J.Nawrocki, Change Management

Agenda

•CMM and Change Management•Requirements Management Practices•Situational Leadership

• Introduction• XPrince Team• Project Lifecycle• The Analyst Role• The Architect Role• The Project

Manager Role• Scaling up• Conclusions

J.Nawrocki, Change Management

Requirements Management

The requirements document

Requirements elicitation

Reqs analysis & negotiation

Describing requirements

System modelling

Requirements validation

Requirements management

RE for critical systems

Basic Interm Adv

8

6

54

3

4

4

2

36

-

6

21

3

3

3

3

21

-

1

1-

-

1

2

4

9

J.Nawrocki, Change Management

Basic guidelines

Requirements management

Uniquely identify each requirement

J.Nawrocki, Change Management

Basic guidelines

Requirements management

Tag

Uniquely identify each requirement

J.Nawrocki, Change Management

Basic guidelines

Requirements management

Uniquely identify each requirementDefine policies for requirements

management

Requirements Management Policy

Goal: Understand the requirements

Obligatory practices:

1. Define specialised terms using the template available at www.cs.put.poznan...

J.Nawrocki, Change Management

Basic guidelines

Requirements management

Uniquely identify each requirementDefine policies for requirements

managementDefine traceability policies

J.Nawrocki, Change Management

Traceability policy

Traceability informationWho is responsible

Problems

Visions

Requirements (FURPS)

Acceptance test cases

User documentation

Design

Code

J.Nawrocki, Change Management

Basic guidelines

Requirements management

Uniquely identify each requirementDefine policies for requirements

managementDefine traceability policiesMaintain a traceability manual

J.Nawrocki, Change Management

Intermediate guidelines

Requirements management

Use a database to manage requirementsDefine change management policiesIdentify global system requirements

J.Nawrocki, Change Management

Advanced guidelines

Requirements management

Identify volatile requirementsRecord rejected requirements

J.Nawrocki, Change Management

Change management styles

Disciplined (formal)

Agile (informal)

J.Nawrocki, Change Management

Agenda

•CMM and Change Management•Requirements Management Practices•Situational Leadership

• Introduction• XPrince Team• Project Lifecycle• The Analyst Role• The Architect Role• The Project

Manager Role• Scaling up• Conclusions

J.Nawrocki, Change Management

Management Styles

•Democratic, people-oriented

•Autocratic, result-oriented

J.Nawrocki, Change Management

Effective Management

•Goal setting

•Praising

•Reprimanding

J.Nawrocki, Change Management

Goal Setting

Specific and measurable

Motivating

Attainable

Relevant

Trackable

SMART

J.Nawrocki, Change Management

Praising

Catch people doing things right.

Praise them.

Do it frequently.

J.Nawrocki, Change Management

Reprimanding

Critisize the behaviour, not the person.

Talk about the facts. Gossips and impressions must be checked.

Concentrate on most important aspects of the problem.

1. Present the problem.

2. Say what you feel.

3. Break for a moment.

4. Express your positive attitude towards the person.

J.Nawrocki, Change Management

Motivation Dynamics

Time

Motivation

J.Nawrocki, Change Management

Skills and Knowledge

Time

Skills

J.Nawrocki, Change Management

Management Dynamics

Directive Motivating Detached

J.Nawrocki, Change Management

Summary

Disciplined approach to change managment (CMM)

Requirements management practices

Team dynamics management

J.Nawrocki, Change Management

Questions?

J.Nawrocki, Change Management

Quality assessment

1. What is your general impression? (1 - 6)2. Was it too slow or too fast?3. What important did you learn during the lecture?4. What to improve and how?

Recommended