PROJECT STATUS:

Grading and pad elevation work completed

Building location and layout has been surveyed

Footings are being excavated

Main electrical conduit into the building is being installed

Survey of Building – Identifying building location and gridlines

First Bucket of dirt removal for the IVC First Building at ATEP

Excavation of Building Footings

Upcoming Activities: Complete excavation of all footings

Start underground plumbing system

Set anchor bolts

Conduits for main Electrical lines into building