MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- A -
Acknowledgement Preparation of City Development Plan for Rampur Baghelan has been one of the major milestones for I-Win Advisory Services Ltd. This accomplishment would not have been possible without the cordial and warm support of all the citizens of Rampur Baghelan. Their ideas, suggestions and cooperation have been a major factor for successful preparation of the City Development Plan. We express our sincere gratitude to all the people of Rampur Baghelan. We also express our gratitude to all district officials and municipal staff of Rampur Baghelan who have been associated with the preparation of the City Development Plan. District Magistrate (Satna), Project Officer (District Urban Development Agency, Satna), Honourable Chairman and Chief Municipal Officer of Rampur Baghelan Municipality deserve a special mention. Besides, we would also like to thank the Commissioner, Chief Engineer, Mr. Pravin Bhagwat, State Coordinator of UADD and all other staff of Urban Administration and Development Department, Bhopal, for their help and support.
1
Executive Director
I-Win Advisory Services Ltd.
Disclaimer: The information in this Report has been presented based on data collected from primary and secondary sources.
Wherever information was not readily available, logical assumptions have been made, in good faith to draw meaningful inferences and these have been mentioned in the respective sections of the report. All such assumptions are subject to further corroboration based on availability of information. This Report includes certain statements, estimates, projections and forecasts based on the information provided by the concerned authorities and rational assumptions made by I-Win Advisory Services Ltd. All such projections are highly assumption specific & not common for all changing scenario. This report has been prepared I-Win Advisory Services Ltd. for its client, Urban Administrative Development Department, Govt. of Madhya Pradesh for its use for future development.
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO.IWIN-SL/12-13/F/CDP/R0/019
CITY USP
R A M P U R B A G H E L A N
Rampur Baghelan with a population of 12223, is a small town in Satna district of Madhya Pradesh. Various cement plants are coming up in and around the town The town can be developed as the AGRICULTURAL HUB for the region, substantial land is available in and around the town. Agriculture is the mainstay of economy for Rampur tehsil. Town area is 23.54 sq km. National Highway 75 passes through the town.
C A N A L F R O M B A N S A G A R D A M T O R A M P U R
A G R I C U L T U R E - K E Y E C O N O M I C D R I V E R O F R A M P U R
Canal from Ban Sagar Dam flows through the town.
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO.IWIN-SL/12-13/F/CDP/R0/019
CHECKLIST
LatitudeLongitude
Average rainfall (annual) MMHeight above mean sea level MtsMunicipal area (1991) Sq kmsMunicipal area (2001) Sq kmsMunicipal area (2011) Sq kms
Historic importance In one or two sentences
Population Year 1991 (under Municipal boundary only)Population Year 2001 (under Municipal boundary only)Population Year 2011 (under Municipal boundary only)Name of Population projection Method Projected population adopted Year 2016Projected population adopted Year 2026Projected population adopted Year 2036
Land Use % Standard (as per UDPFI)
Land use (Tentative in Sq kms ) Land use (Tentative in percentage)
Residential 40-45% 2.21 9.38Commercial 3-4% 0.02 0.10Public-Semipublic 10-12% 0.16 0.69Recreational 18-20% 0.01 0.04Agricultural 17.70 75.20Transport 12-14% 1.83 7.79Industrial 08-10% 0.00 0.00Mixed 0.02 0.08Other Green 0.45 1.89Waterbody 1.07 4.55Heritage 0.00 0.01Unused Plots 0.06 0.26Total 23.54 100.00
CompanyNameULB NameWhether the Sectoral Analysis report is as per UADD requisites
Tow
n Br
ief
Geographical location (Town)
23.5423.5423.54
The name Rampur Baghelan originated from the fact that it this village named Rampur was the starting point of Baghelkhand area, hence the
name. The place was also known as Baghelano ki basti.
Land
Use
Name of the Town: Rampur BaghelanCity Profile
1650119426
I-Win Advisory Services Ltd.Rampur Baghelan
Yes
12223
11310
13636
Exponential14473
2430 N 8107E
average 846 330
War
d #
War
d 1
War
d 2
War
d 3
War
d 4
War
d 5
War
d 6
War
d 7
War
d 8
War
d 9
War
d 10
War
d 11
War
d 12
War
d 13
War
d 14
War
d 15
Tota
l
Nam
e of
war
d
Pt. J
awah
ar
Lal N
ehru
W
ard
Sant
Tul
sida
s W
ard
Sant
Kab
irdas
W
ard
Mah
aran
i La
xmib
ai
War
d
Dr. R
ajen
dra
Pras
ad W
ard
Rani
Du
rgaw
ati
War
d
Sard
ar
Valla
bhbh
ai
Pate
l War
d
Mah
atm
a Ga
ndhi
War
dLa
l Bah
adur
Sh
astr
i War
dVe
er S
hiva
ji W
ard
Sard
ar
Bhag
at S
ingh
W
ard
Dr.
Bhee
mar
ao
Ambe
dkar
W
ard
Swam
i Vi
veka
nand
W
ard
Chan
dras
hek
har A
zad
War
d
Mal
ik
Moh
amm
ad
Jais
i War
d
War
d Po
pula
tion
(201
1)86
670
214
2492
459
318
8376
487
585
368
478
987
449
744
914
5913
636
Area
(sq
kms)
1.36
2.51
3.99
1.59
1.53
3.23
3.98
1.16
0.55
0.91
1.74
0.05
0.04
0.05
0.85
23.5
4De
nsity
(PPS
qkm
)63
728
035
758
138
858
319
275
415
5175
245
317
480
1242
589
8017
1657
9M
ale
(201
1)44
735
572
848
131
599
439
246
545
634
339
044
124
923
576
170
52Fe
mal
e (2
011)
419
347
696
443
278
889
372
410
397
341
399
433
248
214
698
6584
SC (2
011)
3680
144
270
108
08
00
043
40
020
1199
ST (2
011)
203
022
413
817
152
90
60
116
485
204
00
020
76BP
L (20
11)
6896
194
149
8814
967
1215
280
124
174
3722
8614
98Se
x ra
tio (2
011)
937
977
956
921
883
894
949
882
871
994
1023
982
996
911
917
934
Crud
e Li
tera
cy ra
te (%
) (20
11)
71.9
462
.25
62.5
058
.66
62.7
355
.92
70.0
381
.60
80.4
269
.01
58.5
657
.09
82.2
981
.74
76.4
267
.29
Aver
age
Lite
racy
rate
(%) (
2011
)83
.40
74.3
275
.04
68.0
171
.13
66.6
981
.18
94.9
590
.14
78.1
572
.07
68.1
790
.89
92.4
486
.57
78.4
0
No.
of P
rimar
y sc
hool
s1
12
31
11
10N
o. o
f Prim
ary
Heal
th C
entr
e1
1N
o. o
f Hou
seho
lds
167
127
316
157
115
394
133
329
117
151
124
5386
9024
826
07Pr
imar
y oc
cupa
tion
(Maj
ority
)La
bour
Seco
nday
occ
upat
ion
Serv
ices
Tert
iary
occ
upat
ion
Farm
ing
No.
of S
S/LS
indu
stria
l uni
ts0
No.
of S
lum
poc
kets
22
3 (W
hole
W
ard)
31
1 (W
hole
w
ard)
11
21
118
No.
of S
lum
Hou
seho
lds
7560
316
3030
394
8030
112
5315
1195
No.
of I
ndiv
idua
l wat
er
conn
ectio
ns in
the
war
d53
0
No.
of T
ubew
ells
10
21
02
22
02
11
11
016
No.
of H
andp
umps
122
No.
of O
HTs
11
% C
over
age
of p
iped
wat
er su
pply
35%
No.
of I
ndiv
idua
l Toi
lets
(H
ouse
hold
Sur
vey
2011
)81
1
No.
of I
ndiv
idua
l Toi
lets
(City
Sa
nita
tion
Surv
ey 2
008-
2009
)37
81
13
10
115
103
60
373
6613
455
1
No.
of I
ndiv
idua
l Toi
lets
(H
ouse
hold
Cen
sus 2
011)
811
No.
of I
ndiv
idua
l Sep
tic ta
nks
(Hou
seho
ld C
ensu
s 201
1)74
4
No.
of C
omm
unity
Sep
tic ta
nks
0
No.
of C
omm
unity
toile
ts3
(not
in
oper
atio
n ye
t)
% o
f pop
ulat
ion
- Ope
n de
feca
tion
69%
War
dwis
e W
aste
gen
erat
ed (K
gs)
4772
.6
Tota
l no.
of s
anita
ry w
orke
rs in
th
e w
ard
16 p
erm
anen
t an
d 18
te
mpo
rary
Leng
th o
f Puc
ca ro
ad (M
ts)
2989
0Le
ngth
of K
ucch
a ro
ad (M
ts)
1062
00Le
ngth
of S
tate
Hig
hway
(Mts
)59
73
Leng
th o
f Nat
iona
l Hig
hway
(Mts
)6.
08
Leng
th o
f Roa
d si
de d
rain
s Puc
ca
(Mts
)77
70
City
Pro
file
(War
d Wi
se)
Nam
e of
the
Town
: Ram
pur B
aghe
lan
War
d #
War
d 1
War
d 2
War
d 3
War
d 4
War
d 5
War
d 6
War
d 7
War
d 8
War
d 9
War
d 10
War
d 11
War
d 12
War
d 13
War
d 14
War
d 15
Tota
lCi
ty P
rofil
e (W
ard
Wise
)Na
me
of th
e To
wn: R
ampu
r Bag
helan
Leng
th o
f Nat
ural
dra
ins (
Nal
lah)
Pu
cca/
Chan
neliz
ed (M
ts)
1361
0
Leng
th o
f Nat
ural
dra
ins (
Nal
lah)
Ku
ttch
a (M
ts)
3319
7
No.
of S
tree
tligh
ts (2
011)
5537
2040
3045
1514
2520
3019
1535
5045
0N
o. o
f Ele
ctric
ity co
nnec
tions
18
04N
ame
of T
ouris
t site
if a
ny
Nam
e of
Her
itage
site
if a
ny
Kabi
r Mat
h an
d Ra
j M
andi
r (Ro
yal
Tem
ple)
of
Parih
ar R
ajpu
t M
ahar
ajas
, Ga
rhi (
Fort
) of
Mah
araj
as
Smar
an D
uar
Man
dir
near
by
situa
ted
betw
een
two
hills
&
Ram
van
Bus s
top
(No.
)0
Bus s
tand
(No.
)1
1Pa
rks (
No.
)0
Play
grou
nd(N
o.)
11
Tota
l Pro
pert
y ta
x co
llect
ion
(in
Rs.)
2012
1697
2
Prop
erty
tax
cove
rage
(in %
) 201
249
.9%
Rem
arks
Non
e w
ithin
tow
n; N
earb
y lo
catio
ns: P
aras
man
iya
Paha
r, Ar
chae
olog
ical
site
at B
haru
t, Ba
ba R
aja
Nat
ure
Tour
ism c
entr
e, G
ovin
dji M
andi
r and
Ram
deol
a M
useu
m
Source Tubewell Well River/LakeNo. of Tubewell / River / Well 16 42 3
0.35
35
30
No
Canal from Bansagar Dam
1.47
N
7440
NA
NA
NA
Nar nadi & Pisnaha nala
13.61
Bakna River
7.77
0.06
Nar nadi & Pisnaha nala
No
350
4.7726 MT
NA
NA
NA
NA
in ward no. 5
allotted site
7.5 Ha
Within 5 km
0
NA
NH 7 & NH 75
0
Chibouraha Road
0
Tar 19.51CC 6.77
WBM 3.61Total (kms) 29.89
(kms) 106.24(kms) NA
NA
yes
NA
Rampur Main Commercial Area
Road Stretch Infront of Stadium
Along Jhusi Amarpatan Marg, near Amarpatan Tiraha
NA
450
NA
NA
NA
NA
NA
NA
_______KV Ward No. 11804
NA
NA
NAKabir Math and Raj Mandir (Royal Temple) of Parihar Rajput Maharajas, Garhi (Fort) of
Maharajas Private
NAParasmaniya Pahar, Archaeological site at Bharut, Baba Raja Nature Tourism centre,
Govindji Mandir and Ramdeola MuseumPrivate
NA
Bakna River
NA
NA
Wat
er S
uppl
y
Phys
ical
Infr
astr
uctu
re
Existing Source
SWM
Road
s
Ultimate disposal point of nallah
If site for Scientific disposal is not allotted then whether formally requested by the ULB
Distance of State Highway if nearby from the town (SH-XYZ) in Kms
Total length of Pucca roads (Kms)
Total length of Kuccha roads (kms)Gap w.r.t Standards
Name of National Highway passing from or nearby from the town (NH-XYZ)Distance of National Highway if nearby from the town (NH-XYZ) in KmsName of State Highway passing from or nearby from the town (SH-XYZ)
Is the existing site Dumping site or allotted site for Scientific disposal
Drai
nage
Herit
age
& to
uris
m
Herit
age
&
tour
ism
Envi
ronm
ent
Traf
fic &
tr
ansp
orta
tion
Stre
et li
ghtin
gPo
wer
Location of Substation http://www.mptransco.nic.inTotal no. of residential connectionsTotal no. of Commercial connections
Total no. of street lightsNo. of Streetlights under working conditionNo. of Streetlights having TubesNo. of Streetlights having CFLNo. of Streetlights having Incandescent bulbsNo. of Streetlights having LED
Bus stand (yes/No)
Frequency of Cleaning Individual Septic tanks
Total no. of vehicles in the town
No. of Streetlights having LPS
Total sewage generation (MLD)Whether any treatment plant exists (Y/N),If yes mention capacityTotal no. of individual septic tanks
Any intracity mass transport mode (yes/no)
Name of locations facing major traffic issues
Total water supply in the town (MLD)Existing Supply rate (LPCD) considering distribution lossesWater Charges per household per month (Rs.) Flat/MeteredWhether any treatment plant exists (Y/N),If yes mention capacity (MLD)Proposed source (Surface)
Sectoral Analysis
Frequency of SW collection by the ULB (1 time per day/2 times per day)Collection efficiency of the ULB (%)Any initiative for DTDC (Yes /No)Any initiative for scientific disposal of wasteName of dumping/ landfill site
Distance of the Dumping site/landfill site from main settlement area (Kms)
Length of road side drain (Kms)Coverage of road side drainage w.r.t roads (%)Ultimate disposal point of Road side drainsAny treatment plant/procedure adoptedPer capita Solid waste generation (Considering Standards) (in gms)Total SW generation
Area of allotted landfill site for Scientific disposal
No. of Tractor trolleys/vehicles available with the ULB for carrying Solid waste to the LF
Total no. of community septic tanks Total no. of Sewage/Mud pumps available with the ULB
Frequency of Cleaning Community Septic tanksName of natural nallah (Storm water drain)Length of natural nallah (Storm water drain) Kms
Duration of Electricity supply per day (in Hrs)Any subsidy for BPL (Y/N)
Name of Heritage site/s
Ownership/agencyPrevailing Heritage Act/s
Name of the street beautified as per the instructions of UADD
Sew
erag
eName of the Town: Rampur Baghelan
Phys
ical
Infr
astr
uctu
re
Ownership/agencyTotal no. of Pilgrims/ Tourists visiting town per dayName of River/Lake/Forest range/Any specific speciesPrevailing Environmental Act/sAreas facing threats
Name of Tourist site/s
Existing SourceSectoral Analysis
Name of the Town: Rampur Baghelan
1
Government 0
Beds NAPrivate 0
Beds NAN NA
Name of town
Satna
Distance (Kms)
32.3
10 Ward:1, 2, 3, 5, 7, 9, 10 4 (HS school ) & 5
(High School)Ward:15,6 & Ward:4, 9, 14,15
0 0
0 0
0
NA
Heal
th
Soci
al In
fras
truc
ture
No. of Rain Basera/Night Shelter
Ownership of Rain Basera (with ULB/Rental)Soci
al se
curit
y sc
hem
esEd
ucat
ion
No. of ITI
No. of Hospitals
Multispeciality hospital if any (Y/N)
Name of Nearby town reffered for Treatment
No. of Primary schools
No. of Secondary/High schools
No. of Colleges
No. of Primary Health centres/Dispensary
War
d N
oN
ame
of S
lum
poc
ket/
refe
renc
e na
me
Not
ified
/ U
n-no
tifie
dW
ard
popu
latio
nSl
umHo
useh
old
No.
of
Indi
vidu
al
toile
ts
No.
of
Com
mun
ity
toile
ts
No.
of P
ucca
ho
uses
No.
of S
emi
pucc
a ho
uses
No.
of K
ucch
a ho
uses
No.
of
Perm
anen
t pa
ttas
di
strib
uted
No.
of
Tem
pora
ry
patt
as
dist
ribut
ed
No.
of P
rimar
y sc
hool
in th
e sl
um p
ocke
t
No.
of P
rimar
y He
alth
cen
tres
in
the
slum
po
cket
Bene
ficia
ries
unde
r soc
ial
secu
rity
sche
mes
Any
inte
rven
tions
un
der I
HSDP
(Y
/N)
1Ko
lhan
Bas
ti &
Kol
kar B
asti
866
750
0N
AN
AN
AN
AN
A1
0N
AN
2Aj
ay N
agar
Col
ony
(2 C
lust
ers)
702
600
0N
AN
AN
AN
AN
A1
0N
AN
3Ha
rshn
agar
Nay
i Bas
ti Ka
rahi
+
Kola
n Ba
sti
Who
le W
ard
Not
ified
1424
316
10
NA
NA
NA
NA
NA
10
NA
N
4Ko
lhan
Bas
ti92
430
0N
AN
AN
AN
AN
A1
0N
AN
5Ad
ivas
i Bas
ti59
330
00
NA
NA
NA
NA
NA
10
NA
N
6W
hole
war
dW
hole
War
d N
otifi
ed18
8339
41
0N
AN
AN
AN
AN
A1
(HS
Scho
ol)
0N
AN
7Ku
rmih
a To
la76
480
00
NA
NA
NA
NA
NA
10
NA
N10
Adiv
asi B
asti
684
300
0N
AN
AN
AN
AN
A1
0N
AN
11Itm
a Ba
sti
Who
le W
ard
Not
ified
789
112
00
NA
NA
NA
NA
NA
00
NA
N
12W
hole
war
dW
hole
War
d N
otifi
ed87
453
00
NA
NA
NA
NA
NA
00
NA
N
15Ku
mbh
ar B
asti
1459
150
0N
AN
AN
AN
AN
A1
(HS
Scho
ol)
1N
AN
Tota
l10
962
1195
20
111
Slum
s & U
rban
Poo
rSe
ctor
al A
nalys
isNa
me
of th
e To
wn: R
ampu
r Bag
hela
n
Refo
rms
Achi
eved
(Y/N
)An
y Ci
ty sp
ecifi
c St
rate
gies
ad
opte
d
Prel
imin
ary
estim
ate
(if a
ny)
for i
mpl
emen
tatio
n Im
plem
entin
g ag
ency
2012
-13
2013
-14
2014
-15
2015
-16
Full
mig
ratio
n of
dou
ble
acco
untin
g Sy
stem
Nto
be
intr
oduc
edRa
mpu
r Bag
hela
n N
agar
Pal
ika
Paris
had
Prop
erty
tax
refo
rms,
85%
cov
erag
e ra
tio a
nd 9
0% c
olle
ctio
n ra
tioN
to b
e in
trod
uced
Ram
pur B
aghe
lan
Nag
ar P
alik
a Pa
risha
d
Levy
of u
ser c
harg
es :
full
reco
very
of O
& M
cha
rges
for
sew
erag
e, w
ater
supp
ly a
nd S
WM
Nto
be
intr
oduc
edRa
mpu
r Bag
hela
n N
agar
Pal
ika
Paris
had
Inte
rnal
ear
mar
king
of b
asic
serv
ices
to u
rban
poo
rN
to b
e in
trod
uced
Ram
pur B
aghe
lan
Nag
ar P
alik
a Pa
risha
d
E-go
vern
ance
Nto
be
intr
oduc
edRa
mpu
r Bag
hela
n N
agar
Pal
ika
Paris
had
Prov
isio
n of
bas
ic se
rvic
es to
urb
an p
oor i
nclu
ding
secu
rity
of
tenu
re a
t affo
rdab
le p
rices
, im
prov
ed h
ousi
ng, w
ater
supp
ly,
sani
tatio
nN
to b
e in
trod
uced
Ram
pur B
aghe
lan
Nag
ar P
alik
a Pa
risha
d
Refo
rms A
ctio
n Pl
anTi
mel
ine
to a
chie
ve re
form
s till
201
5
Nam
e of
the
Town
: Ram
pur B
aghe
lan
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- a -
CONTENTS
EXECUTIVE SUMMARY ....................................................................................................... i
CHAPTER 1 ........................................................................................................................ 1.1
1. Background .......................................................................................................... 1.1 1.1. Project Objective ............................................................................................................ 1.1 1.2. What is a City Development Plan ................................................................................... 1.1 1.3. Methodology for Preparation of CDP ............................................................................. 1.1
CHAPTER 2 ........................................................................................................................ 2.1
2. Regional Settings .................................................................................................. 2.1 2.1. A Unique Identity ............................................................................................................ 2.1 2.2. Location of Rampur Baghelan ......................................................................................... 2.2 2.3. Regional Linkages ........................................................................................................... 2.2 2.4. Satna District ................................................................................................................... 2.4 2.5. Regional Settings ............................................................................................................ 2.7 2.6. Geomorphology .............................................................................................................. 2.7 2.7. Relief ............................................................................................................................... 2.8 2.8. Soil .................................................................................................................................. 2.8 2.9. Rivers .............................................................................................................................. 2.9 2.10. Regional Resources ....................................................................................................... 2.10 2.11. Climate .......................................................................................................................... 2.15 2.12. Fringe Areas of the Town .............................................................................................. 2.15
CHAPTER 3 ........................................................................................................................ 3.1
3. Demographic Profile ............................................................................................. 3.1 3.1. Population ....................................................................................................................... 3.1 3.2. Population Growth Rate ................................................................................................. 3.2 3.3. Area of the Town ............................................................................................................ 3.3 3.4. Population Density.......................................................................................................... 3.3 3.5. Net Density ..................................................................................................................... 3.4 3.6. Sex Ratio ......................................................................................................................... 3.4 3.7. Literacy Rate ................................................................................................................... 3.6 3.8. Social Composition ......................................................................................................... 3.7 3.9. Population Projection ..................................................................................................... 3.9
3.9.1. Process ................................................................................................................................ 3.9
3.10. Issues ............................................................................................................................ 3.11
CHAPTER 4 ........................................................................................................................ 4.1
4. Economic Profile ................................................................................................... 4.1 4.1. Resources ........................................................................................................................ 4.1 4.2. Existing Economic Scenario ............................................................................................ 4.4
4.2.1. Workgroup Distribution ...................................................................................................... 4.4 4.2.2. Income Profile ..................................................................................................................... 4.6 4.2.3. Occupation Profile ............................................................................................................... 4.6
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- b -
4.2.4. Household Affordability ...................................................................................................... 4.7
4.3. SWOT analysis for Economic Scenario .......................................................................... 4.11
CHAPTER 5 ......................................................................................................................... 5.1
5. Urban Environment .............................................................................................. 5.1 5.1. Geography of the Town .................................................................................................. 5.1 5.2. Land use .......................................................................................................................... 5.2
5.2.1. Existing Landuse .................................................................................................................. 5.2 5.2.2. Proposed Landuse ............................................................................................................... 5.5
5.3. Housing ........................................................................................................................... 5.6
5.3.1. Housing Typology ................................................................................................................ 5.6 5.3.2. Status of Ownership .......................................................................................................... 5.12
5.4. Environmental Pollution ............................................................................................... 5.13
5.4.1. Water ................................................................................................................................ 5.13 5.4.2. Air ...................................................................................................................................... 5.13 5.4.3. Noise ................................................................................................................................. 5.15 5.4.4. Land ................................................................................................................................... 5.15
5.5. Fire Hazards ................................................................................................................... 5.15 5.6. Seismic Zone .................................................................................................................. 5.16
5.6.1. Previous experience in major disaster .............................................................................. 5.16
5.7. SWOT analysis for Urban Environment ......................................................................... 5.17
CHAPTER 6 ......................................................................................................................... 6.1
6. Physical Infrastructure .......................................................................................... 6.1 6.1. Traffic & Transportation .................................................................................................. 6.1
6.1.1. Existing Scenario ................................................................................................................. 6.1 6.1.2. Ongoing Proposals .............................................................................................................. 6.3 6.1.3. Issues ................................................................................................................................... 6.3
6.2. Water Supply ................................................................................................................... 6.4
6.2.1. Water Source ...................................................................................................................... 6.4 6.2.2. Water Distribution .............................................................................................................. 6.4 6.2.3. Water Tariff ......................................................................................................................... 6.8 6.2.4. Ongoing Proposals .............................................................................................................. 6.8 6.2.5. Water Demand .................................................................................................................... 6.8 6.2.6. Gap in Water Supply ........................................................................................................... 6.9 6.2.7. Issues ................................................................................................................................. 6.10
6.3. Sewerage and Sanitation .............................................................................................. 6.11
6.3.1. Existing Scenario ............................................................................................................... 6.11 6.3.2. Future Provision ................................................................................................................ 6.17 6.3.3. Gap in Sewerage and Sanitation ....................................................................................... 6.17 6.3.4. Issues ................................................................................................................................. 6.17
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- c -
6.4. Drainage ........................................................................................................................ 6.18
6.4.1. Existing Scenario ................................................................................................................ 6.18 6.4.2. Gap in Existing Drainage Network ..................................................................................... 6.19 6.4.3. Issues ................................................................................................................................. 6.19
6.5. Solid Waste Management ............................................................................................ 6.20
6.5.1. Waste Generation ............................................................................................................. 6.20 6.5.2. Waste Collection ............................................................................................................... 6.20 6.5.3. Waste Management .......................................................................................................... 6.20 6.5.4. Future Provision ................................................................................................................ 6.20 6.5.5. Issues ................................................................................................................................. 6.20
6.6. Power ............................................................................................................................ 6.21
6.6.1. Existing Scenario ................................................................................................................ 6.21 6.6.2. Future Provision ................................................................................................................ 6.22 6.6.3. Issues ................................................................................................................................. 6.22
6.7. SWOT analysis for Physical Infrastructure .................................................................... 6.23
CHAPTER 7 ........................................................................................................................ 7.1
7. Social Infrastructure ............................................................................................. 7.1 7.1. Health ............................................................................................................................. 7.1
7.1.1. Existing Health Facilities ...................................................................................................... 7.1 7.1.2. The Urban Development Plans Formulation and Implementation [UDPFI] Guidelines and GoMP Regulations .............................................................................................................................. 7.1 7.1.3. Future Provisions ................................................................................................................. 7.2 7.1.4. Issues ................................................................................................................................... 7.2
7.2. Education ........................................................................................................................ 7.3
7.2.1. Existing Educational Facilities .............................................................................................. 7.3 7.2.2. The Urban Development Plans Formulation and Implementation [UDPFI] Guidelines and GoMP Regulations .............................................................................................................................. 7.4 7.2.3. Future Provision .................................................................................................................. 7.4 7.2.4. Issues ................................................................................................................................... 7.4
7.3. Other Social Infrastructure ............................................................................................. 7.5 7.4. Issues .............................................................................................................................. 7.8 7.5. SWOT analysis for Social Infrastructure ......................................................................... 7.8
CHAPTER 8 ........................................................................................................................ 8.1
8. Urban Poverty & Slums ......................................................................................... 8.1 8.1. Poverty Profile ................................................................................................................ 8.1 8.2. Slum Population .............................................................................................................. 8.1 8.3. General Characteristics of the Slums in Town ................................................................ 8.1 8.4. Availability of Basic Infrastructure in slums .................................................................... 8.3 8.5. Issues .............................................................................................................................. 8.4
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- d -
CHAPTER 9 ......................................................................................................................... 9.1
9. Heritage & Conservation ....................................................................................... 9.1 9.1. Historic Importance of the Town .................................................................................... 9.1 9.2. Heritage Resources ......................................................................................................... 9.1 9.3. Status of Conservation of the Resources ........................................................................ 9.2 9.4. Issues ............................................................................................................................... 9.2
CHAPTER 10 ................................................................................................................... 10.1
10. Municipal Structure & Municipal Finance ............................................................ 10.1 10.1. The Municipality ............................................................................................................ 10.1 10.2. Organisation profile ...................................................................................................... 10.1 10.3. Financial Status ............................................................................................................. 10.2
CHAPTER 11 ................................................................................................................... 11.1
11. Stakeholders Participation ................................................................................. 11.1 11.1. Kick-off Workshop ......................................................................................................... 11.1
11.1.1. Minutes of Meeting........................................................................................................... 11.1
11.2. Second Stage Workshop ............................................................................................... 11.2
11.2.1. Minutes of Meeting........................................................................................................... 11.2
11.3. First District Level Presentation .................................................................................... 11.4 11.4. First State Level Review ................................................................................................ 11.5
11.4.1. Minutes of Meeting........................................................................................................... 11.6
11.5. Third Stage Workshop & Second District Level Presentation ....................................... 11.6
11.5.1. Minutes of Meeting........................................................................................................... 11.6
CHAPTER 12 ................................................................................................................... 12.1
12. City Vision .......................................................................................................... 12.1 12.1. Issues ............................................................................................................................. 12.1 12.2. Sectoral Prioritization .................................................................................................... 12.1 12.3. The Vision ...................................................................................................................... 12.2 12.4. Strategy to Overcome ................................................................................................... 12.3
CHAPTER 13 ................................................................................................................... 13.1
13. Project Identification & Project Cost ................................................................... 13.1 13.1. Identification of Projects ............................................................................................... 13.1
13.1.1. Water Supply Sector ......................................................................................................... 13.1 13.1.2. Sewerage & Sanitation Sector ........................................................................................... 13.3 13.1.3. Solid Waste Management Sector ...................................................................................... 13.6 13.1.4. Drainage Sector ................................................................................................................. 13.7 13.1.5. Slum Sector ....................................................................................................................... 13.8 13.1.6. Roads and Transport Sector .............................................................................................. 13.9 13.1.7. Environment Sector ........................................................................................................ 13.12 13.1.8. Economy Sector .............................................................................................................. 13.13 13.1.9. Land Use Sector ............................................................................................................... 13.14
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- e -
13.1.10. Social Infrastructure Sector ............................................................................................. 13.15 13.1.11. Power Sector ................................................................................................................... 13.16 13.1.12. Street Light Sector ........................................................................................................... 13.16 13.1.13. Fire Fighting Sector .......................................................................................................... 13.16 13.1.14. Health Sector ................................................................................................................... 13.17 13.1.15. Education Sector ............................................................................................................. 13.18 13.1.16. Governance Sector .......................................................................................................... 13.19
13.2. Capital Investment Plan .............................................................................................. 13.20
CHAPTER 14 ................................................................................................................... 14.1
14. Maps & Drawings ............................................................................................... 14.1 14.1. Location Map ................................................................................................................ 14.1 14.2. Regional Settings .......................................................................................................... 14.1 14.3. Local Settings ................................................................................................................ 14.1 14.4. Base Map ...................................................................................................................... 14.1 14.5. Ward Map ..................................................................................................................... 14.1 14.6. Existing Land use ........................................................................................................... 14.1 14.7. Existing Road Network .................................................................................................. 14.1 14.8. Existing Drainage Network ........................................................................................... 14.1 14.9. Existing Water Supply ................................................................................................... 14.1 14.10. Existing Social Infrastructure Network ......................................................................... 14.1 14.11. Existing Solid Waste Dumping Scenario ....................................................................... 14.1 14.12. Existing Slum Cluster Map ............................................................................................ 14.1 14.13. Existing Density Distribution (2011) ............................................................................. 14.1 14.14. Exiting Literacy Rate Distribution (2001) ...................................................................... 14.1 14.15. Exiting Sex Ratio Distribution (2011) ............................................................................ 14.1 14.16. Exiting SC Population Distribution (2001) .................................................................... 14.1 14.17. Proposed Land Use Map ............................................................................................... 14.1 14.18. Proposed Road Network Map ...................................................................................... 14.1 14.19. Proposed Sanitation Network ...................................................................................... 14.1 14.20. Proposed Social Infrastructure Network ...................................................................... 14.1
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- f -
LIST OF TABLES
Table 2.3.1. Distances of Rampur Baghelan from other major Towns ....................................................................... 2.3 Table 2.10.1. Agricultural production of Madhya Pradesh ...................................................................................... 2.10 Table 2.10.2. Mineral Production in Madhya Pradesh in the Year 2008-09 ............................................................ 2.11 Table 2.10.3. Breakup of the forests according to category - protected or reserved forests .................................. 2.14 Table 3.1.1. Demographic details of Rampur Baghelan ............................................................................................. 3.1 Table 3.1.2. Ward wise population of Rampur Baghelan, 2011 ................................................................................. 3.1 Table 3.1.3. 0-6 year population of Rampur- Comparative Assessment .................................................................... 3.1 Table 3.2.1. Growth rate of Rampur Baghelan town- Comparative Assessment ....................................................... 3.2 Table 3.4.1. Population Density of Rampur Baghelan- Comparative Assessment ..................................................... 3.3 Table 3.6.1. Sex Ratio of Rampur- Comparative Assessment ..................................................................................... 3.4 Table 3.6.2. 0-6 years Sex Ratio of Rampur- Comparative Assessment ..................................................................... 3.6 Table 3.7.1. Literacy Rate of Rampur- A comparative assessment ............................................................................ 3.6 Table 3.8.1. SC & ST population of Rampur town- Comparative Assessment ........................................................... 3.7 Table 3.9.1. Density recommended as per UDPFI guidelines ..................................................................................... 3.9 Table 3.9.2. Trial Population Projection for up to year 2036 ..................................................................................... 3.9 Table 3.9.3. Corrected Population Projection for up to year 2036 .......................................................................... 3.10 Table 3.9.4. Summary of projected Population: Rampur Baghelan (NP) ................................................................. 3.11 Table 3.9.5. Projected Number of Households: Rampur Baghelan (NP) .................................................................. 3.11 Table 4.2.1. Distribution of Population in working groups for Rampur town ............................................................ 4.5 Table 4.2.2. Workforce Participation Rate of Rampur- Comparative Assessment..................................................... 4.5 Table 4.2.3. Number of Households with different Amenities: Rampur Baghelan, 2011 .......................................... 4.7 Table 4.2.4. Status of presence of Kitchen within households: Rampur Baghelan, 2011 .......................................... 4.9 Table 4.2.5. Kitchen Fuel used by household: Rampur Baghelan, 2011 .................................................................. 4.10 Table 5.2.1. Existing Land Use, 2012: Rampur Baghelan (NP) .................................................................................... 5.4 Table 5.2.2. Proposed Land Use, Rampur Baghelan (NP): 2036 ................................................................................. 5.5 Table 5.2.3. Proposed Net Developed Area and Population density; Rampur Baghelan (NP), 2036 ......................... 5.5 Table 5.3.1. Housing Typology (vide Structure): Rampur Baghelan Town, 2001 ....................................................... 5.7 Table 5.3.2. Housing Typology (vide Material of Floor): Rampur Baghelan Town, 2001 ........................................... 5.7 Table 5.3.3. Number of census Houses (vide material of Floor) in Rampur Baghelan Town, 2011 ........................... 5.8 Table 5.3.4. Housing Typology (vide Material of Roof): Rampur Baghelan Town, 2001 ............................................ 5.9 Table 5.3.5. Number of census Houses (vide material of Roof) in Rampur Baghelan Town, 2011 .......................... 5.10 Table 5.3.6. Housing Typology (vide material of wall): Rampur Baghelan Town, 2001 ........................................... 5.11 Table 5.3.7. Number of census Houses (vide material of wall) in Rampur Baghelan Town, 2011 ........................... 5.12 Table 5.4.1. Air Pollution Parameters & Standards .................................................................................................. 5.14 Table 6.1.1. Type of Roads in Rampur town............................................................................................................... 6.1 Table 6.1.2. Length of different categories of roads present in the town as per map ............................................... 6.3 Table 6.2.1. Status of Access to Drinking water: Rampur Baghelan - Comparative Assessment ............................... 6.5 Table 6.2.2. Source of available water in Rampur Baghelan, 2011 ............................................................................ 6.5 Table 6.2.3. Number of water supply equipment in Rampur town ........................................................................... 6.7 Table 6.2.4. Location of Bore well in Rampur town ................................................................................................... 6.7 Table 6.2.5. Projected water demand for up to year 2036 ........................................................................................ 6.8 Table 6.2.6. Gap considering current supply rate ...................................................................................................... 6.9 Table 6.2.7. Total available storage capacity ............................................................................................................. 6.9 Table 6.2.8. Number of storage tank required ........................................................................................................... 6.9 Table 6.2.9. Length of existing road without Water Supply pipeline ......................................................................... 6.9 Table 6.2.10. Length of existing pipe to be replaced ............................................................................................... 6.10 Table 6.3.1. Households with bathrooms: Rampur Baghelan, 2001 ........................................................................ 6.11 Table 6.3.2. Households with bathrooms: Rampur Baghelan, 2011 ........................................................................ 6.12 Table 6.3.3. Households with latrine: Rampur Baghelan, 2001 ............................................................................... 6.13 Table 6.3.4. Households with latrine: Rampur Baghelan, 2011 ............................................................................... 6.14
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- g -
Table 6.3.5. Type of Toilets: Rampur Baghelan, 2011 ............................................................................................. 6.15 Table 6.3.6. Projected Sewer demand for up to year 2036 ...................................................................................... 6.17 Table 6.3.7. Calculation for requirement of new toilets along with septic tanks ..................................................... 6.17 Table 6.3.8. Calculation for requirement of new septic tanks ................................................................................. 6.17 Table 6.4.1. Type of Connectivity for Waste Water Outlet: Rampur Baghelan, 2011 .............................................. 6.18 Table 6.4.2. Percentage coverage of drain length .................................................................................................... 6.19 Table 6.4.3. Existing road without surface drains .................................................................................................... 6.19 Table 6.5.1. Projected MSW for year 2036: Rampur Baghelan ................................................................................ 6.20 Table 6.6.1. Source of Power: Rampur Baghelan, 2011 .......................................................................................... 6.21 Table 6.6.2. Power requirement calculation ............................................................................................................ 6.22 Table 7.1.1. UDPFI Guidelines for health facilities ..................................................................................................... 7.1 Table 7.1.2. IPHS Guidelines for health facilities ........................................................................................................ 7.1 Table 7.1.3. Projected requirements of Health Facilities ........................................................................................... 7.2 Table 7.2.1.Details of High Secondary and Higher Secondary Schools in Rampur ..................................................... 7.3 Table 7.2.2. UDPFI guidelines for educational facilities in a town ............................................................................. 7.4 Table 7.2.3. Projected Educational facilities for up to year 2036 ............................................................................... 7.4 Table 7.3.1. Households availing banking services, Rampur Baghelan, 2011 ............................................................ 7.5 Table 7.3.2. UDPFI Guidelines about community facilities in small town .................................................................. 7.7 Table 7.3.3. Requirement of Community facilities in the town.................................................................................. 7.7 Table 7.3.4. Location of Cremation grounds: Rampur Baghelan (NP) ........................................................................ 7.7 Table 8.2.1. Notified Slum wards: Rampur Baghelan (NP) ......................................................................................... 8.1 Table 8.2.2. Identified Slum clusters: Rampur Baghelan (NP) .................................................................................... 8.1 Table 8.4.1. Road, Water Supply, Drainage, Sanitation, Street Light & Household Electricity in Rampur
Baghelan ............................................................................................................................................... 8.3 Table 10.1.1. Administrative setup of the town ....................................................................................................... 10.1 Table 10.2.1. Organisation Profile: Rampur Baghelan (NP) ...................................................................................... 10.1 Table 12.4.1. Sectoral Strategy: Rampur Baghelan 2012 ......................................................................................... 12.3 Table 13.1.1. Projects Identified under water supply sector for Phase I: Rampur Baghelan (NP) ........................... 13.1 Table 13.1.2. Projects Identified under water supply sector for Phase II: Rampur Baghelan (NP) .......................... 13.2 Table 13.1.3. Projects Identified under water supply sector for Phase III: Rampur Baghelan (NP) ......................... 13.2 Table 13.1.4. Locations identified for public toilets: Rampur Baghelan (NP) ........................................................... 13.3 Table 13.1.5. Projects Identified under Sewerage & Sanitation Sector for Phase I: Rampur Baghelan (NP) ........... 13.4 Table 13.1.6. Projects Identified under Sewerage & Sanitation Sector for Phase II: Rampur Baghelan (NP) .......... 13.5 Table 13.1.7. Projects Identified under Sewerage & Sanitation Sector for Phase III: Rampur Baghelan (NP) ........ 13.5 Table 13.1.8. Projects Identified for Solid Waste Management Sector for Phase I: Rampur Baghelan (NP) ........... 13.6 Table 13.1.9. Projects Identified for Solid Waste Management Sector for Phase II: Rampur Baghelan (NP) .......... 13.6 Table 13.1.10. Projects Identified for Solid Waste Management Sector for Phase III: Rampur Baghelan (NP) ....... 13.6 Table 13.1.11. Project Identified for Drainage sector for Phase I: Rampur Baghelan (NP) ...................................... 13.7 Table 13.1.12. Project Identified for Drainage sector for Phase II: Rampur Baghelan (NP) ..................................... 13.7 Table 13.1.13. Project Identified for Drainage sector for Phase III: Rampur Baghelan (NP) .................................... 13.7 Table 13.1.14. Project Identified for Slum Development sector for Phase I: Rampur Baghelan (NP) ...................... 13.8 Table 13.1.15. Project Identified for Slum Development sector for Phase II: Rampur Baghelan (NP) ..................... 13.8 Table 13.1.16. Project Identified for Slum Development sector for Phase III: Rampur Baghelan (NP) .................... 13.8 Table 13.1.17. Locations identified for public toilets: Rampur Baghelan (NP) ......................................................... 13.9 Table 13.1.18. Project Identified for Road & Transport sector for Phase I: Rampur Baghelan (NP) ...................... 13.10 Table 13.1.19. Project Identified for Road & Transport sector for Phase II: Rampur Baghelan (NP) ..................... 13.11 Table 13.1.20. Project Identified for Road & Transport sector for Phase III: Rampur Baghelan (NP) .................... 13.11 Table 13.1.21. Project Identified for Environment sector for Phase I: Rampur Baghelan (NP) .............................. 13.12 Table 13.1.22. Project Identified for Environment sector for Phase II: Rampur Baghelan (NP) ............................. 13.12 Table 13.1.23. Project Identified for Environment sector for Phase III: Rampur Baghelan (NP) ............................ 13.12 Table 13.1.24. Project Identified for Economic Development sector for Phase I: Rampur Baghelan (NP) ............ 13.13 Table 13.1.25. Project Identified for Economic Development sector for Phase II: Rampur Baghelan (NP) .......... 13.13 Table 13.1.26. Project Identified for Economic Development sector for Phase III: Rampur Baghelan (NP) .......... 13.13
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- h -
Table 13.1.27. Project Identified for Land Use sector for Phase I: Rampur Baghelan (NP) .................................... 13.14 Table 13.1.28. Project Identified for Land Use sector for Phase II: Rampur Baghelan (NP) ................................... 13.14 Table 13.1.29. Project Identified for Land Use sector for Phase III: Rampur Baghelan (NP) .................................. 13.14 Table 13.1.30. Project Identified for Social Infrastructure sector for Phase I: Rampur Baghelan (NP) .................. 13.15 Table 13.1.31. Project Identified for Social Infrastructure sector for Phase II: Rampur Baghelan (NP) ................. 13.15 Table 13.1.32. Project Identified for Social Infrastructure sector for Phase III: Rampur Baghelan (NP) ................ 13.15 Table 13.1.33. Project Identified for Power sector for Phase I: Rampur Baghelan (NP) ........................................ 13.16 Table 13.1.34. Project Identified for Street Light sector for Phase I: Rampur Baghelan (NP) ................................ 13.16 Table 13.1.35. Project Identified for Fire Fighting sector for Phase I: Rampur Baghelan (NP) .............................. 13.16 Table 13.1.36. Project Identified for Health Sector for Phase I: Rampur Baghelan (NP) ....................................... 13.17 Table 13.1.37. Project Identified for Health Sector for Phase II: Rampur Baghelan (NP) ...................................... 13.17 Table 13.1.38. Project Identified for Health Sector for Phase III: Rampur Baghelan (NP) ..................................... 13.17 Table 13.1.39. Project Identified for Education Sector for Phase I: Rampur Baghelan (NP) .................................. 13.18 Table 13.1.40. Project Identified for Education Sector for Phase II: Rampur Baghelan (NP) ................................. 13.18 Table 13.1.41. Project Identified for Education Sector for Phase III: Rampur Baghelan (NP) ................................ 13.18 Table 13.1.42. Projects Identified for Governance Sector for Phase I: Rampur Baghelan (NP) ............................. 13.19 Table 13.1.43. Projects Identified for Governance Sector for Phase II: Rampur Baghelan (NP) ............................ 13.19 Table 13.1.44. Projects Identified for Governance Sector for Phase III: Rampur Baghelan (NP) ........................... 13.19 Table 13.2.1. Capital Investment Plan for Phase I: Rampur Baghelan (NP) ........................................................... 13.20 Table 13.2.2. Capital Investment Plan (as per expenditure of the Municipality only) for Phase I: Rampur
Baghelan (NP) ................................................................................................................................... 13.35 Table 13.2.3. Estimated Project Cost for Phase II: Rampur Baghelan (NP) ............................................................ 13.45 Table 13.2.4. Estimated Project Cost for Phase III: Rampur Baghelan (NP) ........................................................... 13.47
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- i -
LIST OF FIGURES
Figure 1.3.1. Methodology ......................................................................................................................................... 1.2 Figure 2.2.1. Location of Rampur Baghelan town in Satna District of Madhya Pradesh ............................................ 2.2 Figure 2.4.1. District map of Madhya Pradesh ........................................................................................................... 2.4 Figure 2.4.2. Tehsil wise Percentage Share of Satna District's Total Population ........................................................ 2.5 Figure 2.4.3. Percentage of Urban Population in all the Tehsils in Satna District: 2011 ............................................ 2.5 Figure 2.4.4. Tehsil wise Percentage Share of Satna District's Urban Population, 2011 ............................................ 2.6 Figure 2.4.5. Decadal Population Growth Rate of the Tehsils in Satna ...................................................................... 2.6 Figure 2.5.1. Regional Settings: Rampur Baghelan ..................................................................................................... 2.7 Figure 2.7.1. Terrain around the town ....................................................................................................................... 2.8 Figure 2.9.1. River Basins in Madhya Pradesh ............................................................................................................ 2.9 Figure 2.10.1. Production in Satna District ............................................................................................................... 2.10 Figure 2.10.2. Mineral map of Madhya Pradesh ...................................................................................................... 2.11 Figure 2.10.3. Location of Cement Plants near Satna .............................................................................................. 2.12 Figure 2.10.4. Forest Map of Madhya Pradesh ........................................................................................................ 2.14 Figure 3.1.1. Proportion of 0-6 year population, Rampur .......................................................................................... 3.2 Figure 3.2.1. Population Trend in Rampur Baghelan town ........................................................................................ 3.2 Figure 3.4.1. Ward wise Population Density, Rampur Baghelan, 2011 ...................................................................... 3.3 Figure 3.5.1. Ward wise Net Density as calculated from satellite imagery, 2011 ..................................................... 3.4 Figure 3.6.1. Distribution of Population in Rampur town according to sex ............................................................... 3.4 Figure 3.6.2. Trend of Sex Ratio in Rampur comparative assessment .................................................................... 3.5 Figure 3.6.3. Ward Wise Male Female Population, Rampur town ............................................................................. 3.5 Figure 3.7.1. Percentage of Literacy: Rampur Baghelan town, 2011 ......................................................................... 3.6 Figure 3.7.2. Ward wise Literacy Rate, Rampur ......................................................................................................... 3.7 Figure 3.8.1. Ward Wise Percentage of SC population in Rampur town .................................................................... 3.8 Figure 3.8.2. Ward Wise Percentage of ST population in Rampur town .................................................................... 3.8 Figure 4.1.1. Work Force Distribution: Rampur 2001- Comparative Assessment ...................................................... 4.1 Figure 4.1.2. Area under Cultivation of Different Cereals in Satna region ................................................................. 4.2 Figure 4.1.3. Area under Cultivation of Different Pulses in Satna region ................................................................... 4.2 Figure 4.1.4. Area under Cultivation of Different Oil seed in Satna region ................................................................ 4.3 Figure 4.2.1. Distribution of workers; Rampur ........................................................................................................... 4.4 Figure 4.2.2. Sector wise worker distribution, Rampur .............................................................................................. 4.4 Figure 4.2.3. Ward wise Work Force Participation Rate of Rampur ........................................................................... 4.5 Figure 4.2.4. Income Profile of Rampur Baghelan town............................................................................................. 4.6 Figure 4.2.5. Occupation Profile of Rampur Baghelan town ...................................................................................... 4.6 Figure 4.2.6. Percentage of Households with Different Asset base: Rampur Baghelan, 2011- Comparative
Assessment ........................................................................................................................................... 4.8 Figure 4.2.7. Percentage of households having kitchen: Rampur Baghelan, 2011- Comparative Assessment .......... 4.9 Figure 4.2.8. Percentage of Households using different kitchen fuel: Rampur Baghelan, 2011- Comparative
Assessment ......................................................................................................................................... 4.10 Figure 5.2.1. Land use Percentage in Rampur Baghelan, 2012 .................................................................................. 5.4 Figure 5.2.2. Proposed Land Use in Percentage: Rampur Baghelan (NP), 2036 ......................................................... 5.5 Figure 5.3.1. Type of uses and their Percentage (of the Census Houses) in the region ............................................. 5.6 Figure 5.3.2. Housing Typology (vide Structure), 2001- Comparative Assessment .................................................... 5.6 Figure 5.3.3. Housing Typology (vide Material of Floor), Rampur Baghelan Town, 2001 - Comparative
Assessment ........................................................................................................................................... 5.7 Figure 5.3.4. Housing Typology (vide Material of Floor), Rampur Baghelan, 2011- Comparative Assessment ......... 5.8 Figure 5.3.5. Housing Typology (vide Material of Roof), Rampur Baghelan Town, 2001- Comparative
Assessment ........................................................................................................................................... 5.9 Figure 5.3.6. Housing Typology (vide material of Roof), Rampur Baghelan Town, 2011- Comparative
Assessment ......................................................................................................................................... 5.10
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- j -
Figure 5.3.7. Housing Typology (vide material of wall), Rampur Baghelan Town, 2001-Comparative Assessment ......................................................................................................................................... 5.11
Figure 5.3.8. Housing typology (vide material of wall), Rampur Baghelan Town, 2011- Comparative Assessment ......................................................................................................................................... 5.12
Figure 5.6.1. Seismic Map of Madhya Pradesh ........................................................................................................ 5.16 Figure 5.6.2. Seismic Map of Madhya Pradesh ........................................................................................................ 5.16 Figure 6.1.1. Road length distribution in Rampur Baghelan ...................................................................................... 6.2 Figure 6.1.2. Vehicles: Growth Trend, Satna District ................................................................................................. 6.3 Figure 6.2.1. Availability of Drinking Water: Rampur Baghelan, 2011- Comparative Assessment ............................ 6.5 Figure 6.2.2. Main Source of Drinking Water: Rampur Baghelan, 2011- Comparative Assessment .......................... 6.6 Figure 6.2.3. Percentage length of water supply line: Rampur Baghelan (NP) .......................................................... 6.7 Figure 6.3.1. Status of presence of Bathroom in Households-Comparative Assessment ........................................ 6.11 Figure 6.3.2. Status of presence of Bathroom in Households: Rampur Baghelan, 2011- Comparative
Assessment ......................................................................................................................................... 6.12 Figure 6.3.3. Status of Presence of Latrine in Households, Rampur Baghelan 2001-Comparative Assessment ...... 6.13 Figure 6.3.4. Status of Presence of Latrine in Households: Rampur Baghelan, 2011- Comparative Assessment .... 6.14 Figure 6.3.5. Type of Sanitation: Rampur Baghelan, 2011- Comparative Assessment ............................................ 6.15 Figure 6.3.6. Usage of Public Latrine: Rampur Baghelan, 2011- Comparative Assessment ..................................... 6.16 Figure 6.3.7. Ward wise Percentage of Households with toilet in Rampur town in 2008-09 .................................. 6.16 Figure 6.4.1. Type of Connectivity for Waste Water Outlet: Rampur Baghelan, 2011- Comparative
Assessment ......................................................................................................................................... 6.19 Figure 6.6.1. Source of Household energy consumption: Rampur, 2011- Comparative Assessment ...................... 6.22 Figure 7.3.1. Households availing banking services: Rampur Baghelan, 2011- Comparative Assessment ................ 7.5 Figure 8.3.1. Percentage distribution of BPL population Ward wise: Rampur Baghelan (NP) ................................... 8.2 Figure 10.1.1. Nagar Panchayat Office of Rampur Baghelan ................................................................................... 10.1 Figure 12.2.1.Status of Different sectors in Rampur town, Citizens Views, 2012 .................................................... 12.1 Figure 12.2.2. Sectoral Prioritisation, Citizens Views: Rampur, 2012 ...................................................................... 12.2
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- k -
LIST OF PHOTOS
Photo 2.3.1. National Highway 75 connecting Rampur with Satna on the west and Rewa on the east .................... 2.3 Photo 2.10.1. Prism Cement Plant, Satna ................................................................................................................. 2.12 Photo 2.10.2. JP Bela Cement Plant, Rewa ............................................................................................................... 2.12 Photo 2.10.3. Maihar Cement Plant ......................................................................................................................... 2.13 Photo 4.1.1. Site near the Bansagar Canal (left& centre) and Bansagar canal near it (right) .................................... 4.3 Photo 5.1.1.Rampur Baghelan Town- a Reconnaissance ........................................................................................... 5.1 Photo 5.1.2. Nar River- An important feature of Rampur's geography ...................................................................... 5.2 Photo 5.2.1. Development pattern in Rampur Main area ......................................................................................... 5.2 Photo 5.2.2. Development Pattern in Hanuman Ganj Area ....................................................................................... 5.2 Photo 5.2.3. Development along NH 75 ..................................................................................................................... 5.3 Photo 5.2.4. Development along Chibouraha Road .................................................................................................. 5.3 Photo 5.2.5. Land use along Amarpatan Marg/ Jhusi Road ....................................................................................... 5.3 Photo 5.2.6. Bansagar Canal (left) and other water channels i.e. Nala in the town (centre & right) ........................ 5.3 Photo 5.4.1. Overall Cleanliness of Rampur town .................................................................................................... 5.13 Photo 5.4.2. Nar River (left) and other Nala (centre & right) in the town ............................................................... 5.13 Photo 6.1.1. Satna Rewa Road (National Highway 75) ............................................................................................... 6.1 Photo 6.1.2. Bus Stand along Satna Rewa Road (NH 75)............................................................................................ 6.2 Photo 6.1.3. Internal Roads of Rampur Main area; Mainly Concrete Roads .............................................................. 6.2 Photo 6.2.1. Canal from Bansagar Dam to Rampur.................................................................................................... 6.4 Photo 6.2.2. Water tank at Hanumanganj .................................................................................................................. 6.4 Photo 6.4.1. Nar River, the main drainage channel in Rampur ................................................................................ 6.18 Photo 6.4.2. Nallas near the southern boundary of the town in Rampur ................................................................ 6.18 Photo 6.6.1. MPEB office in Rampur Baghelan ........................................................................................................ 6.21 Photo 7.1.1. Community Health Centre at Rampur ................................................................................................... 7.1 Photo 7.2.1. Higher Secondary School at Rampur ..................................................................................................... 7.3 Photo 7.2.2. Primary School at Rampur ..................................................................................................................... 7.3 Photo 7.3.1. Post office, Rampur; Photo 7.3.2. Police Station, Rampur ............................... 7.5 Photo 7.3.3. Court, Rampur Baghelan ........................................................................................................................ 7.6 Photo 7.3.4. Stadium in Rampur Baghelan ................................................................................................................. 7.6 Photo 7.3.5. Community Centre in Rampur ............................................................................................................... 7.6 Photo 7.3.6. Shops in the Hanuman Ganj Area (left & centre) shops in Rampur Main (right)................................... 7.7 Photo 7.3.7. Market Area in Rampur Main ................................................................................................................ 7.7 Photo 8.3.1. Slum Clusters: Rampur Baghelan (NP) ................................................................................................... 8.2 Photo 9.2.1. Rampur Palace Entrance ........................................................................................................................ 9.1 Photo 9.2.2. Other religious & historic structures of Rampur Baghelan .................................................................... 9.1 Photo 10.3.1. Status of Tax Collection: Rampur Baghelan (NP), 2012 ..................................................................... 10.2 Photo 11.1.1. Proceedings of "Kick-off" Workshop in Rampur Baghelan ................................................................ 11.1 Photo 11.2.1. Proceedings of the second workshop in Rampur Baghelan ............................................................... 11.3 Photo 11.3.1. Proceedings of the First District Level Presentation .......................................................................... 11.4 Photo 11.4.1. Proceedings of the First State Level Presentation ............................................................................. 11.5 Photo 11.5.1. Proceedings of the third Workshop at Rampur Baghelan ................................................................. 11.7
MP CDP PHASE II RAMPUR BAGHELAN CITY DEVELOPMENT PLAN
REPORT NO. IWIN-SL/12-13/F/CDP/R0/019
- i -
EXECUTIVE SUMMARY
Government of Madhya Pradesh, Urban Administration and Development Department, for the betterment of the local populace, has initiated the process of a planned and integrated development in the State. One of the major initiatives in this direction is formulation of a City Development Plan for all the Urban Local Bodies across the State. I-Win Advisory Services (Formerly known as ICICI-Winfra) has been assigned for the preparation of Rampur Baghelan City Development Plan-2036. A City Development Plan [CDP] is to think systematically of the future and to determine how it wishes to shape that future. It sets a vision for the city to be achieved within a stipulated period of time, in sync with the character of the city and in consensus with its stakeholders. It charts out the course of action so that the city is enabled to reach the goal within the target period. A CDP helps in enhancing the livability, sustainability and manageability of the city.
A CDP is essentially a strategy which focuses on
The development of economic, physical and social infrastructure
Strategies that deal specifically with issues affecting the urban poor
Strengthening of Municipal Governments and their financial accounting and budgeting systems and procedures and
Ensuring a better service delivery mechanism for all the citizens The preparation of the city development plan has been a multi-stage activity like Reconnaissance Survey, extensive Consultation with Stakeholders, Consultation with and validation from the Departmental Heads, Data Collection, Existing situation assessment or City Profiling, Identification of gaps in infrastructure and service, estimation for future demand of physical and social infrastructure, based on population projections, Identification of strategies, projects and programmes for services and infrastructure, Formulation of the Capital Investment Plan, Formulation of the Financial Operating Plan. Rampur Baghelan Municipal Area of 23.54 sq km is located in Satna district, in the north eastern part of Mad