Befimmo, shiftmaker - editionsetseminaires.be · Befimmo participating in the public tender of...

Preview:

Citation preview

Befimmo,

shiftmaker

Presentation Éditions & Séminaires9 octobre 2019

The Belgian specialist in work environments

2

Agile approach in a fast moving environment

3

Proactivemanagement of quality workenvironments withcity centre focus in a Belux network

Offering flexibility, community & services

Future proofdevelopments tocreate value in a low yieldingenvironment

Emergence of new technologies and digital revolution

Talent attraction

Work-life balanceand well-being

Metropolisation

Mobility

Environmental concerns

A dynamic office player

Coworking solution to evolving needs

6

« Office tenants seeflexible coworking concepts no longer as just a way to manage costs, but also as a way to innovate, worktogether with otherentrepreneurs and to attract talent. »

CBRE Netherlands – Rudolf de Boer – Managing Director

Silversquare, Belgian pioneer in coworking

P 8

Louise area

Brussels CBD

Luxembourg city

G-D of Luxembourg

Louise area

Brussels CBD

University area

Brussels decentralized

Leopold area

Brussels CBD

+300Events/year

+1300Members

Companies

Ambitious pipeline to expand the network

P 9

Brussels CBD Brussels CBD Liège Brussels CBD Brussels CBD Brussels CBDBrussels periphery

OpeningSilversquare

Silversquare occupancy: 43%

Silversquare occupancy: 83%

Silversquare occupancy: >90%

Opening food« Les Compagnons »

10

Triomphe, a success story

Brussels North area, a lot of assets

12

Brussels North area, Up4North

13

Up4North was created in 2016 on the initiative of

AG Real Estate & BefimmoWin

Residents and

workers

WinBrussels Region

WinReal-estate owners

Up4North, temporary occupation WTC

14

ZIN, a unique on-site cocreation process

P 15

ZIN | A smooth process

P 16

31.12.2016 31.12.2017 31.12.2018

Lease WTC 2

Befimmo participatingin the public tender of

the “Vlaamse Overheid”October 2017

Permit introduction

July 2018

Temporary occupation WTC 1 andco-creation process

Permit expected2020

Call for projects in order to form a team of

ArchitectsSeptember 2017

70,000 m² preletto the “Vlaamse

Overheid”&

Start of phase 1 of worksQ1 2019

End of lease WTC 231 December 2018

Delivery of ZIN2023

Start of the 18 yearslease with the

“Vlaamse Overheid”

International architecture consultation

December 2016

Founding of Up4NorthOctober 2016

A true multifunctional project

70 000 m² of offices

2023Completion

240 hotel rooms

127 appartments

ZIN, making city

18

ZIN, making city

19

ZIN, a new dimension of multifunctionality

20

ZIN, a new dimension of multifunctionality

21

Office floorAppartments

Hotel

ZIN, spacious office floors

P 22

Office floor of >4,000 m²70,000 m² spread over 14 floors

ZIN, spacious office floors with natural light

23

ZIN, a prototype for circular building

P 27

ZIN, building as material bank

P 28

ZIN, towards real energy neutrality

P 29

30

P 31

08.10.19 / Titre de la présentation (menu "Insertion / En-tête et pied de page") P 32

P 33

P 34

P 35

P 36

08.10.19 / Titre de la présentation (menu "Insertion / En-tête et pied de page") P 37

ZIN | Movie “Living building”

Thank you!

Pictures for illustrative purposes. Permit application in progress.

Recommended