ANZSIC 2006 ANZSIC 2006 ImplementationImplementation
International Workshop on Implementation of ISIC and International Workshop on Implementation of ISIC and CPCCPC
Kunming, ChinaKunming, China
14 - 18 September 200914 - 18 September 2009
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
Last major change
Impact on ABS
ANZSIC 2006 Implementation Program (AIP)
Program Governance ModelProgram Governance ModelANZSIC06 ImplementationANZSIC06 Implementation
Corporate Investor
Statistics NZ Program Owner
Implementation Program Manager
Managers of specific implementation projects
Quality Advisers
Program Board
Implementation Coordination TeamRepresentatives of affected areas
ASAC and ESUG
ABSMM
ESSCC
Collection areas/Support areas and other projects relating to
ANZSIC06 Implementation
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
Preparatory phase develop broad strategies sign-off the processes develop new ANZSIC autocoder create production frame on both basis
Transition phase maintain 2 production frames for each collection
recode (reverse coding) from ANZSIC06 to ANZSIC 1993
Full implementation phase publish on new basis only
ImplementationImplementationStatistical StrategiesStatistical Strategies
annual collections produced 2 years ‘bridged’ data on the new basis
subannual collections used the parallel run strategy
irregular and benchmark economic collections - dual coded
non-register sourced collections - dual coded
Program management Transition plans
Communication plans
Outcome realisation plans
Risks management
Issues management
Financial management
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
Program management (continued) quarterly Board meeting six-monthly one-on-one meeting with affected areas annual workshop other meetings/workshops, as required
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
ImplementationImplementationBusiness Register Business Register
StrategiesStrategies
• Recode stock of business register to ANZSIC 2006
• Business As Usual (new registrations)
• Reverse coding
• Quality Assurance
ImplementationImplementationOutput StrategiesOutput Strategies
• Collections will:– Publish on ANZSIC 2006 basis only;
– Include a general note in the explanatory notes
– Include a technical note additional bridging/backcasting information or details if necessary;
– Include more information for users in their publication releases, one to two reference periods before the introduction of ANZSIC 2006 (subannual collections and national accounts only).
• ANZSIC 1993 data series
Inform and update users on progress during the life of the program
utilise all affected ABS areas to identify and engage with users
produce information papers, conduct information sessions and provide contact points for queries
ImplementationImplementationCommunication StrategiesCommunication Strategies
Release schedule of Release schedule of statisticsstatistics
A number of ABS collections had already been published on ANZSIC 2006.
The rest of the ABS collections will progressively migrate to ANZSIC 2006 this year.
Implementation Implementation Annual CollectionsAnnual Collections
produced 2 sets of data on new basis published 2004/05 and 2005/06 ref. years full survey redesign 2006/07 ref. year
sampling procedures: design on ANZSIC 1993 standard optimised allocation top-up sample to achieve constraints on both A93 and A06
Implementation Implementation Annual CollectionsAnnual Collections
measurement strategy: post-stratification
other considerations: consistent rigour in editing both for A93 and A06 understanding the impact or changes
Implementation Implementation Subannual CollectionsSubannual Collections
Use parallel run estimation
design two separate (but overlapping) samples (A93 and A06)
collect data and estimate separately from each sample
BackcastingBackcasting
Backcasting guideline Often an expensive and error
prone undertaking Decision to backcast requires
strong justification to do so
Not all ABS economic collections will backcast.
Key backcasting parameters
ABS developed a generalised backcasting facility
BackcastingBackcasting
Program evaluation report assess the appropriateness of
program outputs;
assess the effectiveness of the program management;
identify best practice in the program;
reflect on the things that went well;
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
Program evaluation report (continued) recommend ways on how to
improve the program implementation;
understand and document the major problems encountered;
recommend how the process could be contracted; and
identify exemplars of transition plans and key program/project documents.
ANZSIC 2006 Implementation ANZSIC 2006 Implementation StrategyStrategy
Questions?Questions?