Central High School

3020

Project Summary:Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated. Families prize the high value we place on academics; the varied extracurricular opportunities; our culture of constant innovation; and our focus on relationships as the center for learning.

It was originally constructed in 1912 at 188,000 square feet. A later addition was completed in 1925 and a major renovation was completed in 1977. It is now 340,641 square feet.

Issues Identified By School Community In 20151. Safety and security2. Indoor air quality unhealthy3. Update of camera system4. Furniture - fixtures and equipment5. Improve all learning spaces6. Bathroom improvements7. True study hall space with desks and good lighting8. Community and shared - open social space9. Welcoming entrance and identity

Grade Levels: 9-12SY 2014/15 Enrollment: 1858Design Enrollment: 2160

1

275 Lexington Parkway North

General Notes:Existing utilization shown is for School Year 2014-2015

The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.

The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).

The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.

Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.

Central High School

3020

Site ConceptLegend:S1. New main entry, lobby, commons, and InstructionalSpaceadditions (9,230SF)

S2. IncorporatePlazaretrofit(byothers)intonew landscapeconstructionatMainEntry (12,000SF)

S3. RelocateoutdoorInstructionalSpace (1,600SF)

AlterationsNew Landscape ConstructionNew Building Construction

ServiceEntry

PropertyLine

SecondaryEntryMainEntry

2

MATCH

-LINE

Central High School

3020

ExistingUtilization

3.1

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

BASEMENTFLOOR

Central High School

3020

ExistingUtilization

3.2FIRSTFLOOR

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Central High School

3020

ExistingUtilization

3.3SECONDFLOOR

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Central High School

3020 3.4

ExistingUtilization

THIRDFLOOR

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Central High School

3020 3.5

ExistingUtilization

FOURTHFLOOR

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Central High School

3020

ConceptualUtilizationPlan

Legend:C1. NewInstructionalSpace (1,194SF)

C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (5,330SF)

C3. Restroomupgrades (270SF)

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities SupportNew/Existing

Demolition/Removal

4.1BASEMENT

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

4.2A

ServiceEntry

PropertyLine

SecondaryEntryMainEntry

Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (16,974SF)

C3. Restroomupgrades (2,286SF)

New/Existing

Demolition/Removal

FIRSTFLOOR

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

ServiceEntry

PropertyLine

SecondaryEntryMainEntry

Legend:C1. NewInstructionalSpace (6,110SF)

C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (3,000SF)

C3. Restroomupgrades (903SF)

C4. NewCorridor (2,445SF)

C5. NewElevator (200SF)

C6. New2-storyEntryLobbyandgrandstair (3,270SF)

New/Existing

Demolition/Removal

ADDITION

EXISTING

See4.2A

4.2BFIRSTFLOOR

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (7,404SF)

New/Existing

Demolition/Removal

4.3A

See4.3B

See4.3B

SECONDFLOOR

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (13,932SF)

C3. Restroomupgrades (997SF)

C6. New2-storyEntryLobbyandgrandstair (See4.2B)

C7. NewStudentCommons (7,654SF)

C8. UpgradeCafeteria (7,786SF)

C9. Cafeteriaexpansion (4,930SF)

New/Existing

Demolition/Removal

ADDITION

EXISTING

4.3BSECONDFLOOR

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

4.4

Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (16,268SF)

C3. Restroomupgrades (1,124SF)

C10. Newsharedcentralizedlearningarea (3,081SF)

New/Existing

Demolition/Removal

THIRDFLOOR

Central High School

3020

ConceptualUtilizationPlan

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

4.5

Legend:C2. RefurbishInstructionalSpace- furniture,lighting,equipment,aesthetics (17,509SF)

C3. Restroomupgrades (912SF)

C4. NewCorridor (450SF)

C10. Newsharedcentralizedlearningarea (4,798SF)

C11. MediaCenterupgrades (8,496SF)

New/Existing

Demolition/Removal

FOURTHFLOOR

Central High School

3020

ConceptualConstructionPlan

5.1

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A

B 270SF 1,194SF 5,328SF

C

TOTAL 270SF 1,194SF 5,328SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

BASEMENT

Central High School

3020

ConceptualConstructionPlan

5.2A

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A 1,452SF

B 2,285SF 15,522SF

C

TOTAL 2,285SF 16,974SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

FIRSTFLOOR

Central High School

3020

ConceptualConstructionPlan

SEE 5.2A

5.2B

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A 9,327SF 4,081SF 4,573SF

B 903SF

C

TOTAL 9,327SF 4,984SF 4,573SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

NewMainEntry,grandstair and elevator

ADDITION

EXISTINGFIRSTFLOOR

Central High School

3020

ConceptualConstructionPlan

SEE 5.3B

5.3A

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A

B 9,075SF

C

TOTAL 9,075SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

SECONDFLOOR

Central High School

3020

ConceptualConstructionPlan

5.3B

SEE5.3A

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A 10,058SF 3,087SF 9,496SF

B 997SF 14,377SF

C

TOTAL 10,058SF 4,084SF 9,496SF 14,377SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

NewMainEntry,grandstair and elevator

RemovestairADDITION

EXISTING

SECONDFLOOR

Central High School

3020

ConceptualConstructionPlan

5.4

Typicalat3areas:ExpandInstructionalSpacefoot-print,removeexistingexteriorwallandaddnewglazing

Removewallsandaddslidingglasspartitionstoprovideflexiblelearningareas

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A

B 14,388SF

C 625SF 5,385SF

TOTAL 625SF 5,385SF 14,388SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

THIRDFLOOR

Central High School

3020

ConceptualConstructionPlan

5.5

Typicalat3areas:ExpandInstructionalSpacefoot-print,removeexistingexteriorwallandaddnewglazing

Removewallsandaddslidingglasspartitionstoprovideflexiblelearningareas

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A

B 17,347SF

C 625SF 13,922SF

TOTAL 625SF 13,922SF 17,347SF

Line Items Unit Lump SumAir QualitySecurity System

New / Existing

Demolition / Removal

FOURTHFLOOR

Recommended