Bhanes Profile 13.10bhanessteel.com/profile.pdf · Bhanes Steel initially started with two...

Preview:

Citation preview

B H A N E S S T E E L T h e P e r f e c t C o n n e c t o r s

w w w . b h a n e s s t e e l . c o m P .O. Box : 215798, Dubai, U.A.E

Tel: +971 4 268 2208 Fax: +971 4 268 2207 Email: info@bhanessteel.com

PROFILE About Us: Bhanes Steel initially started with two experienced Xsteel modelers jointly working with one of the engineering & fabrication company two years ago. Today Bhanes Steel having well trained and experienced Xsteel modelers with Tekla Licenses. Bhanes Steel, have excellent experience as an individual detailing company serving to support the Engineering & Fabrication companies in Oil & Gas, Power, Petrochemical, Process Industries, Cement Plants and also Commercial Projects. Our Engineering solutions contribute to better business outcome for clients. With our dedicated staff of Engineers & Designers we have the capability of handling projects of all sizes. The services afford by us are Good in the industry in the field of any kind of Structural Engineering

Infra Structures: Office Space: 1000 Sq.m 22 High configured Work Stations with 1Gbps Network connections 24 hrs 512 kbps Internet Unlimited FTP Server 5000 E-mail Id’s Software: Structures - Xsteel & Auto Cad Capability of Detailing in Xsteel: 3000 - 3500 Tons per month* Our Strength: 1) 1 Structural Engineer 2) 26 Xsteel Operator 3) 2 Cad Draughtsmen * We can mobilise more licenses and Xsteel modelers depends upon the project size/quantity.

B H A N E S S T E E L T h e P e r f e c t C o n n e c t o r s

w w w . b h a n e s s t e e l . c o m P .O. Box : 215798, Dubai, U.A.E

Tel: +971 4 268 2208 Fax: +971 4 268 2207 Email: info@bhanessteel.com

Staff Experience: A) Design: 1. Designer 1 - 2 years in Structural steel Design and Detailing B) Detailing: Name X Steel Experience Total Experience 1. Detailer - 1 - 5 years - 9 years 2. Detailer - 2 - 3 years - 8 years 3. Detailer - 3 - 4 years - 6 years 4. Detailer - 4 - 31/2 years - 6 years 5. Detailer - 5 - 2 years - 8 years 6. Detailer - 6 - 2 years - 5 years 7. Detailer - 7 - 1 year - 3 years 8. Detailer - 8 - 2 years - 4 years 9. Detailer - 9 - 11/2 years - 3 years 10. Detailer - 10 - 11/2 years - 3 years 11. Detailer - 11 – 26 - 3 years -6 years Projects Handled: 1. Chiyoda - 1800 Tons - Oil and gas - Abu Dhabi 2. IHI - 1500 Tons - Qassim Cement Factory 3. Petrofac - 650 Tons - Rag and Flare Mitigation Integrated Project 4. Alstom - 430 Tons - FCC Seawater Scrubber Project 5. Emirates Engg Center - 800 Tons - Emirates Hanger - Misc. Structures 7. Sidem - 250 Tons - Layyah Power Station 8. Kirchner Italia - 400 Tons - Ras Laffan QP 9. Bechtel - 3400 Tons - Sohar Smelter Project Projects Recently Completed:

1. Qurayyah Seawater Plant – Snamprogetti -6000Tons - Completed 2. Saudi Arabian Oil Company – Khurais -4800Tons - Completed 3. Chiyoda-Technip JV (CTJV) Qatar RasGas – Train 6 & 7 -6500Tons - Completed 4. Olefins plant – Yanbu - Technip Italy -1800Tons - Completed 5. Yemengas LNG – Technip Italy -1800Tons - Completed 6. FPSO top side Modules – Saipem -2500Tons - Completed 7. Aweer Gas Turbine power Station (Station H – Phase III) – Fichtner Gmbh -4000Tons - Completed 8. Rabigh Expansion – Technip Italy - 800Tons - Under Progess (Misc. Steel Detailing) 9. Dubai Metro – Concourse Structure -2000 tons - Under Progress