BIM Contract Conditions - HKIS · BIM Contract Conditions Conditions of Contract for Building...

Preview:

Citation preview

BIM Contract ConditionsConditions of Contract for Building Information Modelling (BIM)

The Hong Kong Institute of Surveyors

First Edition April 2020

Cover_purple_r1.indd 1 20/4/2020 上午11:12

The HKIS BIM Contract Conditions

at the Hong Kong Institute of Surveyors’ website.

The HKIS BIM Contract ConditionsBIM Contract Conditions

The HKIS BIM Contract Conditions

1

BIM Contract Conditions

The HKIS BIM Contract Conditions

’s Information Requirements

2

The HKIS BIM Contract Conditions

all relieve the Project Participant’s

requires the Contractor to design based on the Design Consultant’s design intent or other requirements, the Contractor’s participation in BIM shall not constitute

3

The HKIS BIM Contract Conditions

suppliers according to the Design Consultant’s design intent drawing or

The standard of care regarding the Project Participant’s obligations under Clause 4.1

4

The HKIS BIM Contract Conditions

Without prejudice to the Project Participant’s obligations under Appendix 2, the

Project Participant’s BIM Team

contractor with suitable expertise for the execution of BIM tasks. The Employer’s

experience of the BIM team leader and members for the Employer’s approval within

experience of the BIM Manager for the Employer’s approval within 14 calendar days

5

The HKIS BIM Contract Conditions

intangible properties in the BIM Manager’s possession, custody or control in relation

project participants’ responsibility in complying with t

6

The HKIS BIM Contract Conditions

participant’s Model.

participant’s Model.

Project Participant’s and the Employer’s Intellectual Property Rights in any

7

The HKIS BIM Contract Conditions

licence on identical terms to Project Participant’s sub

participant’s Model, the Project Participant, while owning the Intellectual Property

limited to retaining a copy of the Project Participant’s own and related Models solely

unauthorised modification to, or use of, other project participant’s Model.

8

The HKIS BIM Contract Conditions

9

The HKIS BIM Contract Conditions

10

BIM Contract Conditions

10

The HKIS BIM Contract Conditions

11

BIM Contract Conditions

11

The HKIS BIM Contract Conditions

the Project Participant’s BIM team leader

12

The HKIS BIM Contract Conditions

13

– Employer’s Information Requirements

Training for the specified Employer’s application(s) to be used on the Project

o

The HKIS BIM Contract Conditions

o

o

Aggregated models for the Employer and Project Participant’s reviews

14

The HKIS BIM Contract Conditions

15

The HKIS BIM Contract Conditions

16

The HKIS BIM Contract Conditions

17

BIM Contract Conditions

Since all project participants may utilise other’s BIM models and digital data under a

18

The “model delivery table” defines the

contractor based on the design consultant’s design intent and/or performance specification.

The “model delivery table” defines the

contractor based on the design consultant’s design intent and/or performance specification.

The HKIS BIM Contract Conditions

18

term “Project Participant” is used to unify the party’s names under different agreements. As

ways of working if they also access to and utilise other project participants’ BIM models and

Appendix 1. This follows the traditional arrangement that “special conditions of contract” will prevail over “general conditions of contract”. Thus, care must be taken to ensure that

The HKIS BIM Contract Conditions

19

The “model delivery table” defines the

contractor based on the design consultant’s design intent and/or performance specification.

The HKIS BIM Contract Conditions

20

cipant’s liability any data

design consultant or contractor should undertake the BIM manager’s role.

The HKIS BIM Contract Conditions

21

sultant or contractor’s duties stipulated under the

The BIM manager’s duties may vary from project to

however observed that there are myriad of professional liability and contractor’s all risk

The BIM manager’s role and the hosting and management of the centralised electronic

cipant’s liability any data

design consultant or contractor should undertake the BIM manager’s role.

The HKIS BIM Contract Conditions

22

sultant or contractor’s duties stipulated under the

The BIM manager’s duties may vary from project to

however observed that there are myriad of professional liability and contractor’s all risk

The BIM manager’s role and the hosting and management of the centralised electronic

– Employer’s Information RequirementsThe Employer’s Information Requirements define how the BIM models and digital data must

ures and processes. The exact nature of the employer’s information requirements

BIM Contract ConditionsConditions of Contract for Building Information Modelling (BIM)

The Hong Kong Institute of Surveyors

First Edition April 2020

Cover_purple_r1.indd 1 20/4/2020 上午11:12

Recommended