Appendix II: Additional Letter from Project for Hydroelectric … · 2020. 5. 27. · Appendix II:...

Preview:

Citation preview

“WE’RE LEAVING EVERYTHING BEHIND” 86

Appendix II: Additional Letter from Project for Hydroelectric Construction of Souapiti (Projet d'Aménagement Hydroélectrique de Souapiti, Souapiti Agency) to

Human Rights Watch, February 17, 2020

87 HUMAN RIGHTS WATCH| APRIL 2020

“WE’RE LEAVING EVERYTHING BEHIND” 88

89 HUMAN RIGHTS WATCH| APRIL 2020

Recommended