BUILDING SEISMIC INSTRUMENTATION

USING STRONG MOTION ACCELEROGRAPHS

National Structural Code of the Philippines 2010

Chapter 1, Section 105

105.2 Earthquake-Recording and Instrumentation

105.2.1 General

Unless waived by the Building Official, every building in Seismic Zone 4 over 50 m in

height shall be provided with not less than three approved recording accelerographs.

The accelerographs shall be interconnected for common start and common timing.

Seismic Zone 4

DPWH IRR on Earthquake Instrumentation

Benefits of Installing Accelerographs BETTER SEISMIC DESIGN

1. Prove the dynamic model used in the building design process

2. Validate or improve seismic design codes

RAPID ASSESSMENT AND DAMAGE MITIGATION

3. Monitor structural response during an earthquake

4. Provide information used in post-earthquake actions

5. Interact with automatic shutdown controls to minimize damage

6. Provide data useful to the retrofit process

BUSINESS CONTINUITY

7. Reduce the monitored structure’s post-earthquake non-operational downtime

Sample Earthquake Response

Engineering Solution

Displacement Time-History

Drift Ratio

Damage Condition

Post-Earthquake Assessment

Building Occupancy

Resumption Program

Engineering Solution

Immediate Occupancy Life Safety Collapse Prevention

EMERGENCY RESPONSE PLANNING:

THE QUEZON CITY SAFE BUILDING PROGRAM

THE BIG PICTURE

FOR POLICY MAKERS

FOR OWNERS AND

OPERATORS

FOR FACILITY

MANAGERS

FOR OCCUPANTS AND

RESIDENTS

Improve safety mandates for the public and

showcase the city’s growth

Save money by reducing downtime and continue

business as usual

Better manage decisions on evacuation and

reoccupation

Increase confidence in safety and avoid panic

during state of emergency

IMPLEMENTATION

MONITORS AND

OUTPUTS

W E

B

O U

T P

U T

MONITORS AND OUTPUTS

W E

B

O U

T P

U T

MONITORS AND OUTPUTS

W E

B

O U

T P

U T

MONITORS AND OUTPUTS

W E

B

O U

T P

U T

MONITORS AND OUTPUTS

IMMEDIATE OCCUPANCY LIFE SAFETY COLLAPSE PREVENTION

Questions

?

Maraming

Salamat!

Recommended