Bentley Substation V8i Overview
Citation preview
© 2009 Bentley Systems, Incorporated
Bentley Substation V8i Overview
© 2009 Bentley Systems, Incorporated
Unprecedented Challenges Compel Adaptation
The 21ST Century Utility
InfrastructureCost Reduction
Population Growth
Aging Infrastructure
OperationalIneffectiveness
Smart Grid Initiatives Distributed,
Renewable Power
Generation
Micro-generation
and Storage
CarbonEmissions
2 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Bentley Innovation Areas for the 21st
Century Utility
Intelligent infrastructure for re-engineering the 21st
century utility
Transmission and distributiondesign and
management
Power plant engineering and
design
Intelligent substations
Engineering content
managementand team
collaboration
Nuclear configuration management
3 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Intelligent Infrastructure Requires an Intelligent Information Model
• Faster time to market
• Optimized project delivery
• Better performing infrastructure across the lifecycle
4 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Innovation, Flexibility and Intelligent New Ways of Working Are RequiredMulti-disciplinary Workflows with Data Interoperability
5 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Utilities Leveraging Bentley TechnologyPower Generation Electric & Gas Utilities /
Multi-Utilities Water and Wastewater
• American Electric Power • Bonneville Power Administration • CEZ, a.s. • Dominion Virginia Power • E.ON AG • EDF Pole Industrie• Electrabel S.A. • EnBW AG • ESKOM HOLDINGS • Exelon Corporation • FirstEnergy Corporation • Florida Power & Light Co • Iberdrola S.A • Korea Hydro & Nuclear Power Co Ltd • Progress Energy Service Company LLC • RWE AG • Southern Company Services Inc • Taiwan Power Company • Tokyo Electric Power • Vattenfall Europe AG
• Ameren • American Electric Power • Con Edison • Constellation Energy • Consumers Energy • CPS Energy • DTE Energy • Duke Energy • E.ON AG • Electrabel S.A. • ENERGEX • Eskom Holdings • Huntsville Utilities • Iberdrola S.A • RWE AG • Snam Rete Gas SpA• TXU Energy • Vattenfall Europe AG • Western Power • Xcel Energy
• American Water• Anne Arundel County• Los Angeles County Sanitation District• East Bay Municipal Utility District• Empresas Publicas de Medellín ESP• Stadtentwässerung Stuttgart• Melbourne Water Corporation• Metropolitan Water District of
Southern California• MidCoast Water• National Water Commission (Jamaica)• Power and Water Corporation
(Australia)• Sabesp• Saur• Societe Wallonne Des Eaux• Thames Water• United Utilities• United Water• Veolia Water• Watercare Services Limited• Waternet
66 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
What Are Substations? Where Are They in the Grid?
Switchyard
High VoltageTransmission LinesTransmission
Substation
PowerPlant
Distribution Substation
Distribution Network
End User
7 | WWW.BENTLEY.COM
Transmission Lines
© 2009 Bentley Systems, Incorporated
Substation Business Drivers
Smart grid
Aging substation infrastructure
Alternative energy sources
Strong demand in developing economies
WindWave
Solar
8 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Why Are Engineering Efficiency and Intelligent Design Important?
• 10% of a typical utility’s revenues is spent on designing, building, operating and maintaining substations
• Even small changes in engineering efficiency can lead to substantial savings
PECO $45M New electric transmission substation (U.S., 2009)
SP PowerSystems $16M Substation re-build ( Scotland, 2009-12)
Consolidated Edison Co. $347MNew substation installations and equipment (New York, 2009)
Kuwait $400M Three new substations
Qatar €500M 14 gas-insulated substations
Powerlink A$15M Substation upgrade (Australia, 2009)
9 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Plain CAD for Substation DesignNo connection between design elements
BOM and Other Reports
Physical Design
Electrical Design
1010 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Plain CAD for Substation Design
Designers forced to do extra work:
– Tedious CAD drawing steps– Manual cross referencing of
schematic symbols– Manual take-off of cable schedules– Manual take-off of bills of material– Manual take-off of point-to-point
wire lists– Manual error checking
and correction– Page management– Data re-entry
1111 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Lack of 3D Substation Model
• 2D views of the physical design are difficult to draft
• 2D views are difficult to interpret– Interference errors– Difficulty in
getting approvals
12 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
= Poor use of valuable resources
Other Issues Beyond the Designer’s CAD Environment
1313 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
What Is Needed?
A design tool specifically for substations:
– Integrates physical design with electrical design
– Uses intelligent information models
– Facilitates collaborative workflows
– Provides 100% accurate, complete documentation automatically
14 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Integrated electrical and physical design for intelligent substation infrastructure
Featuring:• Intelligent information models
• 3D physical design
• Electrical design
• Protection and control schematics
• Automatic report generation
• Grounding grid design
• Lightning protection
• Panel layouts
• Integration with enterprise engineering content management system
Introducing Bentley® Substation™ V8i – Intelligent Substation Design
15 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
The Substation Database Enables an Intelligent Substation Model
Design and
Estimate
Site Work
Approvals
Materials Fabrication
Upgrades
EnergizeO&M
As-Built Updates
Greenfield Brownfield
Planning
Construction
2D Electrical
Design
3D Physical Design
SubstationDatabase
1616 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Content Management Through the ProjectWise Collaboration System
• Control and track changes
• Coordinate work at multiple locations
• Optimize project workflow
17 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Results
• Fewer design hours and associated cost
Projected Savings
Design Time – Save 30%BOM Prep Time – Save 60%
18 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Results
• Fewer design hours and associated cost
• Quicker design cycles getting projects online sooner
19 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Results
• Fewer design hours and associated cost
• Quicker design cycles getting projects online sooner
• Faster approvals
20 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
Results
• Fewer design hours and associated cost
• Quicker design cycles getting projects online sooner
• Faster approvals
• Fewer change orders
21 | WWW.BENTLEY.COM
© 2009 Bentley Systems, Incorporated
SummaryBentley Substation V8i is:
• Intelligent substation design
• Software specifically for substation design
• Intelligent information models
• Integrated physical design, electrical design, report generation
• Engineering content management through ProjectWise
A productivity tool that can cut substation design time by at least 30%
22 | WWW.BENTLEY.COM