CALCAL WADSWORTHWADSWORTH CONSTRUCTIONCONSTRUCTION

Escalante Grand Staircase National Escalante Grand Staircase National MonumentMonument

Big Water Visitor Center ProjectBig Water Visitor Center Project September 24September 24thth 2001 thru May 24 2001 thru May 24thth

20022002

Project Manager: Kevin AbernathyProject Manager: Kevin Abernathy Superintendent: Raymond RankinSuperintendent: Raymond Rankin

The key to any successful project is to start right and stay right.

Initial project excavations.

Footings for the walkways and courtyard walls.

Showing the curved, unconventional nature of the building.

Surveyed marks on top of the footings gave the center of stem wall. That combined with radius points allowed the

precise location of the building foundation walls.

All the cooling ducts and most of the electrical work is located under the building.

There are no square corners and very few straight lines.

Crew shots

Curved amphitheater under construction.

Placement of the forms and adequate bracing provided for precision and accuracy in the amphitheater wall

construction.

The building foundation is complete. The care and accuracy taken in the stem wall placement makes the block

masons job easier.

Staging block for the masons to begin. The mechanical is underground as well as the electrical and plumbing.

Maintaining plumb and level going up is the only way to lay block on a radius wall.

There are a few short, straight lines, but not many ~ most are

decorative.

Project aerial views

Local Glen Canyon Construction team.

CMU construction topped out.

Amphitheater seating

Structural steelwork being completed

Completion of the building structure and courtyard walls indicates the complexity of the building design.

This wall was a change order.

Stampe-crete in progress.

Quality performance from the selected roofing contractor .

Views indicating high quality of the stone masonry.

Exterior Insulation Finish System, steps 1-4

More views illustrating quality of the stone masonry work

Aluminum storefront and clearstory window installation.

Drywall underway.

Interior painting underway

Carpet and tile installation in progress.

AB being laid in the parking lot.

Because the flow of water is towards the building, catch basins and daylight drains had to be placed in strategic locations throughout the courtyard and around the building for flood control. Precise

survey was required.

Roughly 70% of the floors inside the building are sealed

concrete with radiant floor heating.

Millwork in progress.

Current photos ~ Grand Staircase Escalante National Monument Visitor Center, Big Water, Utah, 2008

Entrance from Highway 89 to Visitors Center

Exterior views including solar panels on south side

Main entrance and courtyard

Main walkway entrance to Main walkway entrance to courtyard and amphitheatercourtyard and amphitheater

Foyer and information desk

Main dinosaur and fossil exhibit areaMain dinosaur and fossil exhibit area

Prehistoric mural by Larry Felder:Dinosaur sculpture by David

Rankin

Visitor Center book store ~ lecture room to left