Salton Sea KGRA

by Dr. Dan Hoyer, PEVeizades & Associates, Inc.

1

Monitoring

Degradation

of Materials

Outline

VEIZADES & ASSOCIATES, INC.2

Challenges in

High Temperature

Corrosion

Scaling Resources

Materials of

Construction

SPE/GRC Workshop March 21-27, 2017

Process

Indicators

Salton Sea Geothermal Fluids

Hot (>500°F)

High chloride content (>10%)

High total dissolved solids (>25%) with high scaling tendency

Noncondensible gases (ammonia, carbon dioxide, hydrogen sulfide)

Corrosion rates:

– can exceed 300 mils per year for carbon steel

–much higher corrosion rates if aerated or acidified brine

3

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

Process Flow Diagram (PFD)

4VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

Material of construction

5

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

Material Location

Titanium Grade 29 Production Wells

Inconel 625 (58% Ni, 23% Cr), Inconel 825

Vessel

2507 Duplex Stainless Steel(25% Cr, 7% Ni, 4% Mo), 2205

Piping

2507 Duplex Stainless Steel Injection Wells

316L Stainless Steel Condensate/NCG

Cement Lined Injection line

Carbon Steel Non-aeratedbrine tank

Price

Expected

Service Life

Materials of Construction

6VEIZADES & ASSOCIATES, INC.

SPE/GRC Workshop March 21-27, 2017

Monitoring is essential for safe and sustained operation

7

General corrosion/erosion Ultrasonic Thickness Testing (UT)

Pitting or “bear claw” corrosion Visual, B scan or C scan UT

Stress Corrosion Cracking (SCC) Visual, Dye Pen, Magnetic Particle Inspection, Shear wave UT

Degradation Mechanism Inspection Technique

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

Process Indicators

VEIZADES & ASSOCIATES, INC.8

Process Indicator Potential Consequence

Chemical monitoring:-increase in chloride/silica in steam-decrease of pH in condensate

Higher potential for stress corrosion cracking (SCC) and corrosion

Pressure change vs. time Scaling or erosion

Log book of upset conditions Target inspection

SPE/GRC Workshop March 21-27, 2017

Degradation type, knowledge of service and risk of failure drives inspection

VEIZADES & ASSOCIATES, INC.9

SPE/GRC Workshop March 21-27, 2017

Major Overhaul Inspection

– Visual, pictures and thickness measurements at all process changes

– Additional inspection if there is a potential to crack

More Frequent Inspections if:

– New plant; one year after start-up

– Poor understanding of degradation mechanism

– Process parameters outside design

Sustained Inspection

– Baseline prior to start-up

– Same location for each major overhaul inspection

– Evaluate corrosion rate (mils per year) changes over life of project

Corrosion

Accelerated corrosion of weld zones in alloys

10

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

Example of selected inspection

locations and frequency

Turbulence

11

increased turbulence/velocitym

ixed

fluid

s

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

12

VEIZADES & ASSOCIATES, INC.

John Featherstone-

Inventor of

Crystallizer/Clarifier and

Dr.Dan’s Mentor

Scale does not

adhere to

alloys. Easy

to remove and

clean.

SPE/GRC Workshop March 21-27, 2017

13

Well Casing

Pressure Test

Video Camera

Multiple Finger Caliper

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

14

Massive pitting in

HP steam line

from wash water

impurities

Weld failure on

steam vessel

internals

VEIZADES & ASSOCIATES, INC.SPE/GRC Workshop March 21-27, 2017

15

VEIZADES & ASSOCIATES, INC.

UT Inspection Matrix – Carbon Steel

Evidence of changes in physical and

chemical depositional environment

SPE/GRC Workshop March 21-27, 2017

Summary

Materials of construction can mitigate impacts

Monitoring is critical to sustained operation

Anticipated degradation process and risk of failure directs

frequency and inspection technique

VEIZADES & ASSOCIATES, INC.16

Physical

Chemical~

Erosion

Corrosion

SPE/GRC Workshop March 21-27, 2017