3020
Project Summary:Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated. Families prize the high value we place on academics; the varied extracurricular opportunities; our culture of constant innovation; and our focus on relationships as the center for learning.
It was originally constructed in 1912 at 188,000 square feet. A later addition was completed in 1925 and a major renovation was completed in 1977. It is now 340,641 square feet.
Issues Identified By School Community In 20151. Safety and security2. Indoor air quality unhealthy3. Update of camera system4. Furniture - fixtures and equipment5. Improve all learning spaces6. Bathroom improvements7. True study hall space with desks and good lighting8. Community and shared - open social space9. Welcoming entrance and identity
Grade Levels: 9-12SY 2014/15 Enrollment: 1858Design Enrollment: 2160
1
275 Lexington Parkway North
General Notes:Existing utilization shown is for School Year 2014-2015
The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.
The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).
The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.
Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.
Central High School
3020
Site ConceptLegend:S1. New main entry, lobby, commons, and InstructionalSpaceadditions (9,230SF)
S2. IncorporatePlazaretrofit(byothers)intonew landscapeconstructionatMainEntry (12,000SF)
S3. RelocateoutdoorInstructionalSpace (1,600SF)
AlterationsNew Landscape ConstructionNew Building Construction
ServiceEntry
PropertyLine
SecondaryEntryMainEntry
2
MATCH
-LINE
Central High School
3020
ExistingUtilization
3.1
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
BASEMENTFLOOR
Central High School
3020
ExistingUtilization
3.2FIRSTFLOOR
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Central High School
3020
ExistingUtilization
3.3SECONDFLOOR
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Central High School
3020 3.4
ExistingUtilization
THIRDFLOOR
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Central High School
3020 3.5
ExistingUtilization
FOURTHFLOOR
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Central High School
3020
ConceptualUtilizationPlan
Legend:C1. NewInstructionalSpace (1,194SF)
C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (5,330SF)
C3. Restroomupgrades (270SF)
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities SupportNew/Existing
Demolition/Removal
4.1BASEMENT
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
4.2A
ServiceEntry
PropertyLine
SecondaryEntryMainEntry
Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (16,974SF)
C3. Restroomupgrades (2,286SF)
New/Existing
Demolition/Removal
FIRSTFLOOR
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
ServiceEntry
PropertyLine
SecondaryEntryMainEntry
Legend:C1. NewInstructionalSpace (6,110SF)
C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (3,000SF)
C3. Restroomupgrades (903SF)
C4. NewCorridor (2,445SF)
C5. NewElevator (200SF)
C6. New2-storyEntryLobbyandgrandstair (3,270SF)
New/Existing
Demolition/Removal
ADDITION
EXISTING
See4.2A
4.2BFIRSTFLOOR
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (7,404SF)
New/Existing
Demolition/Removal
4.3A
See4.3B
See4.3B
SECONDFLOOR
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (13,932SF)
C3. Restroomupgrades (997SF)
C6. New2-storyEntryLobbyandgrandstair (See4.2B)
C7. NewStudentCommons (7,654SF)
C8. UpgradeCafeteria (7,786SF)
C9. Cafeteriaexpansion (4,930SF)
New/Existing
Demolition/Removal
ADDITION
EXISTING
4.3BSECONDFLOOR
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
4.4
Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (16,268SF)
C3. Restroomupgrades (1,124SF)
C10. Newsharedcentralizedlearningarea (3,081SF)
New/Existing
Demolition/Removal
THIRDFLOOR
Central High School
3020
ConceptualUtilizationPlan
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
4.5
Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (17,509SF)
C3. Restroomupgrades (912SF)
C4. NewCorridor (450SF)
C10. Newsharedcentralizedlearningarea (4,798SF)
C11. MediaCenterupgrades (8,496SF)
New/Existing
Demolition/Removal
FOURTHFLOOR
Central High School
3020
ConceptualConstructionPlan
5.1
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A
B 270SF 1,194SF 5,328SF
C
TOTAL 270SF 1,194SF 5,328SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
BASEMENT
Central High School
3020
ConceptualConstructionPlan
5.2A
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A 1,452SF
B 2,285SF 15,522SF
C
TOTAL 2,285SF 16,974SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
FIRSTFLOOR
Central High School
3020
ConceptualConstructionPlan
SEE 5.2A
5.2B
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A 9,327SF 4,081SF 4,573SF
B 903SF
C
TOTAL 9,327SF 4,984SF 4,573SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
NewMainEntry,grandstair and elevator
ADDITION
EXISTINGFIRSTFLOOR
Central High School
3020
ConceptualConstructionPlan
SEE 5.3B
5.3A
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A
B 9,075SF
C
TOTAL 9,075SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
SECONDFLOOR
Central High School
3020
ConceptualConstructionPlan
5.3B
SEE5.3A
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A 10,058SF 3,087SF 9,496SF
B 997SF 14,377SF
C
TOTAL 10,058SF 4,084SF 9,496SF 14,377SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
NewMainEntry,grandstair and elevator
RemovestairADDITION
EXISTING
SECONDFLOOR
Central High School
3020
ConceptualConstructionPlan
5.4
Typicalat3areas:ExpandInstructionalSpacefoot-print,removeexistingexteriorwallandaddnewglazing
Removewallsandaddslidingglasspartitionstoprovideflexiblelearningareas
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A
B 14,388SF
C 625SF 5,385SF
TOTAL 625SF 5,385SF 14,388SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
THIRDFLOOR
Central High School
3020
ConceptualConstructionPlan
5.5
Typicalat3areas:ExpandInstructionalSpacefoot-print,removeexistingexteriorwallandaddnewglazing
Removewallsandaddslidingglasspartitionstoprovideflexiblelearningareas
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A
B 17,347SF
C 625SF 13,922SF
TOTAL 625SF 13,922SF 17,347SF
Line Items Unit Lump SumAir QualitySecurity System
New / Existing
Demolition / Removal
FOURTHFLOOR
Recommended