Bangchak for - JCCP...Bangchak for Technological Strategy and Deployment Mr. Chalermchai Udomranu,...

Preview:

Citation preview

Bangchak for

Technological Strategy and Deployment

Mr. Chalermchai Udomranu,

Executive Vice President, Refinery Manufacturing Business

Bangchak Petroleum PLC

Japan Cooperation Center, Petroleum (JCCP)

28 Jan 2016

2

Agenda

1. Introduction to Bangchak Petroleum PLC

2. Bangchak Technological Strategy

3. Bangchak Technological Deployment

3

Agenda

1. Introduction to Bangchak Petroleum PLC

2. Bangchak Technological Strategy

3. Bangchak Technological Deployment

1984 Founded

1994 IPO

2009 Complex Refinery

2011 Solar Business

Biodiesel Business

2009

Ethanol Business

2011

E&P Business

2014

1991 First Standard Service Station

1990

First Coop Service Station 1991

30 Years of Bangchak Petroleum PLC

4

Refinery Business Marketing Business Renewable Energy

Capacity: 120 KBD

No. of service stations: 1,072*

*As of Dec 2015

The Bangchak Petroleum PLC (“BCP”)

Ministry of Finance, 9.98%

Social Security Office 14.31 %

Public 60.11 %

Biodiesel Business

Ethanol Business

Capacity: 400,000 litre/day (BCP: 21.28% shareholding)

Capacity: 360,000 litre/day (BCP: 70% shareholding)

No. of solar plants: 8 Total Capacity: 118 MW

Solar Business

Company Overview / Business Model

5

Vayupak Fund 15.60 %

6

Agenda

1. Introduction to Bangchak Petroleum PLC

2. Bangchak Technological Strategy

3. Bangchak Technological Deployment

Process Unit Unplanned Shutdown

Number of Shutdown

0

2

4

6

8

10

12

20102011

20122013

20142015

7

5 5

11

5

0

Year

7

Bangchak Strategy for Sustainability

- No Unplanned Shutdown - World Class Safety Management - Energy Intensity Index (EII) : 2nd Quartile

- No Complaint -Community Engagement : > 80%

EBITDA

Operational Excellence

Community Engagement

Sustainability in the City

by “To Be A Refinery Leader

in Safety and Environment”

8

Process Safety Management & Asset Integrity Management

9

Technological Management

PSM : Process Safety Management (14 Elements)

10

Technological Management

AIM : Asset Integrity Management

11

Technological Management

Hazardous and Operability (HAZOP) Study

Pressure Equipment Integrity Management

Technological Management

Reliability Centered Maintenance (RCM)

Safety Integrity Level (SIL)

Risk Based Inspection (RBI)

- To appropriate maintenance/spare part planning

- To hazardous identify and recommend to minimize operation risks and impacts

- To appropriate inspection planning of each equipment

- To improve an Integrity of Static Equipment& Piping of Refinery

- To reduce the risk of instrument failure

12

Example of Activities Implemented

18

Agenda

1. Introduction to Bangchak Petroleum PLC

2. Bangchak Technological Strategy

3. Bangchak Technological Deployment

o Everyone Goes Home Safely Everyday o Environment and Asset are Protected o Efficient and Reliable Operations

19

20

Lockout Tag out (LOTO)

Line Break (LB)

Field Risk Assessment (FRA)

Taskforce Leader

Hot Work Permit (HW)

Governance Member

21

22

Safety Journey “Flying Together” 23

The Outcome of Strategy

24

No Major Incident

No Unplanned Shutdown

Employee Engagement

Community Engagement

Market EBITDA : Actual > Target

02 335 4010 www.bangchak.co.th

chalermchai@bangchak.co.th