BWMS retro it installation and operation6 November 2020 • 09:00-09:45 GMT

Ballast WaterWebinar Week

Part of

4-6 November 2020

Sponsored by

Panellist documentsPage 2: John Loaiza, BioMarine ServicesPage 9:Tom Hazen, Hyde MarinePage 14: Shobhit Agarwal, Maersk Line

BioMarine Services Ltd

BioMarine Services Limited (Reg. No. 10424111) is a limited company registered in England and Wales. Registered Office. Unit 21, Building A, 1st Floor 99-109 Lavender Hill, Battersea Business Centre, London, England, SW11 5QL

WHO WE ARE

BioMarine Services Ltd is a specialist service provider for Marine

environmental services. We have an extensive experience in ballast water

sampling, Sampling for VGP and BWMS installation.

Our VisionTrusted partner in marine

environmental services

Project Management

BW Installation

Manufacturer

Engineering Company

Shipyard

Shipowner

Class

Service provider for

Commissioning testing

BWTS PROJECT MANAGEMENT

The principal affected for the delays is the Shipowner• Correct planning• Communications between the parties• Prefabricating Components• Crew training• Sampling for Commissioning testing• Interference with other systems

BACKLOG, DELAYS, COST OVERRUNS

BWTS Installation and Commissioning

IMO require sample and analysis during commissioning of BWMS on board shipsBMS is an approved service provider for conducting commissioning testing for BWMS. For more information https://www.biomarineservices.co.uk/commissioning-testingBMS offer engineering services for BWTS installation;3D scanningBWMS selection and feasibility studyDetail Engineering drawing and documentationCommissioning testing

BWMS Commissioning testing

Success criteria for commissioning testing:1. Sampling of BW dischargeWe conduct combine of detail and indicative analysis

2. Assessing self monitoring parametersObserve BWMS operation.analyse residual TRO, UVT

We provide complete report to flag/RO to satisfy IMO circular BWM.2/Circ 70, as may be amended and additional flag specific requirement, if any for the commissioning testing of BWMS.

This report and Class initial survey report is the two document needed to issue IBWMC certificate to the ship.

Service provider should be independent from the BWMS manufacturer or supplier

BMS Service portfolioBMS service portfolio include various sampling, consultancy and engineering services.BWMS and Biofouling product developmentPort BWMS feasibility studyIMO D-2 compliance samplingBWMP, BFMP developmentCrew training Biofouling prevention feasibility study – offshore, Fish farming, yacht and leisure industries.

Contact us:Hot Line: +44 (0) 7783849115T: + 44 (0) 2079244487Email : admin@biomarineservices.co.ukwww.biomarineservices.co.uk

THANK YOU

Tom HazenSales Engineer

thomas.hazen@kuraray.com

6-November-2020

Riviera Maritime – Ballast Water Webinar Week

BWMS Retrofit Installation and Operation

Full Project ExecutionEstimates indicate as many as 10,000 vessels per year are to be retrofit from 2021 – 2024– Only systems certified in accordance with the modified IMO Type Approval

guidelines can be installed, limiting equipment selection

Commonly held industry belief is that a minimum of 12 months should be allocated for BWTS project execution

System Selection Pre-Engineering Ship-Specific

Engineering Class Submittal Flag SubmittalProduction

Drawing Preparation

Equipment Production

Equipment Installation Commissioning

© Hyde Marine 2020 | Slide 3

Is the system correctly specified?

The devil is in the details• Specific vessel parameters have a significant impact on the

equipment configuration

How is it operated?Where does the crew conduct ballast operations from?

Factory-witnessed testing can identify flaws and enable corrections to be made before system arrives onsite.

© Hyde Marine 2020 | Slide 5

The more frequent communication between all parties (maker, engineering firm, installation contractor, operator) the more effective and successful a project execution will be.

Plan early and plan often

Classification: Internal

Retrofit and supervision of BWTS project-How to ensure quality is maintained

Riviera Maritime Ballast Water Webinar Week - 06th Nov 2020

ShobhitAgarwalProjectManager,Maersk

.

Classification: Internal

AGENDA

|2

Int roduct ionPlanningPreparat ionQualit yTimeline

Classification: Internal

AGENDA

|3

Int roduct ionPlanningPreparat ionQualit yTimeline

Planning

Class Approved Drawings

Shipyard Specification & Drawings

BWTS Equipment Readiness

Vessel Readiness

Supervision Planning

Shipyard/Installation Schedule – Location & Date

Successful Commissioning

Drawings

Specifications

Maker

Vessel

Shipyard

Logistic

Classification: Internal

AGENDA

|5

Int roduct ionPlanningPreparat ionQualit yTimeline

Preparation

Vessel Preparation (Ballast Tank, Ballast System, BWTS

Installation Area etc )

Shipyard Preparation ( Pre-fabrication of spools/foundation

, Pressure Tests etc)

Logistic Arrangement (Equipment delivery to yard,

Auxiliaries etc)

Service & Commissioning Engineers Arrangement

Liaison with laboratory for Ballast Water Sampling &

Analysis Preparation

Classification: Internal

AGENDA

|7

Int roduct ionPlanningPreparat ionQualit yTimeline

Quality

Standards/Specification to be shared with Engineering

Partner (Pipe Material/coating/cables/breaker etc)

Shipyard Specification to include all details (Web/hull

penetration etc )

Material Certificate

Welder’s Certificate

Pressure Test Certificates

Overboard Valves ( Certificates/ pressure testing etc)

Pressure Testing of Pre-fabricated spools

NDT testing

Classification: Internal

AGENDA

|9

Int roduct ionPlanningPreparat ionQualit yTimeline

Timeline

Readiness prior vessel arrival in Shipyard

Gantt Chart from Shipyard ( Total days, Docking days etc)

Docking Jobs

Commissioning Time

Training Time

BW Sample & Analysis Time ( Single/Two Pass system,

Holding time etc)