Guidelines for ALMA Operations
• ALMA is a service observing facility, for which the scientific demand will be very high. The astronomer is not normally required to be present when his/her observations are executed.
• ALMA operational activities in Chile are limited to what is required to acquire, certify and archive the scientific data of the scientific teams proposing observations; this includes certain business functions and other activities requiring proximity to the array. For safety reasons, the number of ALMA staff working at the array site at 5000 meters elevation must be kept to an absolute minimum.
• The main interface between the user communities and ALMA is through the Regional Centers (ARCs), including proposal handling and support for data reduction and archival research.
• Maintenance, Repair and Development work on hardware and software is contracted to the Executives.
Baseline plan for the relation of Operations to Construction
From the ALMA Project Plan
• Hardware delivered will be integrated, verified, and commissioned subsystem module-by-subsystem module. Once commissioned, each subsystem module will be placed into service in the operating array.
• The initial complement of the ALMA operations team must be in place at the OSF and on the array site at the time the first array subsystem modules are commissioned..
• The details of the scientific operations plan need to be refined and implemented at the time the first few antennas arrive on site.
ALMA Operations Staffing—by Employer
• International StaffWho are employed by ESO, NRAO or NAOJ and seconded to ALMA
operations in Chile. (35 in 2013)
• Local StaffWho are employed through AUI/NRAO under Chilean labor laws in a manner
decided by the ALMA Board. (191 in 2013)
• Contract Services StaffIndividuals performing services under service contracts with ALMA. These
people are not employed directly by ALMA or the Executives. (144 in 2013)
• ARC Operations Support StaffStaff at ALMA Regional Centers providing operations and community support
(51 in 3 ARCs in 2013)
Plan for Overlap in Time with the Construction Project
• The plan for ALMA operations needs to be made consistent with the plans assumed for it in the ALMA construction plan. That is, the ramp-up with time of the ALMA operations staff needs to be planned consistent with the assumptions being made in the construction project.
– This process has been started, but needs to be planned in more detail when main JAO operations staff (Head of Technical Services, Head of Science Operations, Project Scientist) are in place.
• A plan for staffing of the commissioning effort needs to be melded with the construction and operations plans.
– Plan presented by R. Laing was developed to be consistent with current operations plan.
• There will be a time when all three staff—construction, commissioning and interim operations—will be on site at the same time. Their collective space requirements will exceed that needed for full ALMA operations.
Operations Group: I
• Origins– Created by JAO, reports to JAO– May 2003: Guilloteau, Sramek– August 2003: Emerson
Operations Group: II
• Other ALMA contributors– Brian Glendenning– Debra Shephard– Eduardo Hardy– Bill Porter
• External reviewers (Draft F)– Willem Baan (Westerbork)– Paul Ho (SMA)– Roberto Neri (IRAM)– Peggy Perley (NRAO)– David Woody (OVRO)– Melvyn Wright (BIMA)
Name Organization IPTDarrel Emerson NRAODavid Silva ESOTetsuo Hasegawa NAOJ ACAClint Janes NRAO Back-endMax Kraus ESO AntennaRobert Lucas IRAM Computing
(SSR)Jeff Mangum NRAO Antenna
EvaluationGroup
Sachiko Okumura NAOJ ACASimon Radford NRAO SiteJoseph Schwarz ESO ComputingRichard Simon NRAO JAODick Sramek NRAO System
EngineeringGie-Han Tan ESO Front-endJohn Webber NRAO CorrelatorAl Wootten NRAO Science
Operations Group: III
• First meeting December 2005• Concentrate on Operations staffing plan, budget,
outstanding issues identified by Board in Ops Plan ver. A.
• Participants:– JAO (Tarenghi, Beasley, Murowinski)– Project Managers (Russell, Rykaczewski, Hasegawa)– Project Scientists (Wootten, Wilson, Kawabe)– ARC Managers (Hibbard, Adreani, Kawabe)– Legacy (Emerson)
ALMA Operations Plan Update
• Modifications:– Includes entry of ALMA-J (ACA, bands 4 & 8 and possibly 10)– Technical positions staffed with local hires wherever possible– Recruitment of operations staff tied to construction milestones
Operations Staffing Ramp-up now tied to Construction Milestones
Identified positions added for trilateral project (orange)
Identified positions filled by transfer from Construction (blue; AIV staff in this case)
All positions tied to construction milestones (3 months before Early Science in this case)
ALMA Operations Plan Update
• Modifications:– Includes entry of ALMA-J (ACA, bands 4 & 8 and possibly 10)– Technical positions staffed with local hires wherever possible– Recruitment of operations staff tied to construction milestones– Adopt ASAC recommendation that CSV be extended, moving
Early Science Decision Point back ~ 9months.• Early Science starts Sept 2010
Current Staffing plan assumes ASAC recommendation to extend CSV
ALMA Operations Plan Update
• Modifications:– Includes entry of ALMA-J (ACA, bands 4 & 8 and possibly 10)– Technical positions staffed with local hires wherever possible– Recruitment of operations staff tied to construction milestones– Adopt ASAC recommendation that CSV be extended, moving
Early Science Decision Point back ~ 9months.• Early Science starts Sept 2010
– Planning baseline is for a single international Proposal Review Committee (none in Silva Plan)
• Meets once per year for first 3 cycles, then 2/year
ALMA Operations Plan Update
• Modifications:– Includes entry of ALMA-J (ACA, bands 4 & 8 and possibly 10)– Technical positions staffed with local hires wherever possible– Recruitment of operations staff tied to construction milestones– Adopt ASAC recommendation that CSV be extended, moving
Early Science Decision Point back ~ 9months.• Early Science starts Sept 2010
– Planning baseline is for a single international Proposal Review Committee (none in Silva Plan)
• Meets once per year for first 3 cycles, then 2/year
– “Contingency Line” replaced with smaller budget for Directors Emergency Fund.
ALMA Operations Plan Update
• Modifications:– Includes entry of ALMA-J (ACA, bands 4 & 8 and possibly 10)– Technical positions staffed with local hires wherever possible– Recruitment of operations staff tied to construction milestones– Adopt ASAC recommendation that CSV be extended, moving
Early Science Decision Point back ~ 9months.• Early Science starts Sept 2010
– Planning baseline is for a single international Proposal Review Committee (none in Silva Plan)
• Meets once per year for first 3 cycles, then 2/year
– “Contingency Line” replaced with smaller budget for Directors Emergency Fund.
– Development Plan…
ALMA Development Plan
• Long-range development plan– 2008 solicit community input
• Future ALMA science drivers (“2020 vision”)
• What new capabilities does ALMA need to address these science drivers?
– ALMA-wide plan 2009– executives and JAO work together to estimate initial costs
• Board, with input from ASAC, reviews the plan, provides policy guidance to generate scientific vision with both long-term and short-term projects
• Funding agencies sign-up to approved plan via ALMA Board
Board Decisions on Operations
• Automatic generation of images:– At the start of early science, there may not be enough data to
make a full pipeline analysis possible. Also, the ALMA staff needs to check the correctness of the pipeline results. After 1 to 2 years of early science operation the pipeline should be a reliably working system.
• Director’s Discretionary Time– No Director’s Discretionary Time is foreseen. All of the ALMA
time belongs to the executives.
• Data proprietary period– This will be 1 year starting with the end of the program. Special
cases could be considered in exceptional circumstances.
Joint ALMA Observatory
ALMA Observatory Top-Level
Division of Science Operations (DSO)
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1AG Manager2 - OSF/LSM/2010.2
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Array Operator6 - OSF/LSM/2010.2Array Operator7 - OSF/LSM/2010.2Array Operator8 - OSF/LSM/2010.2
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
Web Developer - NA/RSM/2009.4
Data Manager 1 - SCO/ISM/2009.1Data Manager 2 - SCO/ISM/2010.3
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
PDM Astr5 - OSF/ISM/2009.1PDM Astr6 - OSF/ISM/2009.1PDM Astr7 - OSF/ISM/2009.1PDM Astr8 - OSF/ISM/2009.1
PDM Astr9 - OSF/ISM/2010.2PDM Astr10 - OSF/ISM/2010.2PDM Astr11 - OSF/ISM/2010.2PDM Astr12 - OSF/ISM/2010.2PDM Astr13 - OSF/ISM/2010.2
PDM Fellow1 - OSF/ISM/2011.1PDM Fellow2 - OSF/ISM/2011.1PDM Fellow3 - OSF/ISM/2011.1
PDM Fellow4 - OSF/ISM/2012.1PDM Fellow5 - OSF/ISM/2012.1PDM Fellow6 - OSF/ISM/2012.1
PDM Fellow7 - OSF/ISM/2013.1PDM Fellow8 - OSF/ISM/2013.1
OSF ArchiveAppears in 2006.4, run by AIV
Better archive in 2008.4, run by OpsARCs start mirroring 2011.4
SCO Archive/PipelineStarts out in 2009 at OSF
SCO Archive mirrors OSF 2011Pipeline starts 2011.4
Archive Operator1 - OSF/LSM/2009.1Archive Operator2 - OSF/LSM/2009.1Archive Operator3 - OSF/LSM/2009.1
Content Manager1 - OSF/LSM/2009.1Content Manager2 - OSF/LSM/2010.1Content Manager3 - OSF/LSM/2010.1
Archive Operator1 - Both/LSM/2009.2Archive Operator2 - Both/LSM/2009.2Archive Operator3 - SCO/LSM/2011.4
DB Content Mangr1 - SCO/LSM/2011.4DB Content Mangr2 - SCO/LSM/2011.4DB Content Mangr3 - SCO/LSM/2012.2
ALMA Operations: Division of Science Operations (DSO): Full Operations
Red=added for ACABlue=Transfer from construction
Array Operator9 - OSF/LSM/2010.2Array Operator10 - OSF/LSM/2010.2Array Operator11 - OSF/LSM/2010.2Array Operator12 - OSF/LSM/2010.2
Head of Science OperationsBoth/ISM/2006.4
ALMA Operations: Division of Science Operations (DSO): 2007.4
Red=added for ACABlue=Transfer from construction
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
Antenna Operations Group (AOG)
2007 Milestones:Apr-07 Ant 1 AIV Receive at OSF
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
ALMA Operations: Division of Science Operations (DSO): 2008.4
Red=added for ACABlue=Transfer from construction
2008 Milestones:Apr-07 Ant 1 AIV Receive at OSFJun-08 Ant 1&2 OSF Interferometer Start Aug-08 Ant 1 AOS Checkout
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
Web Developer - NA/RSM/2009.4
Data Manager 1 - SCO/ISM/2009.1
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
PDM Astr5 - OSF/ISM/2009.1PDM Astr6 - OSF/ISM/2009.1PDM Astr7 - OSF/ISM/2009.1PDM Astr8 - OSF/ISM/2009.1
OSF ArchiveAppears in 2006.4, run by AIV
Better archive in 2008.4, run by OpsARCs start mirroring 2011.4
SCO Archive/PipelineStarts out in 2009 at OSF
SCO Archive mirrors OSF 2011Pipeline starts 2011.4
Archive Operator1 - OSF/LSM/2009.1Archive Operator2 - OSF/LSM/2009.1Archive Operator3 - OSF/LSM/2009.1
Content Manager1 - OSF/LSM/2009.1
Archive Operator1 - Both/LSM/2009.2Archive Operator2 - Both/LSM/2009.2
ALMA Operations: Division of Science Operations (DSO): 2009.4
Red=added for ACABlue=Transfer from construction
2009 Milestones:Apr-07 Ant 1 AIV Receive at OSFJun-08 Ant 1&2 OSF Interferometer Start Aug-08 Ant 1 AOS CheckoutJan-09 3-element Interferometr AOSJan-09 Start of CSV
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1AG Manager2 - OSF/LSM/2010.2
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Array Operator6 - OSF/LSM/2010.2Array Operator7 - OSF/LSM/2010.2Array Operator8 - OSF/LSM/2010.2
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
Web Developer - NA/RSM/2009.4
Data Manager 1 - SCO/ISM/2009.1Data Manager 2 - SCO/ISM/2010.3
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
PDM Astr5 - OSF/ISM/2009.1PDM Astr6 - OSF/ISM/2009.1PDM Astr7 - OSF/ISM/2009.1PDM Astr8 - OSF/ISM/2009.1
PDM Astr9 - OSF/ISM/2010.2PDM Astr10 - OSF/ISM/2010.2PDM Astr11 - OSF/ISM/2010.2PDM Astr12 - OSF/ISM/2010.2PDM Astr13 - OSF/ISM/2010.2
OSF ArchiveAppears in 2006.4, run by AIV
Better archive in 2008.4, run by OpsARCs start mirroring 2011.4
SCO Archive/PipelineStarts out in 2009 at OSF
SCO Archive mirrors OSF 2011Pipeline starts 2011.4
Archive Operator1 - OSF/LSM/2009.1Archive Operator2 - OSF/LSM/2009.1Archive Operator3 - OSF/LSM/2009.1
Content Manager1 - OSF/LSM/2009.1Content Manager2 - OSF/LSM/2010.1Content Manager3 - OSF/LSM/2010.1
Archive Operator1 - Both/LSM/2009.2Archive Operator2 - Both/LSM/2009.2
ALMA Operations: Division of Science Operations (DSO): 2010.4
Red=added for ACABlue=Transfer from construction
Array Operator9 - OSF/LSM/2010.2Array Operator10 - OSF/LSM/2010.2Array Operator11 - OSF/LSM/2010.2Array Operator12 - OSF/LSM/2010.2
2010 Milestones:Apr-07 Ant 1 AIV Receive at OSFJun-08 Ant 1&2 OSF Interferometer Start Aug-08 Ant 1 AOS CheckoutJan-09 3-element Interferometr AOSJan-09 Start of CSVJan-10 Early Science Decision Point/CfPApr-10 End SV 15 element ArraySep-10 Start Early Science
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1AG Manager2 - OSF/LSM/2010.2
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Array Operator6 - OSF/LSM/2010.2Array Operator7 - OSF/LSM/2010.2Array Operator8 - OSF/LSM/2010.2
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
Web Developer - NA/RSM/2009.4
Data Manager 1 - SCO/ISM/2009.1Data Manager 2 - SCO/ISM/2010.3
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
PDM Astr5 - OSF/ISM/2009.1PDM Astr6 - OSF/ISM/2009.1PDM Astr7 - OSF/ISM/2009.1PDM Astr8 - OSF/ISM/2009.1
PDM Astr9 - OSF/ISM/2010.2PDM Astr10 - OSF/ISM/2010.2PDM Astr11 - OSF/ISM/2010.2PDM Astr12 - OSF/ISM/2010.2PDM Astr13 - OSF/ISM/2010.2
PDM Fellow1 - OSF/ISM/2011.1PDM Fellow2 - OSF/ISM/2011.1PDM Fellow3 - OSF/ISM/2011.1
OSF ArchiveAppears in 2006.4, run by AIV
Better archive in 2008.4, run by OpsARCs start mirroring 2011.4
SCO Archive/PipelineStarts out in 2009 at OSF
SCO Archive mirrors OSF 2011Pipeline starts 2011.4
Archive Operator1 - OSF/LSM/2009.1Archive Operator2 - OSF/LSM/2009.1Archive Operator3 - OSF/LSM/2009.1
Content Manager1 - OSF/LSM/2009.1Content Manager2 - OSF/LSM/2010.1Content Manager3 - OSF/LSM/2010.1
Archive Operator1 - Both/LSM/2009.2Archive Operator2 - Both/LSM/2009.2
Archive Operator3 - SCO/LSM/2011.4
DB Content Mangr1 - SCO/LSM/2011.4DB Content Mangr2 - SCO/LSM/2011.4
ALMA Operations: Division of Science Operations (DSO): 2011.4
Red=added for ACABlue=Transfer from construction
Array Operator9 - OSF/LSM/2010.2Array Operator10 - OSF/LSM/2010.2Array Operator11 - OSF/LSM/2010.2Array Operator12 - OSF/LSM/2010.2
2011 Milestones:Apr-07 Ant 1 AIV Receive at OSFJun-08 Ant 1&2 OSF Interferometer Start Aug-08 Ant 1 AOS CheckoutJan-09 3-element Interferometr AOSJan-09 Start of CSVJan-10 Early Science Decision Point/CfPApr-10 End SV 15 element ArraySep-10 Start Early ScienceOct-11 Pipeline commissioned at SCO
Array Operator1 - OSF/LSM/2006.4Array Operator2 - OSF/LSM/2006.4
AG Manager1 - OSF/LSM/2008.1AG Manager2 - OSF/LSM/2010.2
Array Operator3 - OSF/LSM/2008.3Array Operator4 - OSF/LSM/2008.3Array Operator5 - OSF/LSM/2008.3
Array Operator6 - OSF/LSM/2010.2Array Operator7 - OSF/LSM/2010.2Array Operator8 - OSF/LSM/2010.2
Antenna Operations Group (AOG)
Program and Data Management Group (PDG)
Admin Asst1 - OSF/LSM/2008.1Admin Asst2 - OSF/LSM/2008.1
Head of Science OperationsBoth/ISM/2006.4
Sci. Prog. ManagerOSF/ISM/2008.1
Web Developer - NA/RSM/2009.4
Data Manager 1 - SCO/ISM/2009.1Data Manager 2 - SCO/ISM/2010.3
System Astr1 - OSF/ISM/2008.2System Astr2 - OSF/ISM/2008.2System Astr3 - OSF/ISM/2008.2System Astr4 - OSF/ISM/2008.2
PDM Astr1 - OSF/ISM/2008.2PDM Astr2 - OSF/ISM/2008.2PDM Astr3 - OSF/ISM/2008.2PDM Astr4 - OSF/ISM/2008.2
PDM Astr5 - OSF/ISM/2009.1PDM Astr6 - OSF/ISM/2009.1PDM Astr7 - OSF/ISM/2009.1PDM Astr8 - OSF/ISM/2009.1
PDM Astr9 - OSF/ISM/2010.2PDM Astr10 - OSF/ISM/2010.2PDM Astr11 - OSF/ISM/2010.2PDM Astr12 - OSF/ISM/2010.2PDM Astr13 - OSF/ISM/2010.2
PDM Fellow1 - OSF/ISM/2011.1PDM Fellow2 - OSF/ISM/2011.1PDM Fellow3 - OSF/ISM/2011.1
PDM Fellow4 - OSF/ISM/2012.1PDM Fellow5 - OSF/ISM/2012.1PDM Fellow6 - OSF/ISM/2012.1
PDM Fellow7 - OSF/ISM/2013.1PDM Fellow8 - OSF/ISM/2013.1
OSF ArchiveAppears in 2006.4, run by AIV
Better archive in 2008.4, run by OpsARCs start mirroring 2011.4
SCO Archive/PipelineStarts out in 2009 at OSF
SCO Archive mirrors OSF 2011Pipeline starts 2011.4
Archive Operator1 - OSF/LSM/2009.1Archive Operator2 - OSF/LSM/2009.1Archive Operator3 - OSF/LSM/2009.1
Content Manager1 - OSF/LSM/2009.1Content Manager2 - OSF/LSM/2010.1Content Manager3 - OSF/LSM/2010.1
Archive Operator1 - Both/LSM/2009.2Archive Operator2 - Both/LSM/2009.2Archive Operator3 - SCO/LSM/2011.4
DB Content Mangr1 - SCO/LSM/2011.4DB Content Mangr2 - SCO/LSM/2011.4DB Content Mangr3 - SCO/LSM/2012.2
ALMA Operations: Division of Science Operations (DSO): Full Operations
Red=added for ACABlue=Transfer from construction
Array Operator9 - OSF/LSM/2010.2Array Operator10 - OSF/LSM/2010.2Array Operator11 - OSF/LSM/2010.2Array Operator12 - OSF/LSM/2010.2
Divison of Technical Services (DTS)
ALMA Operations: Division of Technical Services (DTS): Full Operations
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1(5) IS Tech 6-10 - OSF/CSM/2009.1(3) IS Tech11-13 - OSF/CSM/2009.3(3) IS Tech14-16 - OSF/CSM/2010.3
Antenna Group Electronics Group Maintenance Group Computing Group
(6) Mtech 1-6 - OSF/LSM/2009.1(3) Mtech 7-9 - OSF/LSM/2009.3
(3) Mtech 10-12 - OSF/LSM/2009.3(3) MTech13-15 - OSF/LSM/2010.3(3) MTech16-18 - OSF/LSM/2011.1
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4DB Admin2 - OSF/LSM/2010.1DB Admin3 - OSF/LSM/2010.1
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4IT Supprt7 - OSF/CSM/2010.1
(2) OpMTec1,2 - OSF/LSM/2008.2 OpMTec3 - OSF/LSM/2009.1
(2) OpMTec4,5 - OSF/LSM/2011.1
(2) MTech1,2 - OSF/LSM/2008.2 MTech3 - OSF/LSM/2009.1
(2) MTech4,5 - OSF/LSM/2009.3
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4(2) ETech7-8 - OSF/LSM/2009.1(5) ETech9-13 - OSF/LSM/2009.3(2) ETech14-15 - OSF/LSM/2010.3(2) ETech16-17 - OSF/LSM/2011.1(4) ETech18-21 - OSF/LSM/2011.3
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2Corr.Eng3 - OSF/LSM/2009.1
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4 Lead3 - OSF/LSM/2009.1 Lead4 - OSF/LSM/2009.1
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4Machinist3 - OSF/LSM/2009.1
(2)Machinist4,5 - OSF/LSM/2010.3Machinist6 - OSF/LSM/2011.4
(2) Helper1,2 - OSF/LSM/2007.4 Helper3 - OSF/LSM/2009.1
(2) Helper4,5 - OSF/LSM/2010.3 Helper6 - OSF/LSM/2011.4
(2) MechTech1,2-OSF/LSM/2007.4 MechTech3 - OSF/LSM/2009.1
(2) MechTech4,5 - OSF/LSM/2010.3 MechTech6 - OSF/LSM/2011.4
(2) ElecTech1,2 - OSF/LSM/2007.4 ElecTech3 - OSF/LSM/2009.1
(2) ElecTech4,5 - OSF/LSM/2010.3 ElecTech6 - OSF/LSM/2011.4
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
(2)TransportDr3-4 - OSF/LSM/2009.1 TransportDr5 - OSF/LSM/2010.3 TransportDr6 - OSF/LSM/2011.4
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2CntrlSpec3 - OSF/LSM/2009.1CntrlSpec4 - OSF/LSM/2010.3
Ant.Super1 - OSF/LSM/2008.2Ant.Super2 - OSF/LSM/2009.1Ant.Super3 - OSF/LSM/2009.1Ant.Super4 - OSF/LSM/2010.3Ant.Super5 - OSF/LSM/2010.3Ant.Super6 - OSF/LSM/2011.4
Ant.Mang1 - OSF/LSM/2007.2Ant.Mang2 - OSF/LSM/2009.1Ant.Mang3 - OSF/LSM/2009.1
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2E.Eng4 - OSF/LSM/2009.1E.Eng5 - OSF/LSM/2009.1
(3) E.Eng6-8 - OSF/LSM/2009.3
Blue=Transfer from construction
IT Supprt8 - SCO/CSM/2009.3IT Supprt9 - SCO/CSM/2009.3IT Spprt10 - SCO/CSM/2009.3
MIS Spprt1 -SCO/CSM/2009.3MIS Spprt2 -SCO/CSM/2009.3
DB Admin4 - SCO/ISM/2009.3
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng8 - Both/LSM/2011.1SW Eng9 - Both/LSM/2011.1
SW Eng10 - Both/LSM/2011.1SW Eng11 - Both/LSM/2011.1
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1SMO Eng2 - OSF/LSM/2010.1SMO Eng3 - OSF/LSM/2011.1
EDMS Admin - SCO/LSM/2010.3CMMS Admin - SCO/LSM/2010.3
Head Tech ServicesOSF/ISM/2006.3
Sys.Eng1 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
IT Manager - SCO/LSM/2009.1
ALMA Operations: Division of Technical Services (DTS): 2007.4
Red=added for ACA
IT Computing Group
Antenna Group Electronics Group Maintenance Group Computing Group
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4
(2) Helper1,2 - OSF/LSM/2007.4
(2) MechTech1,2-OSF/LSM/2007.4
(2) ElecTech1,2 - OSF/LSM/2007.4
Transport Super - OSF/LSM/2006.4
CntrlSpec1 - OSF/LSM/2007.2
Ant.Mang1 - OSF/LSM/2007.2
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4
Blue=Transfer from construction
CG Manager 1 - Both/LSM/2007.3
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
Head Tech ServicesOSF/ISM/2006.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
2007 milestones:Apr-07 Back End 1 AIV receive at OSFApr-07 Ant 1 AIV Receive at OSFMay-07 1st Quadrant Corr. AIV receive at OSF
ALMA Operations: Division of Technical Services (DTS): 2008.4
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1
Antenna Group Electronics Group Maintenance Group Computing Group
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4(2) OpMTec1,2 - OSF/LSM/2008.2
(2) MTech1,2 - OSF/LSM/2008.2
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4
(2) Helper1,2 - OSF/LSM/2007.4
(2) MechTech1,2-OSF/LSM/2007.4
(2) ElecTech1,2 - OSF/LSM/2007.4
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2
Ant.Super1 - OSF/LSM/2008.2
Ant.Mang1 - OSF/LSM/2007.2
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2
Blue=Transfer from construction
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1
Head Tech ServicesOSF/ISM/2006.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
2008 milestones:Apr-08 ACA Correlator at AOSMar-08 Delivery of OSF FacilitiesJun-08 1 baseline interferometry at OSFAug-08 Ant1 AOS Checkout
ALMA Operations: Division of Technical Services (DTS): 2009.4
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1(5) IS Tech 6-10 - OSF/CSM/2009.1(3) IS Tech11-13 - OSF/CSM/2009.3
Antenna Group Electronics Group Maintenance Group Computing Group
(6) Mtech 1-6 - OSF/LSM/2009.1(3) Mtech 7-9 - OSF/LSM/2009.3
(3) Mtech 10-12 - OSF/LSM/2009.3
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4(2) OpMTec1,2 - OSF/LSM/2008.2
OpMTec3 - OSF/LSM/2009.1
(2) MTech1,2 - OSF/LSM/2008.2 MTech3 - OSF/LSM/2009.1
(2) MTech4,5 - OSF/LSM/2009.3
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4(2) ETech7-8 - OSF/LSM/2009.1(5) ETech9-13 - OSF/LSM/2009.3
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2Corr.Eng3 - OSF/LSM/2009.1
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4 Lead3 - OSF/LSM/2009.1 Lead4 - OSF/LSM/2009.1
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4Machinist3 - OSF/LSM/2009.1
(2) Helper1,2 - OSF/LSM/2007.4 Helper3 - OSF/LSM/2009.1
(2) MechTech1,2-OSF/LSM/2007.4 MechTech3 - OSF/LSM/2009.1
(2) ElecTech1,2 - OSF/LSM/2007.4 ElecTech3 - OSF/LSM/2009.1
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
(2)TransportDr3-4 - OSF/LSM/2009.1
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2CntrlSpec3 - OSF/LSM/2009.1
Ant.Super1 - OSF/LSM/2008.2Ant.Super2 - OSF/LSM/2009.1Ant.Super3 - OSF/LSM/2009.1
Ant.Mang1 - OSF/LSM/2007.2Ant.Mang2 - OSF/LSM/2009.1Ant.Mang3 - OSF/LSM/2009.1
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2E.Eng4 - OSF/LSM/2009.1E.Eng5 - OSF/LSM/2009.1
(3) E.Eng6-8 - OSF/LSM/2009.3
Blue=Transfer from construction
IT Supprt8 - SCO/CSM/2009.3IT Supprt9 - SCO/CSM/2009.3IT Spprt10 - SCO/CSM/2009.3
MIS Spprt1 -SCO/CSM/2009.3MIS Spprt2 -SCO/CSM/2009.3
DB Admin4 - SCO/ISM/2009.3
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1
Head Tech ServicesOSF/ISM/2006.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
IT Manager - SCO/LSM/2009.1
2009 milestones:Jan-09 3 ant of different types at AOSJan-09 3-element Interferometer at AOSJan-09 Start of CSVSep-09 Ship Chilean Archive and Pipeline computer equip
ALMA Operations: Division of Technical Services (DTS): 2010.4
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1(5) IS Tech 6-10 - OSF/CSM/2009.1(3) IS Tech11-13 - OSF/CSM/2009.3(3) IS Tech14-16 - OSF/CSM/2010.3
Antenna Group Electronics Group Maintenance Group Computing Group
(6) Mtech 1-6 - OSF/LSM/2009.1(3) Mtech 7-9 - OSF/LSM/2009.3
(3) Mtech 10-12 - OSF/LSM/2009.3(3) MTech13-15 - OSF/LSM/2010.3
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4DB Admin2 - OSF/LSM/2010.1DB Admin3 - OSF/LSM/2010.1
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4IT Supprt7 - OSF/CSM/2010.1
(2) OpMTec1,2 - OSF/LSM/2008.2 OpMTec3 - OSF/LSM/2009.1
(2) MTech1,2 - OSF/LSM/2008.2 MTech3 - OSF/LSM/2009.1
(2) MTech4,5 - OSF/LSM/2009.3
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4(2) ETech7-8 - OSF/LSM/2009.1(5) ETech9-13 - OSF/LSM/2009.3
(2) ETech14-15 - OSF/LSM/2010.3
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2Corr.Eng3 - OSF/LSM/2009.1
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4 Lead3 - OSF/LSM/2009.1 Lead4 - OSF/LSM/2009.1
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4Machinist3 - OSF/LSM/2009.1
(2)Machinist4,5 - OSF/LSM/2010.3
(2) Helper1,2 - OSF/LSM/2007.4 Helper3 - OSF/LSM/2009.1
(2) Helper4,5 - OSF/LSM/2010.3
(2) MechTech1,2-OSF/LSM/2007.4 MechTech3 - OSF/LSM/2009.1
(2) MechTech4,5 - OSF/LSM/2010.3
(2) ElecTech1,2 - OSF/LSM/2007.4 ElecTech3 - OSF/LSM/2009.1
(2) ElecTech4,5 - OSF/LSM/2010.3
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
(2)TransportDr3-4 - OSF/LSM/2009.1 TransportDr5 - OSF/LSM/2010.3
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2CntrlSpec3 - OSF/LSM/2009.1CntrlSpec4 - OSF/LSM/2010.3
Ant.Super1 - OSF/LSM/2008.2Ant.Super2 - OSF/LSM/2009.1Ant.Super3 - OSF/LSM/2009.1Ant.Super4 - OSF/LSM/2010.3Ant.Super5 - OSF/LSM/2010.3
Ant.Mang1 - OSF/LSM/2007.2Ant.Mang2 - OSF/LSM/2009.1Ant.Mang3 - OSF/LSM/2009.1
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2E.Eng4 - OSF/LSM/2009.1E.Eng5 - OSF/LSM/2009.1
(3) E.Eng6-8 - OSF/LSM/2009.3
Blue=Transfer from construction
IT Supprt8 - SCO/CSM/2009.3IT Supprt9 - SCO/CSM/2009.3IT Spprt10 - SCO/CSM/2009.3
MIS Spprt1 -SCO/CSM/2009.3MIS Spprt2 -SCO/CSM/2009.3
DB Admin4 - SCO/ISM/2009.3
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1SMO Eng2 - OSF/LSM/2010.1
EDMS Admin - SCO/LSM/2010.3CMMS Admin - SCO/LSM/2010.3
Head Tech ServicesOSF/ISM/2006.3
Sys.Eng1 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
IT Manager - SCO/LSM/2009.1
2010 milestones:Jan-10 Early Science Decision Point/CfPApr-10 Start SV Ant 16Sep-10 Start Early Science
ALMA Operations: Division of Technical Services (DTS): 2011.4
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1(5) IS Tech 6-10 - OSF/CSM/2009.1(3) IS Tech11-13 - OSF/CSM/2009.3(3) IS Tech14-16 - OSF/CSM/2010.3
Antenna Group Electronics Group Maintenance Group Computing Group
(6) Mtech 1-6 - OSF/LSM/2009.1(3) Mtech 7-9 - OSF/LSM/2009.3
(3) Mtech 10-12 - OSF/LSM/2009.3(3) MTech13-15 - OSF/LSM/2010.3(3) MTech16-18 - OSF/LSM/2011.1
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4DB Admin2 - OSF/LSM/2010.1DB Admin3 - OSF/LSM/2010.1
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4IT Supprt7 - OSF/CSM/2010.1
(2) OpMTec1,2 - OSF/LSM/2008.2 OpMTec3 - OSF/LSM/2009.1
(2) OpMTec4,5 - OSF/LSM/2011.1
(2) MTech1,2 - OSF/LSM/2008.2 MTech3 - OSF/LSM/2009.1
(2) MTech4,5 - OSF/LSM/2009.3
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4(2) ETech7-8 - OSF/LSM/2009.1(5) ETech9-13 - OSF/LSM/2009.3(2) ETech14-15 - OSF/LSM/2010.3(2) ETech16-17 - OSF/LSM/2011.1(4) ETech18-21 - OSF/LSM/2011.3
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2Corr.Eng3 - OSF/LSM/2009.1
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4 Lead3 - OSF/LSM/2009.1 Lead4 - OSF/LSM/2009.1
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4Machinist3 - OSF/LSM/2009.1
(2)Machinist4,5 - OSF/LSM/2010.3Machinist6 - OSF/LSM/2011.4
(2) Helper1,2 - OSF/LSM/2007.4 Helper3 - OSF/LSM/2009.1
(2) Helper4,5 - OSF/LSM/2010.3 Helper6 - OSF/LSM/2011.4
(2) MechTech1,2-OSF/LSM/2007.4 MechTech3 - OSF/LSM/2009.1
(2) MechTech4,5 - OSF/LSM/2010.3 MechTech6 - OSF/LSM/2011.4
(2) ElecTech1,2 - OSF/LSM/2007.4 ElecTech3 - OSF/LSM/2009.1
(2) ElecTech4,5 - OSF/LSM/2010.3 ElecTech6 - OSF/LSM/2011.4
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
(2)TransportDr3-4 - OSF/LSM/2009.1 TransportDr5 - OSF/LSM/2010.3 TransportDr6 - OSF/LSM/2011.4
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2CntrlSpec3 - OSF/LSM/2009.1CntrlSpec4 - OSF/LSM/2010.3
Ant.Super1 - OSF/LSM/2008.2Ant.Super2 - OSF/LSM/2009.1Ant.Super3 - OSF/LSM/2009.1Ant.Super4 - OSF/LSM/2010.3Ant.Super5 - OSF/LSM/2010.3Ant.Super6 - OSF/LSM/2011.4
Ant.Mang1 - OSF/LSM/2007.2Ant.Mang2 - OSF/LSM/2009.1Ant.Mang3 - OSF/LSM/2009.1
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2E.Eng4 - OSF/LSM/2009.1E.Eng5 - OSF/LSM/2009.1
(3) E.Eng6-8 - OSF/LSM/2009.3
Blue=Transfer from construction
IT Supprt8 - SCO/CSM/2009.3IT Supprt9 - SCO/CSM/2009.3IT Spprt10 - SCO/CSM/2009.3
MIS Spprt1 -SCO/CSM/2009.3MIS Spprt2 -SCO/CSM/2009.3
DB Admin4 - SCO/ISM/2009.3
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng8 - Both/LSM/2011.1SW Eng9 - Both/LSM/2011.1
SW Eng10 - Both/LSM/2011.1SW Eng11 - Both/LSM/2011.1
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1SMO Eng2 - OSF/LSM/2010.1SMO Eng3 - OSF/LSM/2011.1
EDMS Admin - SCO/LSM/2010.3CMMS Admin - SCO/LSM/2010.3
Head Tech ServicesOSF/ISM/2006.3
Sys.Eng1 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
IT Manager - SCO/LSM/2009.1
2011 milestones:Aug-11 32 Ant SVOct-11 SCO Archive/pipeline
ALMA Operations: Division of Technical Services (DTS): Full Operations
Red=added for ACA
IT Computing Group
(5) IS Tech 1-5 - OSF/CSM/2008.1(5) IS Tech 6-10 - OSF/CSM/2009.1(3) IS Tech11-13 - OSF/CSM/2009.3(3) IS Tech14-16 - OSF/CSM/2010.3
Antenna Group Electronics Group Maintenance Group Computing Group
(6) Mtech 1-6 - OSF/LSM/2009.1(3) Mtech 7-9 - OSF/LSM/2009.3
(3) Mtech 10-12 - OSF/LSM/2009.3(3) MTech13-15 - OSF/LSM/2010.3(3) MTech16-18 - OSF/LSM/2011.1
MG Mangr1 - OSF/LSM/2008.1MG Mangr2 - OSF/LSM/2008.1
DB Admin1 - OSF/LSM/2008.4DB Admin2 - OSF/LSM/2010.1DB Admin3 - OSF/LSM/2010.1
IT Supprt1 - OSF/CSM/2007.2IT Supprt2 - OSF/CSM/2007.2IT Supprt3 - OSF/CSM/2007.2IT Supprt4 - OSF/CSM/2008.4IT Supprt5 - OSF/CSM/2008.4IT Supprt6 - OSF/CSM/2008.4IT Supprt7 - OSF/CSM/2010.1
(2) OpMTec1,2 - OSF/LSM/2008.2 OpMTec3 - OSF/LSM/2009.1
(2) OpMTec4,5 - OSF/LSM/2011.1
(2) MTech1,2 - OSF/LSM/2008.2 MTech3 - OSF/LSM/2009.1
(2) MTech4,5 - OSF/LSM/2009.3
(3) ETech1-3 - OSF/LSM/2008.2(3) ETech4-6 - OSF/LSM/2008.4(2) ETech7-8 - OSF/LSM/2009.1(5) ETech9-13 - OSF/LSM/2009.3(2) ETech14-15 - OSF/LSM/2010.3(2) ETech16-17 - OSF/LSM/2011.1(4) ETech18-21 - OSF/LSM/2011.3
Corr.Eng1 - OSF/LSM/2007.2Corr.Eng2 - OSF/LSM/2007.2Corr.Eng3 - OSF/LSM/2009.1
Lead1 - OSF/LSM/2007.4 Lead2 - OSF/LSM/2007.4 Lead3 - OSF/LSM/2009.1 Lead4 - OSF/LSM/2009.1
EG Mangr1 - OSF/LSM/2007.2EG Mangr2 - OSF/LSM/2007.4
(2)Machinist1,2 - OSF/LSM/2007.4Machinist3 - OSF/LSM/2009.1
(2)Machinist4,5 - OSF/LSM/2010.3Machinist6 - OSF/LSM/2011.4
(2) Helper1,2 - OSF/LSM/2007.4 Helper3 - OSF/LSM/2009.1
(2) Helper4,5 - OSF/LSM/2010.3 Helper6 - OSF/LSM/2011.4
(2) MechTech1,2-OSF/LSM/2007.4 MechTech3 - OSF/LSM/2009.1
(2) MechTech4,5 - OSF/LSM/2010.3 MechTech6 - OSF/LSM/2011.4
(2) ElecTech1,2 - OSF/LSM/2007.4 ElecTech3 - OSF/LSM/2009.1
(2) ElecTech4,5 - OSF/LSM/2010.3 ElecTech6 - OSF/LSM/2011.4
Transport Super - OSF/LSM/2006.4 TransportDr2 - OSF/LSM/2008.2
(2)TransportDr3-4 - OSF/LSM/2009.1 TransportDr5 - OSF/LSM/2010.3 TransportDr6 - OSF/LSM/2011.4
CntrlSpec1 - OSF/LSM/2007.2CntrlSpec2 - OSF/LSM/2008.2CntrlSpec3 - OSF/LSM/2009.1CntrlSpec4 - OSF/LSM/2010.3
Ant.Super1 - OSF/LSM/2008.2Ant.Super2 - OSF/LSM/2009.1Ant.Super3 - OSF/LSM/2009.1Ant.Super4 - OSF/LSM/2010.3Ant.Super5 - OSF/LSM/2010.3Ant.Super6 - OSF/LSM/2011.4
Ant.Mang1 - OSF/LSM/2007.2Ant.Mang2 - OSF/LSM/2009.1Ant.Mang3 - OSF/LSM/2009.1
E.Eng1 - OSF/LSM/2007.4E.Eng2 - OSF/LSM/2007.4E.Eng3 - OSF/LSM/2008.2E.Eng4 - OSF/LSM/2009.1E.Eng5 - OSF/LSM/2009.1
(3) E.Eng6-8 - OSF/LSM/2009.3
Blue=Transfer from construction
IT Supprt8 - SCO/CSM/2009.3IT Supprt9 - SCO/CSM/2009.3IT Spprt10 - SCO/CSM/2009.3
MIS Spprt1 -SCO/CSM/2009.3MIS Spprt2 -SCO/CSM/2009.3
DB Admin4 - SCO/ISM/2009.3
CG Manager 1 - Both/LSM/2007.3CG Manager 2 - Both/LSM/2008.4
SW Eng8 - Both/LSM/2011.1SW Eng9 - Both/LSM/2011.1
SW Eng10 - Both/LSM/2011.1SW Eng11 - Both/LSM/2011.1
SW Eng5 - Both/LSM/2008.2SW Eng6 - Both/LSM/2008.2SW Eng7 - Both/LSM/2008.2
SW Eng1 - Both/LSM/2006.4SW Eng2 - Both/LSM/2006.4SW Eng3 - Both/LSM/2006.4SW Eng4 - Both/LSM/2007.2
SMO Eng1 - Both/LSM/2008.1SMO Eng2 - OSF/LSM/2010.1SMO Eng3 - OSF/LSM/2011.1
EDMS Admin - SCO/LSM/2010.3CMMS Admin - SCO/LSM/2010.3
Head Tech ServicesOSF/ISM/2006.3
Sys.Eng1 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3Sys.Eng2 - OSF/ISM/2010.3
Admin Ass’t 1 - OSF/LSM/2007.4Admin Ass’t 2 - OSF/LSM/2007.4 Spectrum Manager - SCO/ISM/2007.1
IT Manager - SCO/LSM/2009.1
ALMA Regional Centers (ARCs)
ALMA Operations: Three ALMA Regional Centers - ARCs
Joint ALMA Observatory
NA ARCEU ARC (ESO)
J ARC
?NAOJ
EU ARC nodes
NAASC
ARCs provide basic user interface, as well as basic archive, software, and hardware maintenance and development
“Beyond ARC” User Services
ARCs are integral part of
JAO ALMA Operations
Required ARC “Core” tasks• Operations support tasks:
– Participate in Commissioning & Science Verification.– Schedule block verification.– Astronomer on Duty. – Data reduction help-desk.– TAC support (technical feasibility assessment) – Coordination meetings between ARCs, JAO.
• For each s/w system (offline, PST, ObsTool, pipeline):– Participating in software pre-release tests (~ bi-annual).– “Exercising” s/w: using software to reduce simulated or real data; refine
pipeline heuristics.– End-user documentation (hardcopy and web-based).– Support: helpdesk for offline, PST, ObsTool; develop heuristics for
pipeline.
• ARC Mirror Archive– Complete copy of SCO Science Archive, including raw and calibration
data.
ARC staff should be testing/exercising user software (PST, ObsTool, offline, pipeline) prior to its deployment as a means to train for support duties and to write support documentation.
• Offline software released 2007.1– Leaves 2 years for exercising on ALMA-like data (VLA, SMA, etc.) until Early
Science Decision Point (ESDP) in 2010.1
• Proposal Submission Tool “more or less done” 2007.2, more fully integrated 2008.1.
– Leaves ~2 year for testing/training prior to earliest Call for Proposals in 2010.1.
• ObsTool (proposal Phase II): ready for expert users in 2009.1. – Leaves ~18mo for testing/training until first phase II in 2010.3.
• Pipeline delivered 2011.3– ARC staff help develop heuristics; will be involved in e2e tests prior to deployment
ARC staff need to test, train, and generate end-user documentation (e.g. cookbooks) by Call for Proposal (PST, 2010.1), Phase II submission (ObsTool, 2010.3) and Early Science (Offline, 2010.3). Must exercise pipeline and refine heuristics with ALMA data prior to delivery in 2011.3.
ARC pre-Operations Duties
2006.4 NSF proposal due ………………………………………………………………………………………………………
2007.1 Offline software/level1 …………………………………………………………………………………………………
2007.2 PST “mostly done” ……………………………………………………………………………………………………..
2007.3 ………………………………………………………………………………………………………………………………
2007.4 ………………………………………………………………………………………………………………………………
2008.1 ………………………………………………………………………………………………………………………………
2008.2 ………………………………………………………………………………………………………………………………
2008.3 ………………………………………………………………………………………………………………………………
2008.4 3 element inter/AoD starts ……………………………………………………………………………………………
2009.1 OT ready for “expert users” …………………………………………………………………………………………….
2009.2 ESDP: CfP/prop. submissionESDP: CfP/prop. submission ………………………………………………………………………………………….
2009.3 TAC support TAC support …………………………………………………………………………………………………………….
2009.4 phase II submissionphase II submission …………………………………………………………………………………………………….
2010.1 Start early scienceStart early science ESDP:CfP …..……………………………………………………………………………………
2010.2 TAC support ……………………….……………………………………………………………………………………
2010.3 phase II submission …………….………………………………………………………………………………………
2010.4 Start early science ………………………………………………………………………………………………………
2011.1 ………………………………………………………………………………………………………………………………
2011.2 Pipeline at SCO …………………………………………………………………………………………………………
2011.3 ARC mirror archives ……………………………………………………………………………………………………
2011.4 ………………………………………………………………………………………………………………………………
2012.1 ………………………………………………………………………………………………………………………………
2012.2 ………………………………………………………………………………………………………………………………
2012.3 ………………………………………………………………………………………………………………………………
2012.4 ………………………………………………………………………………………………………………………………
Delaying Early Science
Software support
Off
lin
e
Non-core: splatalogue,Schools, workshops,Calibration surveys
=workshop
=schoolS
W
W
S
W
S
W
S
W
S
W
De
mo
nst
ratio
n S
cie
nce
Other support
PS
T
Pip
eli
ne
Ob
sT
oo
l
Pre-test
exercise
support
docOther
Pip
elin
e h
eu
ristic
s
Ao
D
TA
C S
up
po
rt
Sch
ed
. B
lock
ve
rific
atio
n
CS
V
W
ALMA Operations: ALMA Regional Centers: Full Operations
NA ARC
Database Managr1 - NA/RSM/2011.2Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2011.3
Archive Developr1 - NA/RSM/2011.4Archive Developr2 - NA/RSM/2011.4
ARC Head Office ARC Manager - NA/RSM/2006.1
AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2006.3ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4ARC Astronomer4 - NA/RSM/2010.2ARC Astronomer5 - NA/RSM/2010.2 ARC Astronomer6 - NA/RSM/2011.1
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2009.2ARC Scientist4 - NA/RSM/2010.2Web Developer - NA/RSM/2009.4
EA ARC
Database Managr1 - NA/RSM/2011.2Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2011.3
Archive Developr1 - NA/RSM/2011.4Archive Developr2 - NA/RSM/2011.4
ARC Head Office ARC Manager - NA/RSM/2006.3
AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2007.1ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4ARC Astronomer4 - NA/RSM/2010.2
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2010.2
Web Developer - NA/RSM/2009.4
EU ARC
Database Managr1 - NA/RSM/2011.2Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2011.3
Archive Developr1 - NA/RSM/2011.4Archive Developr2 - NA/RSM/2011.4
ARC Head Office ARC Manager - NA/RSM/2006.3
AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2007.1ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4ARC Astronomer4 - NA/RSM/2010.2ARC Astronomer5 - NA/RSM/2010.2 ARC Astronomer6 - NA/RSM/2011.1
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2009.2ARC Scientist4 - NA/RSM/2010.2Web Developer - NA/RSM/2009.4
North American ALMA Science Center
(NAASC)
One-stop shopping for NA astronomers
• Proposals
• Observing scripts
• Data archive and reduction
NAASC: North America ALMA Science Center, Charlottesville, VA
ALMA Operations: Three ALMA Regional Centers - ARCs
Joint ALMA Observatory
NA ARCEU ARC (ESO)
J ARC
?NAOJ
“Satellite” EU ARCs
NAASC
ARCs provide basic user interface, as well as basic archive, software, and hardware maintenance and development
“Beyond ARC” User Services
Beyond ARC is needed to provide advanced user support, algorithm development, student programs, EPO, grants
User ScienceSupport
Data Management
DivisionMaintenance & Repair
of NA software deliverables; software development for new operational modes
Archive Operations
Postdocs& students
Professional Development
Advanced User Support
Science Development
Division
NA ALMAEPO
Chilean Affairs
Technical Division
Maintenance & Repair of NA hardware
deliverables; hardware
development for new mm/submm capabilities
NAASC Head Office
ANASAC
NRAO Directors
Office
NA ARC Manager
= ARC Core support
= MR&D support
= Enhanced services
NAASC Org. Chart
Operations Technical Support
• Operations running cost include budget to provide technical support for hardware and software delivered to project by each executive– Best to have experts who built hardware or wrote
software maintain it.
• Managed by Director of Technical Services (hardware) or Director of Science Operations (software).– How managed regionally depends on executive
User ScienceSupport
Data Management
DivisionMaintenance & Repair
of NA software deliverables; software development for new operational modes
Archive Operations
Postdocs& students
Professional Development
Advanced User Support
Science Development
Division
NA ALMAEPO
Chilean Affairs
Technical Division
Maintenance & Repair of NA hardware
deliverables; hardware
development for new mm/submm capabilities
NAASC Head Office
ANASAC
NRAO Directors
Office
NA ARC Manager
= ARC Core support
= MR&D support
= Enhanced services
NAASC Org. Chart
Operations Core Support
User ScienceSupport
Data Management
DivisionMaintenance & Repair
of NA software deliverables; software development for new operational modes
Archive Operations
Postdocs& students
Professional Development
Advanced User Support
Science Development
Division
NA ALMAEPO
Chilean Affairs
Technical Division
Maintenance & Repair of NA hardware
deliverables; hardware
development for new mm/submm capabilities
NAASC Head Office
ANASAC
NRAO Directors
Office
NA ARC Manager
= ARC Core support
= MR&D support
= Enhanced services
NAASC Org. Chart
“Beyond Core”
NAASC ARC Functions
End to end proposal submission, review coordination, scheduling preparation, cookbooks, quality assurance, NA mirror archive
User friendly web-based access
Helpdesk based problem resolution
North America software maintenance and development
Offline system, scheduler, ACS, M&C
North America hardware maintenance and development
Band 3 & 6 Receivers, LO system, DTS system
NAASC “Beyond ARC” Functions Advanced data reduction user support
Hands-on user support
Make full power of ALMA user friendly at all levels of experience
Education and Public Outreach
Student Pre-doc and Post-doctoral Fellowship programs
Summer schools and science workshops
1st NAASC workshop: “From Z-Machines to ALMA” Jan. 13-14 2006
Next NAASC workshop: “ALMA Workshop on Disks in Star Formation” June 22-24 2007
Calibrator and spectral line databases,
Advocate for PI grants program (i.e. like Chandra, HST, Spitzer)
Strong Decadal panel support
The ALMA North American Science Advisory Committee to review NAASC Ops Plan at Sept 29-30
f2f meetingChair: Jonathan Williams, U. Hawaii (2008) Andrew Baker, Rutgers U. (2008) John Bally, U. Colorado (2008) Andrew Blain, Caltech (2007) Crystal Brogan, NRAO (2008) Chris Carilli, NRAO (2009) Todd Clancy, SSI (2009) Xiaohui Fan, U. Arizona (2007) Terry Herter, Cornell (2009) Paul Ho, CfA / ASIAA (2008) Kelsey Johnson, U. Virginia (2009) Doug Johnstone, NRC/HIA Canada (2007) Lee Mundy, U. Maryland (2007) Jean Turner, UCLA (2007) Alycia Weinberger, OCIW-DTM (2009) Christine Wilson, McMaster U. (2007) Mel Wright, U.C.-Berkeley (2008) Red=ASAC member
The European ARCThe European ARC
Paola Andreani
European Southern Observatory
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
the ALMA ARCsthe ALMA ARCs(as in the original OP)
• Core functionsScientific support services
– Proposal & observation preparation user support
– Basic data analysis– ALMA Archive operations: host
copy, data package delivery– OSF AoD shifts
• DMO based - ESO role
• Additional functionsExtended archive & data reduction
support– f2f help– Advanced pipeline– Archival research projects
Support for special projectsScience community development - basic training, schools, workshops ARC nodes
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
ESOGermany
ARC EUROPEARC EUROPE
Joint ALMA ObIRAM (+Spain)
Italy
Netherlands
Nordic Node (Onsala)
UK
ARC Manager
Additional functions
Core functions
USD: Proposal handling
DFO: Data support
TD: Archive Ops
ALMA BOARD
European ALMA Project Scientist
+ Portugal, Switzerland
Required ARC tasks Required ARC tasks (core functions)(core functions)
- Participating in software pre-release tests - Commissioning (as a means of pre-AoD training)
• PST submission support (Phase I support)• Phase II support - helpdesk - SB verification• Offline & data reduction help-desk support• Documentation (End-user doc + web content)
• Astronomer on Duty• Coordination meetings between ARCs, JAO• Science Verification• TAC Support (technical feasibility assessment)
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
Pre-Ops
Full Ops
ARC Milestones:PST, ObsTool, Pipeline, Offline software testing 2006-2010AoD duties start with CSV: 2008.4ARC keeps copy of CSV data (2008.4)Early Decision pt: 2009Feb20 (CfP)Early Science Ops: 2010.1ARC Mirror Archive follows SCO Archive/Pipeline 2011.3
EU ARC NA ARC EA ARC
Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2010.2Archive Tech3 - NA/RSM/2010.3Archive Tech4 - NA/RSM/2010.3
Database Managr1 - NA/RSM/2010.1
ARC Head OfficeARC Manager - NA/RSM/2005.3AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2006.3ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4ARC Astronomer4 - NA/RSM/2010.2ARC Astronomer5 - NA/RSM/2010.2ARC Astronomer6 - NA/RSM/2011.1
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2009.2ARC Scientist4 - NA/RSM/2010.2Web Developer - NA/RSM/2009.4
Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2010.2Archive Tech3 - NA/RSM/2010.2Archive Tech4 - NA/RSM/2010.3
Database Managr1 - NA/RSM/2010.1
ARC Head Office ARC Manager - NA/RSM/2006.4
AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2007.1ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4ARC Astronomer4 - NA/RSM/2010.2
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2010.2
Web Developer - NA/RSM/2009.4
ARC Head OfficeARC Manager - NA/RSM/2006.2AdminAsst1 - NA/RSM/2008.1
User Science Support
Archive Ops
ARC Astronomer1 - NA/RSM/2007.1ARC Astronomer2 - NA/RSM/2008.2ARC Astronomer3 - NA/RSM/2008.4
ARC Astronomer4 - NA/RSM/20010.2ARC Astronomer5 - NA/RSM/2010.2 ARC Astronomer6 - NA/RSM/2011.1
ARC Scientist1 - NA/RSM/2007.3ARC Scientist2 - NA/RSM/2008.4ARC Scientist3 - NA/RSM/2009.2ARC Scientist4 - NA/RSM/2010.2Web Developer - NA/RSM/2009.4
Archive Tech1 - NA/RSM/2009.1Archive Tech2 - NA/RSM/2010.2Archive Tech3 - NA/RSM/2010.3Archive Tech4 - NA/RSM/2010.3
Database Managr1 - NA/RSM/2010.1
ALMA Operations: ALMA Operations: ALMA Regional CentersALMA Regional CentersFull OperationsFull Operations
Required ARC tasks Required ARC tasks (additional functions)(additional functions)
(ARC nodes)(ARC nodes)
- Participating in offline software tests - Commissioning?
• Face to face help for Phase I and II
• Offline & data reduction face-to-face support• Advanced data reduction• Training of students, schools
• Science Verification?
• Special Projects
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
Pre-Ops
Full Ops
ARC nodes:staff and expertise
• Bonn-Cologne-Bochum (F.Bertoldi) 2scientists, 1PhD, 1 SW, 2postdoc
expertise: Advanced Data analysis (MAGIX), pipeline heuristics (calibration,data capture)funding: application: 9 fte + training programs
IRAM (F. Gueth) 3SW Eng, 3 postdoc
expertise: calibration, phase correction, polarimetry, imaging simulator, SMA configurations, schoolsfunding: mm-interferometry expertise center in Grenoble approved by IRAM council + Spain
• Italy (J. Brand) office space at INAF-IRA (Bologna) + 6staff(25%) + 2+1postdoc (advertised)
expertise: data handling (GRID techniques), surveys+mosaicing
funding: 1sys adm, 1SW Eng, 10postdoc
• UK (T. Muxlow), building in construction (Manchester)
expertise: data analysis, archive, data reduction heuristics, proposal prep.
funding: intent submit’d to PPARC, 11ftes
• Nordic node (J. Conway) 4staff(25%) (Onsala)
expertise: remote reduction, GRID computing, multi-freq synthesis, phase modeling, self-cal,deconvolutionfunding: 2SW Eng, 2postdoc, proposal due in Apr 07
• Netherlands M. Hogerheijde) (Leiden)expertise: high-freq, wide field, imaging,data analysis tools
funding: 2 astronomer, 2SW Eng, 2postdoc, NOVA budget + ?
• Portugal + Switzerland (J.M.Afonso, M.Steinacher)
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
ARC node f2f meetingon Aug 9th
• Role of the ARC nodes
Build a community
CASA/AIPS++ testing
Commissioning phase
f2f help
data reduction (advanced)
• Funding of the ARCs
• Training for students
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
A model for theA model for theEuropean ARCEuropean ARC
• ARC Coordinating Committee (ACC)
• Clear definition of roles: MoUs?
• A network built on decentralized teams
• splitting responsibilities, sharing expertise and
cooperating in a synchronized effort:
hotline among ARClets
ARC Web page + WIKI page to report SW testing
ARC Astronomer assigned with individual
proposal according to her/his experience
• Interaction with other ARCs
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
The development ofThe development ofARC nodesARC nodes
present statuspresent status
• Every node is asking their national agencies
for funds• Some nodes have/had post-doc positions advertised,
specific for ARC support.• EU funds possible through FP7• Visit of the ARC nodes, regular f2f
meetings at ESO
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
Synergies among Synergies among EU/NA/EA ARCsEU/NA/EA ARCs
ASAC meeting Firenze 9/15/06ASAC meeting Firenze 9/15/06
•Cookbooks and user manuals•Exchange expertises with meetings and visits•Exchange experiences in SW testing•Sharing the archive (?)