Burgettstown Area Sch-ool District PROUDLY PRESENIS -
B·urgettstown Area Junior· Senior High School
Dedication and Open House
Sunday,. June23, 1963
·facts
BY TME CALENDAR
N-ovember, 1956 - BURGETTSTOWN AREA MERGED SCHOOL DISTRICT created by vote of the electorate of Burgettstown Borough, Jeffe;rson and Smith Townships.
December, 1956 - Application for secondary school space allocations submitted £or ap· proval to the Department . of Public Instruetion.
March, 1966 - R00m schedule and space allo· cations received from Department of Public Instructic:>n and State Public Scheol Building Authol'ity approves financing of project.
May, 1960 BURGETTSTOWN AREA SCHOOL DISTRICT, State Public School Building Authority and A. E. Tennyson,
·Architect sign professional agreemeat and leases far construction of BURGETTS' TOWN AREA SCHOOL DISTRICT Junior-Senior High School Building.
Figures
JUNE, 1960 - Preliminary building plans submitted for approval to Department · 0£ Pul:llic Instruction and State Public School Building Authority.
MAY, 1960 - Final building plans accepted and approved by all state agencies. ecmstruction bids advertised, received aad l'e· viewed.
June, 1961 - Fiaal bids awardec:l August, 1961 - .Construction started September, 1961 - Movable furnitul'e aacl
equipment specified and prepared for biddiag January, 1963 - Furniture bids received, re
viewed and awarded. March, 1963 - Furniture delivery cemmenGes
partial occupancy requested and obtaiaes fer school purposes.
.May, 1963 - Cc;mstruction cempleted. June, 1963 - D~dication ceremonies.
BY THE D~LLA!l
General Construction Contract, Baker & Coombs, Inc. Morgantown, W. Va.
$1,167,500.00
Movable Furniture and Ecquipment ::•$150,000.00 .
Site Cost (Development 0f Site, Sewage and Legal Fees)
Electrical .Constructicm Contract Baldwin Electric
Washington, Penna. $179,102.00
Heating & V entHating Construction Contract
Chapman Plumbiag Co. Washingten, Pa.
$184-,137.00 Plumbing Construction Contract
Ca.rdest Plumbing Co. Pittsburgh, Penna.
$160,140.00 Test Borings $4,686.00
Architect's Fee A. E. Tennyson, Architect
Pittsburgh 28, Penna. $101,733.95
$71 ,328.U eontingency Fees (Boncl Oisc0UBt, ll'lterest During C0nstructien, Inspectiea
and Change Chders .:::$204,362.@0
Total Cost ·of Building Freject $.2,222,989.08
Estimated Anrnual R.eatal $~' 134,~33. n
Amount of Rental Reimbursement $65,280.31
Amount ef Leeal EH0rt $69,253.36
Constructien . and Equi~meHt Cest Fer; FuF>il $1,602.08 .
* TG be adjusted ]Den cling -fiRal ee_§ts an<:!. a·uGl.i t oy J?epartment of Public;: IF1structi0F1
Dedication The National Anthem
Prayer of Dedication ·
Union High School Sand Director, J. ]. Snyder
Program Greetings & Introduction of Platform Guests & Speaker . . . . .. ..... . Dr. James J . Tinney, Supervising Principal
Address ... . ... . ...... . . . .... . .. . .. .. . . . Dr. Douglas J. Bowman HIGH SCHOOL Washington Co. Superintendent of Schools
Presentation of Key . . . . .... . . .. .. . . .. . . · A. :E. Tennyson, Architect
GYMNASIUM (Representing State Public School Bldg. Authority & Contractors)
Acceptance of Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Clyde E. Fox .... . . President Board of School Directors
June 23, 1963 Presentation of Key .. . . . .. ... ... . .......... .. ... ... R. Donald Hall Principal Senior High School
Presentation of Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ronald Johnston President Student Council
Alma Mater .. . .. .. ......... . . ... . .. . . .... . Union High School Band
Open House & Guided Tour of School . . . . . . . . Stude.nt Government
SIGNIFICANT ROOM SCHEDULE AND CONSTRUCTION FACTS Student Capacity - 1260 Building Contains:
27 Standard Classrooms 4 Science Rooms 2 Music and Choral Rooms 3 Shops 3 Homemaking Rooms 2 Art Rooms 1 Library 1 Auditorium (Capacity 260) 1 Cafeteria 1 Conference Room 2 Locker Rooms
2 Shower Rooms 1 Kitchen 1 Administrative & Guidance
Suite (Eight Offices -& Vault) 1 Health ~uite (Consisting of 5
rooms and toilet) 14 Toilet Rooms 11 Storage Rooms 3 Faculty Rooms 1 Student Activity Room 3 Gymnasiums
CONSTRUCTION FEATURES Floor Construction - Slab on grade; Terrazzo, Asphalt Tile, Ceramic Tile
and Hardwood. Wall Construction - Exterior: C. R. Wing Panel 2" glass block & masonry
Interior: Masonry, Steel Studs, Lath and plaster_:. Structural System - C. R. Wing Column & Beam - Masonry Wall Bearing. Roof Construction - Steel deck plus 1" Insulation; 5 Ply Built-up. Ceiling Finishes - Plaster & Acoustic Tile. Windows - Double strength "A" with heat resistant glass .
(Aluminum Sash) Lighting - Fluorescent - Incandescent. Heating System - Gas Fired - Hotwater. Cubical Contents - 1,680,000 Cu. Ft. Construction Cost Per. .Cu. Ft. - $1.03 'Gross Area- 111,700 Square feet Construction Cost Per Square Foot - $15.56
Facts
1957 Louis I. Robert
President
Donald W. Baileys _ Treasurer
Joseph Bertovich Alban Dalverny Morris Harvey
Carl Latella William Prata Joseph Roberts
E. 0. Wagner Vice-President
Ermil E. Caleffie Secretary
Edward Jackson John Jones
Robert R. Kidd
James 0. Smalley Van Nest Wiegmann
John Zelenko
Carl Latella President
Ermil E. Caleffie Secretary
Joseph Bertovich ?dorris Harvey
Joseph Roberts
1959 John Jones
Vice-President
Donald W. Baileys Treasurer
Edward Jackson William Prata
Van Nest Wiegmann
James 0. Smalley
Contractors
Faculty
Board of
)irectors
ennys0111
M orris Harvey President
Ermil E. Caleffie Secretary
Carl Latella
1961 1 oseph Bertovich
Vice-President
James 0. Smalley Treasurer
Van Nest Wiegmann
Clyde E . Fox President
1963
Ermil E . Calefii~
Secretary
1 oseph Bert:ovich
Eugene Petricca Vice-Pl."esident
Paul PcsoHu.sk~ Treasurer
Harry Sabatasse
Edward J ackson Paul Tucci
Administratio
James J. Tinney . . . . . . .... . . . .
Faculty
Andrew T . Sedlak hemas §haneyfelt
James E . Smith Archie @. Thames
Ml's. It·ene Thames Theresa M. Tiano Mrs. Dorothy Vukotich Mrs. Eleanor Wilson :Pat Yanni
16
BCRl 18.
BURGETTSTOWN AREA SCHOOL DISTRICT JUNIOR·SENIOR.
HIGH SCHOOL FLOOR PLAN
0 0
0 0
0 0
0 0
0 · D
(Second Floor)
181iiCR2
(First Floor)
TOUR GUIDE
L Starr In Main Lobby 2. Junior High School Wing 3. Double Size Classroom 4. Corridor Lavatories
Storage Rooms, Lockers 5. Stairwell - Room For Ad
ditional Classrooms 6. Covered Walks and Bus
Loading Area 7. 2nd Floor Junior High
School Wing 8. Corridors - Lavatories
Storage Rooms - Lockers 9. Art & Crafts Room 10. Biology Lab & Office 11. General Science Labs 12. Chemistry - Physics Labs 13. Senior High Class Room
Wing 14. Language Lab 15. Stairwell Room For Ad
ditional Classrooms 16. Corridor - Lavatories
Storage Rooms - Lockers 17. Double Size Classroom 18. Business Suite 19. Homemaking Suite 20. Library 21. Shops & Mech Drawing
~__ ____ _J 22. Cafeteria & Kitchen 23. Gym & Locker Rooms 24. Teacher's Lounge 25. Health Suite 26. Stage & Auditorium 27. Music Room . 28. Guidance & General Office
NORTK ___.,