Briefing for Professional Services for
MPA No. L1186 RFQ Joint Operations Center (JOC)
L1186 JOC – Briefing Agenda
• Statement of Qualifications - requirements
• Joint Operations Center - overview
• Scope of Services
• What Massport is looking for in this team
• Questions
Project Organization Chart MPA Board
CEO
CORPORATE SECURITY AND EMERGENCY PREPAREDNESS
CHIEF SECURITY OFFICER George Naccara
CAPITAL PROGRAMS DIRECTOR
Houssam Sleiman, P.E. , CCM
CAPITAL PROGRAMS PROJECT MANAGER
Wendy Riggs-Smith AIA, CCM, LEED
L1186 Consultant Team
JOC Working Group • Aviation: Facilities, Operations & Security • Capital Programs • Corporate Security and Emergency
Preparedness • Fire Rescue • Ground Transportation • Information Technology • Legal • Maritime Police • State Police
L1186 JOC - Supplemental Package
Supplemental Information Package
• available on Massport website & on CD
L1186 Statement of Qualifications Submission shall include: • Detailed information in response to the evaluation criteria • Architect/Engineer & Related Services questionnaires SF 330 • Current M/WBE Certification Letter of the prime and
subconsultants • Litigation and Legal proceedings information, signed under
the pains and penalties of perjury, in a separate sealed envelope.
L1186 Qualifications Submittal Application may be rejected if any of the required information is not provided. • Cover Letter, • Ability to obtain requisite insurance, • Litigation and Legal proceedings, • Registration of the Board of Director as defined in MGL
Chapter 7C Section 44, • SF330 Part IIs for the Prime and every sub-consultant.
The above-mentioned information shall be highlighted in the Cover Letter.
L1186 Qualifications Submittal Evaluation criteria – experience of team with: 1. Similar project types, project services, 2. Project understanding and quality of technical approach to this project, 3. JOC & COP facilities, PSIM, PSAP and Dispatch Systems, 4. BIM Model and management of a BIMxP (BIM Execution Plan), 5. Lean Planning, Lean Construction, long-term experience working
collaboratively with CMs, 6. Location & availability of PM, resident inspectors key project personnel, 7. Perform work with minimal disruption to airport and security operations, 8. Familiarity with MGL Chapter 149 and MGL Chapter 149A, 9. Cost management and scheduling capabilities, 10. M/WBE and affirmative action efforts, (proposed % of participation), 11. Current level of work with & past performance for the Authority, and 12. Sustainable design concepts and resiliency project planning. Address each criteria - In the order outlined
L1186 Qualifications Submittal Key Dates:
EVENT DATE/TIME
Submission of written questions Monday 15-Dec-2014 (noon)
Answers published (Estimated) Monday 22-Dec- 2014
Quals submission deadline Thursday 29-Jan-2015 (noon)
Questions may be sent via email to: CPBidQuestions@massport.com
Joint Operations Center – Why? 1. Geographically dispersed dispatch centers 2. Complex and evolving operational environment 3. No Common Operational Picture (COP) during incidents 4. Other airports have successfully followed recommendations
for a JOC (e.g., Baltimore, Phoenix, San Antonio) 5. Compelling or persuasive current events (Boston Marathon
bombing, LAX active shooter incident, stowaways, Hurricane Sandy, VIP visits, multi-agency exercises and drills)
6. Consensus on location
Joint Operations Center – How? 1. Consolidate Massport’s complex operations (public safety,
and security) creating a unified management of incidents 2. Upgrade, consolidate, and integrate technology and systems 3. Integrate solutions for incident alerting, security breaches,
cameras, and communications (LAX, BWI, SFO, PANYNJ) 4. Faster and more informed decisions/responses due to
immediate situational awareness (COP) 5. Timely and efficient allocation of critical resources
JOC Needs Analysis
• People / Functions – Mass State Police – Fire-Rescue – Port Police – TSA – Airport OPS – T-16
• Information flow • Technology • Workforce and training
Information Technology IT and communications systems:
• Expand on and integrate with existing systems; • Physical Security Information Management (PSIM) • Public Safety Answering Point (PSAP) – plan for primary • Computer Aided Dispatch (CAD) • Records Management System (RMS) • Mobile Incident Management – software & hardware
Project Scope of Services Project Planning and Definition: 1. Facilitation of multi-stakeholder participation program – apply
Lean principles 2. Condition and needs assessment (physical, operational, security
and IT) 3. Program definition and criteria as basis for project development 4. Site assessment and selection 5. Phased implementation planning 6. Technology and communications:
a. documentation of requirements and determination of solutions; b. integration of and with existing systems; c. PSIM configuration and implementation; d. implementation of primary PSAP technology and equipment.
Project Scope of Services Project Implementation: 1. Design and engineering:
a. schematic design, preliminary design, final design, and construction documents for phased construction and phased rollout;
b. develop and manage BIM Model and management of BIMxP; c. apply Lean principles; d. prepare energy models; e. prepare engineering cost estimates.
2. Preparation of construction documents for public bid under MGL Chapter 149 or 149A
3. Construction phase services and resident inspection 4. Manage startup and commissioning of the facility and systems,
and closeout of the construction contract
Key Expertise • Multi-stakeholder process facilitation • Project planning – needs assessment – project definition –
program – site - cost – implementation strategy - - - - - - - - • Transportation security • Joint Operation Center and Common Operational Picture • Information Technology and communications and security
The Right Team for Massport • Experience leading complex projects from needs assessment
through closeout • Team leader • Strong team approach • Breadth of expertise • Well grounded in technology • Sights set on a project that can be implemented
Provide a plan for how your team will manage this project through the phases of work outlined.