FAUNTLEROY BOULEVARD PROJECT
FAUNTLEROY BOULEVARD PROJECT
Meeting overviewWelcome!
Open house from 5:00 7:00 PM
View display boards
Meet with project staff
Provide your thoughts and feedback
8/11/2019 Boards for Fauntleroy Boulevard open house
2/19
FAUNTLEROY BOULEVARD PROJECT
SDOTs mission, vision & valuesMission: Deliver a safe andreliable transportation systemthat enhances Seattlesenvironment and economic vitality
Vision: A vibrant Seattle withconnected people, places, andproducts.
Focus onthe basics
Keep it safe
Build healthycommunities
Support athriving
economy
Provide greatservice
8/11/2019 Boards for Fauntleroy Boulevard open house
3/19
FAUNTLEROY BOULEVARD PROJECT
Project goals Improve mobility and safety for all
users, by balancing the needs of
pedestrians, bike riders, and driversand reducing potential conflictsbetween vehicles and other modes
Enhance Fauntleroy Way SWs roleas a key entrance to West Seattle
Respond to community needsidentified in the West Seattle TrianglePlan and the Bicycle Master Plan
8/11/2019 Boards for Fauntleroy Boulevard open house
4/19
FAUNTLEROY BOULEVARD PROJECT
Project area Corridor characteristics: Significant distance between marked
pedestrian crossings No dedicated space for bikes Poorly defined sidewalk Major arterial Minimal landscaping Major freight corridor Area traffic counts*
Vehicles: 21,000-29,000 per day
Bicycles: 264-545 per day Pedestrians: 250 (at 37th Ave. SW andFauntleroy Way SW) - 800 (at SW AlaskaSt. and Fauntleroy Way SW) per day
*Data collected June 2012
F a u n
t l e r o
y W a
y S W
W e s t
S e a t
t l e Bridge
SW Alaska St
3 5 t h A v e
S W
S W
A v a l o
n W a y
West SeattleGolf Course
SW Dakota St
SW Manning St
C al i f or ni aA v e
S W West SeattleStadium
N
8/11/2019 Boards for Fauntleroy Boulevard open house
5/19
FAUNTLEROY BOULEVARD PROJECT
Project elements Pedestrian amenities, such as:Lighting
Landscaping
Additional crosswalks
Protected bicycle facilities on Fauntleroy Way SWbetween SW Alaska Street and Avalon Way SW
Landscaped center median island
Enhancing gateway to West Seattle and theJunction neighborhood
Maintaining freight mobility along the corridor
Sustainability features: Energy-efficient LED streetlights Green Stormwater Infrastructure (e.g., rain gardens) Increase landscape cover
Use of sustainable materials (e.g., warm-mix asphalt
8/11/2019 Boards for Fauntleroy Boulevard open house
6/19
FAUNTLEROY BOULEVARD PROJECT
How did this project come about?The Fauntleroy Boulevard Project builds on previous planning work conducted by the community:
1999: West Seattle Junction Hub Urban Village
Neighborhood Plan identified streetscape improvements
2008-2010: Formation of the West Seattle Triangle
Advisory Group2011: Introduction of Fauntleroy Way SWBoulevard concept
2012:
Public decision on conceptual alternatives West Seattle Triangle Plan, calling for development of
Fauntleroy Way as a landscaped boulevard formallyadopted by SDOT and the City
2013: Fauntleroy Boulevard alternatives presented toCity Council
2014: Bicycle Master Plan designated Fauntleroy WaySW for a protected bicycle facilityProposed recommendations from the West Seattle Triangle Plan (adopted 2012)
N
8/11/2019 Boards for Fauntleroy Boulevard open house
7/19
FAUNTLEROY BOULEVARD PROJECT
Funding and scheduleThe project is currently funded through 60% design and SDOT is working to securefunding for construction.
ConstructioFinal designcompleted
Public openhouse
60% designmilestone
Meetings with propertyowners & stakeholders;30% design milestone
90% designmilestone
FALL 2014 LATE 2014 EARLY 2015 SPRING 2015SUMMER 2014
P e n d i n g F u
n d i n g
Timing TBDPending Fundi
8/11/2019 Boards for Fauntleroy Boulevard open house
8/19
FAUNTLEROY BOULEVARD PROJECT
Overview of 30% design Whats the design process?90%
Early 201530%Today
60%Late 2014
SW ALASKA ST
SW ALASKA ST
39TH AVE SW
LA FITNESS(IN DEVELOPMENT) TRADER JOES
SHELL
FRANCISCANMEDICAL CLINIC
WHOLE FOODS(IN DEVELOPMENT)
BRIGHT HORIZONS
WEST SEATTLECLEANERS
FAUNTLEROYCHIROPRACTRIC
WARDROBECLEANERS
WEST SEATTLEFAMILY YMCA
THE WAXBAR
CHOI SHOEREPAIR BA
(IN D
MIDAS SEATTLE
38TH AVE SW
38TH AVE SW
SW OREGON ST
SW OREGON ST
37TH AVE
37TH AVE SW
FAUNTLEROY WAY SW
FAUNTLEROY WAY SW
O N L Y
O N L Y
O N
L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y O K
O N L Y
O N L Y
New crosswalk
To Fire Station
8/11/2019 Boards for Fauntleroy Boulevard open house
9/19
FAUNTLEROY BOULEVARD PROJECT
Segment 1 What do you think?Write your commentson a sticky note and
post on the map.
SW Alaska Street to 38th Avenue SW
SW ALASKA ST
SW ALASKA ST
39TH AVE SW
LA FITNESS(IN DEVELOPMENT) TRADER JOES
SHELL
FRANCISCANMEDICAL CLINIC
WHOLE FOODS(IN DEVELOPMENT)
BRIGHT HORIZONS
WEST SEATTLECLEANERS
FAUNTLEROYCHIROPRACTRIC
38TH AVE SW
38TH AVE SW
FAUNTLEROY WAY SW
FAUNTLEROY WAY SW
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
O N L Y
New crosswalk
To Fire Station
PLANTING STRIP/MEDIAN
BIKE FACILITY
SIDEWALK
8/11/2019 Boards for Fauntleroy Boulevard open house
10/19
FAUNTLEROY BOULEVARD PROJECT
Segment 2 What do you think?Write your commentson a sticky note and
post on the map.
38th Avenue SW to 37th Avenue SW
WARDROBECLEANERS
WEST SEATTLEFAMILY YMCA
THE WAXBAR CHOI SHOEREPAIR RUDY'SBARBERSHOP(IN DEVELOPMENT)
ELLIOTT TIREAND SERVICEMIDAS SEATTLE
SW OREGON ST
SW OREGON ST
37TH AVE SW
37TH AVE SW
O N L Y O K
PLANTING STRIP/MEDIAN
BIKE FACILITY
SIDEWALK
8/11/2019 Boards for Fauntleroy Boulevard open house
11/19
FAUNTLEROY BOULEVARD PROJECT
Segment 3 What do you think?Write your commentson a sticky note and
post on the map.
37th Avenue SW to 35th Avenue SW
ALKI LUMBER& HARDWARE
ALKI LUMBER& HARDWARE
STARBUCKS
BUDGETBLINDS
SEATTLE INTEGRATEDMARTIAL ARTS
ZEBRA PRINTAND COPY
SMILES BY BOND
SEATTLE SUN TAN
ZAW
TACO TIME
AIKIDO OFWEST SEATTLE
HOUSE OFKLEEN JONES BARBEQUE
36TH AVE SW
SW AVALON WAY
35TH AVE SW
35TH AVE SW 3 6 T
H A V E
S W
FAUNTLEROY WAY SW
S W G E N E
S E E S T
O N L Y
O N L Y
Connects to futureneighborhood greenwayon 36th Ave SW
PLANTING STRIP/MEDIAN
BIKE FACILITY
SIDEWALK
8/11/2019 Boards for Fauntleroy Boulevard open house
12/19
FAUNTLEROY BOULEVARD PROJECT
Preliminary cross section
8/11/2019 Boards for Fauntleroy Boulevard open house
13/19
FAUNTLEROY BOULEVARD PROJECT
Examples of protected bicycle facilities
Seattle Childrens Hospital, Laurelhurst
Linden Avenue, North Seattle
Broadway, Capitol Hill
Alki Avenue, West Seattle
8/11/2019 Boards for Fauntleroy Boulevard open house
14/19
FAUNTLEROY BOULEVARD PROJECT
What might the new landscaping look like?
8/11/2019 Boards for Fauntleroy Boulevard open house
15/19
FAUNTLEROY BOULEVARD PROJECT
What might pedestrian features look like?
8/11/2019 Boards for Fauntleroy Boulevard open house
16/19
FAUNTLEROY BOULEVARD PROJECT
Community feedback:What weve heard so far Providing access for
area businesses is critical Concerns about increased traffic
congestion in the corridor
Landscaping should be easy to maintainand attractive
Bicycle facility should connect to a networkof bike routes
Current corridor is difficult to navigateas a pedestrian
Project should improve the appearance of thecorridor to welcome people to West Seattle
8/11/2019 Boards for Fauntleroy Boulevard open house
17/19
FAUNTLEROY BOULEVARD PROJECT
How will this project connect to otherbike facilities?
F a u n
t l e r o
y W a
y S W
We
st Seattle B rid
ge
SW Alaska St
3 5 t h A v e
S W
4 2 n d A v e
S W
2 6 t h A v e
S W
S W A v a l o
n W a y D el r i d
g e W a y S W
W M a r g i n a l W
a y S W
West SeattleGolf Course West
DuwamishGreenbelt
SW Dakota St
SW Hinds St
SW Charlestown St
C al i f or ni aA v e
S W
West SeattleStadium
Off street bicycle p
Cycle track(protected bicycle lane
Neighborhood gree(residential streets, desfor safety of pedestrianbike riders)
In street, minorseparation(traditional bike lane)
Shared street(marked by "sharrows"
Project areaExisting Future
Legend
Existing and proposedbike facilities from the2014 Bicycle Master Plan
N
8/11/2019 Boards for Fauntleroy Boulevard open house
18/19
FAUNTLEROY BOULEVARD PROJECT
Whats next in the design process? Review public comments
60% design in late fall 2014
Continue meeting with area businesses,property owners and community groups
Note: Project is not funded forconstruction; SDOT is working toidentify additional funding
8/11/2019 Boards for Fauntleroy Boulevard open house
19/19
FAUNTLEROY BOULEVARD PROJECT
How you can provide feedbackPlease submit comments in the boxes provided
or on our online form.
Email us at fauntleroyblvd@seattle.gov
Recommended