View
225
Download
0
Category
Preview:
Citation preview
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 6
COMPANY PROFILE
CONTENTS
CABLE MANAGEMENT SYSTEMS ................................................................................................................... 8
CABLE TRAY SUPPORT SYSTEM WITH ACCESSORIES .................................................................................... 9
1 - AL-MISBAH HOUSE FOR STEEL WORKS COMPANY ................................................................................ 10
2 - APPROVED FROM ALL GOVERNMENT DEPARTMENT ........................................................................... 10
3 - ACHIEVEMENTS...................................................................................................................................... 10
4 - PROJECTS ............................................................................................................................................... 11
5 - QUALITY AND STANDARDS .................................................................................................................... 11
6 - LABORATORY LOAD TEST CERTIFICATES ................................................................................................ 12
7 - AL-MISBAH DIVISIONS AND PRODUCTS ................................................................................................ 12
8 - LIST OF ON GOING / COMPLETED PROJECTS ......................................................................................... 13
AL FANAR COMPANY PROJECTS ............................................................................................................. 13
AL TOUKHI CO. FOR INDUSTRIAL & TRADING PROJECTS ........................................................................ 13
SIEMENS PROJECTS ................................................................................................................................. 14
ABB CONTRACTING CO. PROJECTS ......................................................................................................... 14
DRAKE & SCULL INTERNATIONAL PROJECTS ........................................................................................... 14
AL RASHID TRADING & CONTRACTING CO. PROJECTS ........................................................................... 15
AL FOUZAN TRADING & GENERAL CONTRACTORS PROJECTS ................................................................ 15
RAKAN TRADING & CONTRACTING CORP. PROJECTS ............................................................................. 15
AL JABRIYA EST. PROJECTS ...................................................................................................................... 15
AL FANAR IBEM PROJECTS ...................................................................................................................... 16
AL-ARRAB CONTRACTING CO. PROJECTS ................................................................................................ 16
TAROUK CONTRACTING CO. PROJECTS .................................................................................................. 16
TECHNO PROJECTS .................................................................................................................................. 16
AL HOKAIR CONTRACTING CO. PROJECTS .............................................................................................. 17
SWAYEH CO. LTD PROJECTS .................................................................................................................... 17
MOBCO CONTRACTING CO. PROJECTS ................................................................................................... 17
AL KIFAH CONTRACTING EST. PROJECTS ................................................................................................ 17
RAWND TECHNICAL CO. LTD PROJECTS ................................................................................................. 17
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 7
COMPANY PROFILE
CONSTRUCTION SKILLS EST. PROJECTS ................................................................................................... 17
M. A. AL KHARAFI SONS CO. PROJECTS .................................................................................................. 18
SOUTH STAR EST. PROJECTS ................................................................................................................... 18
E.A. JUFFALI & BROTHERS PROJECTS ...................................................................................................... 18
VATECH (FORMER MEEPPCO.) PROJECTS ............................................................................................... 18
MEEDCO MIDDLE EAST ENGINEERING & DEVELOPMENT CO. LTD. PROJECTS....................................... 18
SAUDI ETA ............................................................................................................................................... 18
SALMOC ( SAUDI LEBANESE ) PROJECTS ................................................................................................. 18
SAUDI BINLADIN GROUP PROJECTS ........................................................................................................ 18
AL HARBI CONTRACTING CO. PROJECTS ................................................................................................. 18
OTHER PROJECTS .................................................................................................................................... 18
SCECO SUB STATIONS PROJECTS LIST (2009-2013) ............................................................................... 20
AL-FANAR SCECO PROJECTS.................................................................................................................... 20
AL-TOUKHI CONTRACTING COMPANY SCECO PROJECTS ....................................................................... 20
SIEMENS COMPANY LIMITED SCECO PROJECTS ..................................................................................... 20
AREVA T&D [COGELEX] LTD. SCECO PROJECTS ....................................................................................... 20
ABB CONTRACTING CO. LTD SCECO PROJECTS ....................................................................................... 20
SAUDI SERVICES FOR ELECTROMECHANIC WORKS SCECO PROJECTS .................................................... 21
AL-ARAB POWER SCECO PROJECTS......................................................................................................... 21
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 8
COMPANY PROFILE
CABLE MANAGEMENT SYSTEMS
CABLE TRAY
Technical Details at Catalogue Page No: 26
CABLE LADDER
Technical Details at Catalogue Page No: 53
CABLE TRUNKING
Technical Details at Catalogue Page No: 66
JUNCTION BOX
Technical Details at Catalogue Page No: 82
CHANNELS AND FITTINGS
Technical Details at Catalogue Page No: 90
PULL BOXES
Technical Details at Catalogue Page No: 82
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 9
COMPANY PROFILE
CABLE TRAY SUPPORT SYSTEM WITH ACCESSORIES
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 10
COMPANY PROFILE
1 - AL-MISBAH HOUSE FOR STEEL WORKS COMPANY
AL MISBAH FABRICATORS is a leading and specialized company in designs & manufacturer of superior quality of Metallic
Cable Tray / Cable Management System.
AL MISBAH FABRICATORS has been established under very modest conditions in Riyadh since more than 20 years.
Covering the Saudi Arabian market with a separate entity, technically and financially, running a professional operation in
the metal works field.
AL MISBAH FABRICATORS highly skilled engineers and technicians are working to guarantee the best work performance
which leads to meet customer expectations into getting the best quality.
2 - APPROVED FROM ALL GOVERNMENT DEPARTMENT
AL MISBAH FABRICATORS has all registered and valid licenses.
1. Industrial Investment License
2. Certificate Of Membership
3. Company Registration Certificate
4. General Organization For Social Insurance (GOSI)
5. Saudization Certificate
6. Zakat Certificate
3 - ACHIEVEMENTS
AL-MISBAH FABRICATORS manufacture Quality Products in accordance with NEMA VE – 01 Metallic Cable Tray System
and National and International standards related to CMS. We are following standards as prescribed by Saudi Electricity
Company and other well-known contractors. That’s why we are awarded approvals from the following establishments
and agencies.
1. ISO 9001:2008
2. Saudi Electricity Company – Transmission and Distribution Department
3. Saudi Electricity Company - Generation Department
4. SABIC – Saudi Basic Industries Corporation
5. Ministry of Interior
6. Ministry of Health
7. Ministry of Finance
8. Ministry of Higher Education Commission
9. Ministry of Defence and Aviation
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 11
COMPANY PROFILE
4 - PROJECTS
AL-MISBAH FABRICATORS has completed hundreds of projects successfully. AL-MISBAH FABRCATORS got honor to work
on renowned eminent projects like KAUST (King Abdullah University of Science and Technology), Saudi ARAMCO Project
“Main Infrastructure Package” through Al-Khafji Join Operations & Dar-Handasah, Saudi ARAMCO O.M & E Building,
Riyadh Refinery and a lot SCECO projects. There are other hundreds of distinguished projects Al-Misbah Co. has
completed. The list of Al-Misbah Co. projects is appended in Company Profile for the reference. At this time Al-Misbah
Fabricators delivering its products and services to well-known projects like KAFD (King Abdullah Financial District), ITCC
(Information Technology and Communication Complex), CUC (Shamiya Extension Project Makkah Central Utility
Complex), Shoiba Sub Station project, Jabal Omar Project and many others.
5 - QUALITY AND STANDARDS
AL-MISBAH FABRICATORS is a quality oriented company and always follows the local (SEC) and International Standards
that’s why we are able and capable of delivering our products and services on eminent projects which follows and
maintains the highest quality. Al-Misbah Co. following the below prescribed standards.
1. NEMA VE – 01
2. 24 TMSS – 01 (SEC)
3. ASTM (A123)
4. BS 729
5. NFPA 70, NEC (Article 392)
6. ANSI
7. SEAS 104 (Saudi ARAMCO Standard)
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 12
COMPANY PROFILE
6 - LABORATORY LOAD TEST CERTIFICATES
AL-MISBAH FABRICATORS products are verified and tested by the renowned laboratories of Saudi Arabia like Al-Hoti
Stangers and King Saud University. The technical reports and images of load testing is appended in Mill Certificates
Section of Pre-Qualification.
7 - AL-MISBAH DIVISIONS AND PRODUCTS
CABLE MANAGEMENT SYSTEM DIVISION
STAINLESS STEEL DIVISION ELECTRICAL PANEL BOARD
DIVISION
1. Cable Trays [Aluminum] 2. Cable Trays [MG Steel] 3. Cable Trays [HDG Steel] 4. Cable Ladders [Aluminum] 5. Cable Ladders [HDG Steel] 6. Cable Trunks [MG and HDG] 7. Under Floor Trunks & Boxes 8. Channels and Support System 9. Pull Boxes 10. Various Cable Tray 11. Installation Accessories
1. Hand Rails 2. Balustrades 3. Glass Balustrades 4. Grab Rails 5. Columns Cladding 6. Wall Cladding 7. Ceilings 8. Planter Boxes 9. Pull Handles and
Others
1. Dual Star-Delta control panel 2. Water level switch control
panel 3. Direct on Line control panel 4. Photocell control panel 5. Controller panels with B.M.S 6. KWH Meter Panels 7. MOB (Main Distribution
Boards) 8. SMDB (Sub Main Distribution
Boards) 9. MCC (Motor Control Center) 10. ATS (Auto Transfer Switch) 11. PLC Control Panels 12. SCECO Standard Panels
and Many Others.
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 13
COMPANY PROFILE
8 - LIST OF ON GOING / COMPLETED PROJECTS
AL FANAR COMPANY PROJECTS
1. WadiJaleel 380/110/13.8kv Outdoor Substation In Makkah With Sceco - W
2. Transformer Reinformcement At 132/33kv In Qassim With Sceco - C
3. 110kv Gis Al-Naga Substation In Madinah With Sceco - W
4. El20 DughaitherCentria
5. New 110/13.6kv Al Sharaieh Substation. 4019 Makkah
6. New Thuwal Substation 380/110 Kv Project
7. Rabigh Power Plant Project
8. Al Shisha Substation 140/13.8 Kv
9. Package-I Phase IE – Electrical Power Substations and Associated Civil Works For Four (4) 132/13.8 KV Substations At King
Abdullah Financial District Project.
10. Project of New Substation 132/13.8 KV # 8167, Ext. To S/S 9015 And Installation of 132 KV Cable Circuits (8167-9015) &
(8167-8118)
11. Construction of 132/13.8kV Substation No. 8133 , alfanar Industrial Area. Ref # PE 87
12. Construction of Jazan Economic City (JEC) 380/132 KV BSP (Contract No. 08-PKI-001/00)
13. Construction of New 132/13.8KV S/Stn No. 8905 at Al Maseef Area, Hail City. Ref # PE 85
14. Sharourah Power Plant Extension
15. Package Assembly S/S – LV Factory Riyadh
16. Extn. Of New 110/13.8kv Jabal Al Noor S/S Makkah Pe68(L)-031 Dtd 03-09- 2007
17. Electro Mechanical Works For Al-Qaser Mall Al Riyadh
18. Electro Mechanical Works For AlFanar Ceramic Factory Extension At Riyadh
19. Power Supply to Saudi Aramco East/West Pump Station # 3
20. Cow Farm Nadek Project
AL TOUKHI CO. FOR INDUSTRIAL & TRADING PROJECTS
21. Habil, Samakh&Mikhwa Substation WithSceco - S, Contract No. 18/Aa/03-Mh/002/19-132/33kv.
22. Sabt Al Jarah Substation With Sceco - S ( Contract 18/Aa/03-Mh/007/20)
23. 380kv KhulaisSubstaion With Sceco – W Contract No. 98/1/20
24. SUBSTATION WITH SCECO - C SEC-CRB Cont.# 508/22/3- Construction Of 132/13.8KV. S/S # 8067
25. SUBSTATION WITH SCECO - C SEC-CRB Cont.# 510/22/3- Construction Of 132/33KV. S/S # 8021
26. SUBSTATION WITH SCECO - CSEC-CRB Cont.# 512/22/3- Construction Of 132/13.8KV. S/S # 8102
27. SUBSTATION WITH SCECO - CSEC-CRB Cont.# 535/22/3- Construction Of 132/13.8KV. S/S # 8050
28. Constraction Of 132/33 Kv/Al Muhayil North S/S Sec-Srb Contract No. 40331097/00
29. Jizan Central Power Station Extension Contract No. 48421110/00
30. Arar Generation Expansion Project Sec-Eoa Contract No. 30421007/00
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 14
COMPANY PROFILE
31. Rafha Generation Expansion Project Sec-Eoa, Contract No. 30421008/00
32. Construction Of New 132/13.8kvs/S8828 Buraida, Qassim Contract #. 10531189/00
33. PP8 SIMPLE CYCLE POWER PLANT EXTENTION CONTRACT #. 10721002/00
34. Construction of Souch Olaya Substation 8156, Shumeisi Substation Contract No. 10931068/00
35. Construction of Shumaisi Substation 8151, South Olaya Substation 8156, Manfoha Substation 8134 & 2nd Industrial City
Substation 8174 – Contract No. 10931062/00
36. Construction of Madina East 380/110 KV BSP – Contract No. 20831037/00
37. Construction of New 132/13.8 KV Substation 8121,8144, 8128, 8160
38. Construction of New Madinah East 380/110 KV BSP – Contract Sec-Woa 20831037/00
39. Construction of .132/13.8 KV Substation Al-Aziziah - Contract No. 10731041/00
40. Construction of New Madina East 380/110 KV Grid Station BSP Project
41. Reinforcement of Wadi Al Dawaser PP Contract # 10721153/00
42. Construction of Souch Olaya Substation 8156, Shumeisi Substation Contract No. 10931068/00
SIEMENS PROJECTS
43. Qassim Substation 8800
44. Static Var Compensator (SVC) Qassim Project
45. Static Var Compensator (SVC) Afif Project
46. DDP Project Site PP9, Riyadh
47. 380 KV Substation 9019, PP9, Riyadh
48. New Qassim 380 KV Substation 9025
49. Sudair 9011 Substation Project
50. New Qassim 380 KV Substation 9025
ABB CONTRACTING CO. PROJECTS
51. Khamis West Substation
52. Sec-Srb's Projects
53. Habil Capacitor Banks Project No. C-S-71130
54. Arar Power Planet Contract No. 30531176/00
55. Svc AtMuhayil S/S Project. Sec-Srb Contract No. 119/2002
56. Reinforcement Of 230/69 KV Bsps& Reactive Compensation In DOA Project.
57. 380/110/33kv Wadi Al - Fara Substation Contract #. 80/1/23
58. Qureyyah - 2 PP Integration, 380 KV Switching Station Phase I Contract #. 3061078/00
59. Half Moon 380 KV Switching Station Phase II Contract #. 3061078/00
60. Jamia Substation Jeddah
DRAKE & SCULL INTERNATIONAL PROJECTS
61. King Abdullah University - Rabigh
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 15
COMPANY PROFILE
62. Taparjal Hospital – Taparjal
63. Gosi Park – Riyadh
64. Prince Noora University – Riyadh
65. Pain D’or Plant Arabic Bread Area
66. Tabarjal Hospital – 2nd Floor
67. King Khaled Hospital Extension
68. Gosi Park-MSR#40929, 40930,40932
69. KAPSARC
AL RASHID TRADING & CONTRACTING CO. PROJECTS
70. Shoaiba Housing - Shoaiba
71. Prince Sultan H.S.C. - Al Kharj
72. IPA College - Riyadh
73. Al Rashid Mall - Al Khobar
74. United Command Center Force (Uccf)
75. King Saud University - Riyadh
76. King Khaled University - Abha (Package 3)
AL FOUZAN TRADING & GENERAL CONTRACTORS PROJECTS
77. Saudi Arabian National - Guard ( Sang )
78. General Support & Maintenance Unit (Gsmu )
79. (National Guard) Girls College - Qseem
80. Othaim Supper Market - Qassim
RAKAN TRADING & CONTRACTING CORP. PROJECTS
81. Saudi American Bank - Jeddah
82. Saudi British Bank - Riyadh, Dammam
83. Kateef , Hafuf, Jubail
84. Al Rajhi Bank - Qaseem, Yanbu, Rastanourah
85. Hail Hospital - Hail
AL JABRIYA EST. PROJECTS
86. Al Munajjem Commercial Center - Riyadh
87. Dalmaza Factory
88. Almadinah Hotel – AlmadinahAlmonawarah
89. Diet Center - Riyadh
90. G.P.S. Hotel – Riyadh (Deplomatic Area)
91. Oger Electric Campus – Riyadh (Dryaeah)
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 16
COMPANY PROFILE
AL FANAR IBEM PROJECTS
92. Al Fanar Ware House Sulai - Riyadh
93. NADEC Cow Farm - Kharj
94. ORIENT HOUSE ELECTROMECHNICAL CO.
95. Stars Hotel – Aqaba, Jordan
96. EMMAR PROJECT – AMMAN, JORDAN
97. SOOFI MALL – AMMAN, JORDAN
98. AQABA CAMPOUND AND HOTEL – AQABA, JORDAN
99. CARREFOUR – AMMAN, JORDAN
100. AMMAN DESIGN CENTER – AMMAN, JORDAN
AL-ARRAB CONTRACTING CO. PROJECTS
101. King Faisal University - Alahsa
102. RassMishab
103. Al-Ahsa Medical Center - Alahsa
104. Crcc - Riyadh
105. Madina Hospital - Almadinah
106. Yamama Cement Factory - Riyadh
107. Vip Terminal - Riyadh
108. Qkvc Al-Kharj Project
109. Rjn Project
110. Rsc Project
TAROUK CONTRACTING CO. PROJECTS
111. Masharek Tower
112. Marriot Court Yard
113. Haqbani Tower
114. View Tower
115. Huda Villa
116. View Tower
TECHNO PROJECTS
117. APU - Hyper Panda - Riyadh
118. Jareer Plaza-Dhahran
119. Al Othaim Mall (Rabwah) - Riyadh
120. Flamingo Mall (Carrefour) - Riyadh
121. Al-Murjan Tower - Riyadh
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 17
COMPANY PROFILE
AL HOKAIR CONTRACTING CO. PROJECTS
122. Sahara Mall - Riyadh
123. Plaza Mall C/W (Giant) – Riyadh
124. Salam Mall C/W (Giant) – Riyadh
125. Al-Azeez Mall C/W (Giant) – Jeddah
126. Arabian Mall C/W (Giant) – Jeddah
127. Nakheel Plaza C/W (Giant) – Qassim
128. Noor Mall C/W (Giant) – AlmadinahAlmonawarah
129. Al Ahsa' Mall C/W (Giant) – Al Hafoof
130. Al Dhahran Mall C/W (Giant) – Al Dhahran
SWAYEH CO. LTD PROJECTS
131. Saudi American Bank - H.O.K.T
132. Girls College – Hail
133. National Guard Hospital - Riyadh
134. Tahleya Center
135. A.C.C. Project
136. Stc. Customer Care Building - Riyadh
137. Najran Water Project –Najran
138. Ahu And Electric Works - Riyadh
MOBCO CONTRACTING CO. PROJECTS
139. Bait 13 - Riyadh
140. Al-Sheikh Tower - Riyadh
141. Saudi HolandI Bank - Khubar
AL KIFAH CONTRACTING EST. PROJECTS
142. Ministry Of Education - Intermediate
143. College - Riyadh
144. Comprehensive Rehabilitation
145. Center – Ehsaa
RAWND TECHNICAL CO. LTD PROJECTS
146. Prince Noora University – Riyadh ( Pnu)
147. KING ABDULLAH FINANCIAL DISTRICT - RIYADH
CONSTRUCTION SKILLS EST. PROJECTS
148. Pension Fund - Riyadh
149. KANARY BUSINESS CENTER - RIYADH
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 18
COMPANY PROFILE
150. BIN TAMI CENTER – RIYADH
M. A. AL KHARAFI SONS CO. PROJECTS
151. MipKhafji Project
152. K.J.O. ARAMCO Project
SOUTH STAR EST. PROJECTS
153. Girls College - Dammam
154. Girls College - Riyadh
155. King Faisal University – Alahsa
E.A. JUFFALI & BROTHERS PROJECTS
156. S.T.C Customer Care Bldg. – Riyadh
157. National Guard-43 Battalian Project
158. Rotana - Kingdom Tower
VATECH (FORMER MEEPPCO.) PROJECTS
159. Al-Moasem 110/13.8kv Substation In Minah With Sceco - W, Material
MEEDCO MIDDLE EAST ENGINEERING & DEVELOPMENT CO. LTD. PROJECTS
160. 132kv Substation No. 8066,8078 & 8110 With Sceco - C,
SAUDI ETA
161. Sabic Head Quarters - Riyadh
162. Qassim Medical Services Project-Al Qassim
SALMOC ( SAUDI LEBANESE ) PROJECTS
163. Pension Fund Project - Riyadh
164. Arcade Center
SAUDI BINLADIN GROUP PROJECTS
165. D O K A A E - Makkah
166. Jamarat – Minah (Makkah)
AL HARBI CONTRACTING CO. PROJECTS
167. Al Wajh Hospital
168. TURAIF HOSPITAL - TURAIF
OTHER PROJECTS
169. Stc. Project - Riyadh
170. Alhayat Mall - Riyadh
171. Different Projects
172. K.J.O Office Park Buidg. Iip-143
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 19
COMPANY PROFILE
173. Dar Al Anjjal School & Different Projects.
174. King Saud University - Riyadh
175. King Saud University - Riyadh
176. Apu - Hypermarket - Riyadh
177. Different Projects
178. National Guard
179. Girls College
180. Al Moosa Center
181. Girls College
182. Passport Office - Riyadh
183. Cdhq ( Civil Defense Head Quarter )
184. Al Salam Plaza Hypermarket & Shopping Mall
185. Supplying A Lot Of Materials For Aramco Projects
186. Al Bade' A Mall - Riyadh
187. King Fahad Industrial Port – Al Jubail
188. Jezan Hospital - Jezan
189. Commercial Housing Complex - Riyadh
190. Commercial Complex
191. Fun Center
192. Crown Hotel
193. Mubarak Center
194. Prince Salman Social Center - Riyadh
195. Extension Of Factory
196. Commercial Center - Riyadh
197. Al Jazeera Bank Riyadh
198. Loan Bank - Riyadh
199. GIRLS COLLEGE - JEDDAH
200. G.P.S. Hotel Low Current System - Riyadh
201. Hilton Hotels ( Jeddah &Madinah )
202. Al Faisaliyah Tower - Riyadh
203. Al Rusies Center
204. Paindoor Power Plant
205. Different Projects
206. Kingdom Tower Center
207. Ruhmaniya Commercial Center Alkhobar
208. Ncci Project - Riyadh
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 20
COMPANY PROFILE
209. PP 11-Dorman-Riyadh
SCECO SUB STATIONS PROJECTS LIST (2009-2013)
AL-FANAR SCECO PROJECTS
210. 380KV BSP Hail & Al-Jouf
211. 380KV BSP Hail & Al-Jouf
212. 380KV BSP Hail & Al-Jouf
213. S/S # 8167,Riyadh
214. S/S 8905 Hail City
215. S/S 8133 at Al- Fanar Industrial Area, Riyadh
AL-TOUKHI CONTRACTING COMPANY SCECO PROJECTS
216. Makkah North S/S. Contract No. 21031092
217. Qurtuba Sub Station. Contract No. 10731040
218. Qassim - 3 380 KV BSP S/S. Contract No. 11031072
219. 4 S/S Riyadh Contract No. 10931062
220. Madinah East 380/110 KV BSP S/S.
221. Contract No. 20831037
222. Al-Aziziah 132/13.8 KV S/S Contract No. 10731041 and Al-Naseem Contract No. 10731042
223. Reinforcement of Wadi Al Dawaser PP Contract No. 10721153
SIEMENS COMPANY LIMITED SCECO PROJECTS
224. 380 KV GIS Building Shoaiba Power Plant Jeddah
225. SVC Hiteen S/S Site Riyadh
226. DDP Qassim S/S Project
227. SVC Afif S/S Project
228. PP9 380 KB S/S 9019 Project Riyadh
229. New 380 KV S/S Qassim
230. Sudair 9011 S/S
AREVA T&D [COGELEX] LTD. SCECO PROJECTS
231. KFH Riyadh S/S Project
232. Al-Naqrah 380 KV S/S Project Riyadh
233. KEC 1 and KEC 2 S/S Madinah Project
234. PFC S/S West Jeddah
235. Power Factor Correction In Western Sector
ABB CONTRACTING CO. LTD SCECO PROJECTS
236. 33 KV and 13.8 KV S/S For Central and Eastern Region Contract No. 108311061
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 21
COMPANY PROFILE
237. Qurayyah-2 PP Half Moon Phase - II
238. Contract: 3061078
239. 230 KV Integration of Faras P/P Generation
SAUDI SERVICES FOR ELECTROMECHANIC WORKS SCECO PROJECTS
240. New Dhahran South 380/115/13.8 KV BSP
241. New 132/13.8 S/S 813 King Saud University, Riyadh
242. Durrat S/S Project
AL-ARAB POWER SCECO PROJECTS
243. Duba and Tabook Power Plant S/S Project
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 22
COMPANY PROFILE
ON GOING PROJECTS
SR COMPANY NAME PROJECT NAME PROJECT VALUE
1 Al-Arrab Contracting Company Hafer – 8E 400,623.00
2 Al-Sayed Partners Cont. Co. 112,400.00 اعمال التکیف لمستشفی الحبیب
3 Al-Arrab Contracting Company SUTA 8181-E 21,820.00
4 Empower Contracting Company Prince Majed Palace 263,332.00
5 Toledo Arabia Arabian Pipelines Project 216,036.00
6 Al-Arrab Contracting Company SADH 81685-E 179,684.98
7 Al-Fanar Contracting Co. Expansion of 380Kv BSP # 9007 341,544.50
8 Al-Fanar Contracting Co. Construction of Waad Al-Shaamil 380KV BSP44003661 1,074,981.07
9 Al-Arrab Contracting Company NIND 8183-E 179,864.98
10 Al-Arrab Contracting Company ROWD 8256-E 179,684.98
11 Al-Toukhi Contracting Co. Project Code: 101010131 196,125.00
12 Empower Cont. Co. King Abdullah Foundation Project 147,029.00
13 Al-Mashariq Cont. Co. Construction of Al-Mukhtarah SS 792,500.50
14 Al-Bawani Cont. Co. Project ID: WH-61155 91,352.26
15 Al-Arrab Cont. Co. ABWR 8860-E 256,795.86
16 Siemens Dhahran South SS 120,000.00
17 Al-Arrab Cont. Co. Nariyah-E 184,922.50
18 Drake and Scull Al-Dara Hospital Phase II 407,295.00
19 Saudi Amana P.O 000958 124,874.25
20 Al-Fanar Contracting Company PE131 (L) – 142 23,134.66
21 Axal Arabia Construction Co. DISP-E-MSR-008 227,055.66
22 Al-Arrab Cont. Co. KAP 4 – Elstom Land Road 138,678.15
CABLE MANAGEMENT SYSTEM DIVISION COMPANY PROFILE & ORG. CHART
Document # SAL-PQ-V3.0
Section # 04
AL-MISBAH HOUSE FOR STEEL WORKS COMPANY Eff. Date 01-Jan-2015
Page 23
COMPANY PROFILE
23 Al-Arrab Cont. Co. KAP 4 – Elstom Land Road 232,004.50
24 Al-Rashid Trading & Cont. Co. Residential Projects of Ma’aden – Turaif 129,734.15
25 Al-Muhaidib Cont. Co. Jazan GC 133,000.00
26 Al-Arrab Cont. Co. Aziz.8211-E 179,864.98
27 Al-Mashariq Cont. Co. Construction of Najran Airport East 420,000.00
28 Inma Utilities Cont. Co. Shamiah Makkah 218,000.00
29 Siemens SVC Safaniya 195,000.00
30 Saudi Oger LTD 8478-KAP1 (Central) 10,349,350.65
ORGANIZATION HIERARCHY CHART AL-MISBAH HOUSE FOR STEEL WORKS COMPANY
ABBREVIATIONSCMS – Cable Management SystemS.S.T – Stainless SteelE.P.B – Electrical Panel BoardMR – Management RepresentativeHR – Human ResourceQC – Quality ControlQA – Quality AssuranceGRO – General Relations OfficerD&E – Design & Engineering
Document # QM-ORG-01 Revision # “08” Eff. Date: 07 FEB 2017 Rev. Date: 7 FEB 2017
CHIEF EXECUTIVE OFFICER
Engr. Ali Saad Ali Al-Herbawi
Mr. Naser Al-Herbawi
Factory Manager
Accounts Department
Accounts Manager
Mr. Ammar Elshaer
Accountant
Mr. Muraad Mustafa
Supply Chain Management
Mr. Saad / Manager
HR Department
Mr. Naveed & AbdulkareemHR Officer
Assistant / Purchasers
Mr. Ahmed & Mr. Ahmed Faras
Finished Goods WH
Engr. Muthu & Engr. Shafeek
Raw Material WH
Mr. Abdulhadi
Dispatch & Transporation
Vehicle Drivers
Finance & Accounts Department
Mr. Yazan / CFO
Maintenance Department
Mr. Mosab Habashy
Mechanical Maintenance
Mr. Shateesh Sasi
Electrical Maintenance
Labors
Production Department
Labors
Associate Engr. Nuhman
Draftsman
Labors
Engr. Muthulingam
CMS Production Engineer
Engr. Shafeek Sulaiman
Production Supervisor
Associate Engr. Shareef
SST Production Engineer
Associate Engr. Renny
Site Engineers
Mr. Munir Bari
Production Supervisor
Engr. Abdulkadeer
EPB Production Engineer
Engr. Shahnawaz
Draftsman
Production Supervisor
Mr. Yousaf Adeeb
Technical & Design Dept
Engr. Taha / Manager
Draftsman
Associate Engr. NuhmanEngr. Abdulkadeer
Engr. Syed Shahnawaz
Quality Department
Mr. Naveed / Manager
Engr. Fahad JabbarEngr. Fahad Bilal (Saudi)
QC Engineers
MANAGEMENT BOARD
1 – Engr. Ali Saad Ali Al-Herbawi2 – Mr. Naser Saad Ali Al-Herbawi3 – Engr. Bara’a I. Al-Amro4 – Engr. Taha Mutwakel
Govt. Relations Officers
Mr. Thamer HumaidaniMr. Mohd Fahad Sawaiyeh
Sales Department
Sales Secretary
Mr. Al-Khalib
Engr. Bar’a / Sales Manager
Pricing and Invoicing
Associate Engr. Basheer
Sales Executives
Sales Executives
Mr. Yasser Imran
Mr. Ali Shahbaz Bajwa
Showroom Sales Point
Recommended