Africa Down Under Conference
September 2014
Disclaimer
This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes only. The
presentation is not and should not be considered as an offer or invitation to subscribe for or purchase any securities in
BGS, or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for
securities in BGS will be entered into on the basis of this presentation. This presentation may contain certain forward-
looking statements which have not been based solely on historical facts but rather on BGS’s current expectations about
future events and a number of assumptions which are subject to significant uncertainties and contingencies many of which
are outside the control of BGS and its directors, officers and advisers. Due care and attention has been taken in the
preparation of this presentation. However, the information contained in this presentation (other than as specifically stated)
has not been independently verified for BGS or its directors and officers, nor has it been audited. Accordingly, the
company does not warrant or represent that the information contained in this presentation is accurate or complete. To the
fullest extent permitted by law, no liability, however arising, will be accepted by BGS or it’s directors, officers or advisers,
for the fairness, accuracy or completeness of the information contained in the presentation.
Forward Looking Statements
Statements regarding plans with respect to the Company’s mineral properties are forward looking statements. There can
be no assurance that the Company’s plans for development of its mineral properties will proceed as expected. There can
be no assurance that the Company will be able to confirm the presence of mineral deposits, that any mineralisation will
prove to be economic or that a mine will successfully be developed on any of the Company’s mineral properties
Competent Persons Statement
The information in this report that relates to exploration results is based on information compiled by or under the
supervision of Kevin Anthony Joyce. Mr Joyce is Managing Director of Birimian Gold and a Member of the Australian
Institute of Geoscientists. Mr Joyce has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and the activity he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results. Mr Joyce consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
Previous Reported Results
There is information in this presentation that relates to previously reported Exploration Results. The Company confirms that
it is not aware of any new information or data that materially affects the information included in the original market
announcement, and that all material assumptions and technical parameters have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
1 www.birimiangold.com
2 www.birimiangold.com
An Emerging Gold Explorer in
West Africa
Near term focus on defining additional gold resources for potential
development at the Massigui Gold Project , Mali.
Highly prospective ground holding surrounding the world class Morila
Gold Mine.
Maiden Gold discovery at Ntiola Deposit.
Aggressive Exploration program ongoing .
Opportunity to discover and consolidate multiple shallow gold
sources within trucking distance of an existing mill and processing
facility.
Aiming to realise self-funded exploration from short term gold
production to develop additional growth opportunities.
Broaden the search for a large “company-maker” gold deposit .
Corporate Overview
Shares on Issue 824.8m
Options* 26.0m
Market Cap (@ 1.2c) $9.9m
Cash $2.0m
Enterprise Value $7.9m
Significant Shareholders
Sprott Global
Resource Investments 14%
Directors 3%
Birimian Gold Limited
(ASX: BGS)
Board Winton Willesee – Non -Executive Chairman
Finance - Extensive corporate
experience
Kevin Joyce – Managing Director
Geologist – 19 years experience
Hugh Bresser – Non Executive Director
Geologist - 22 years experience
*Options: 6M ex. $0.012 and Oct 2015
20M ex. $0.031 and April 2016
12 Month Share Price History
Share
Price (
$A
) V
olu
me
3 www.birimiangold.com
Aggressive Gold Explorer in West
Africa
Targeting multi-million ounce
gold deposits in Mali and
Liberia.
> 2100km2 highly prospective
landholding.
Extensive management
experience in the region.
In-country teams ready for
deployment to the Company’s
priority projects.
Implementing aggressive
exploration programs.
“Continually identifying, evaluating and acquiring
projects to add to the portfolio of quality assets”
4 www.birimiangold.com
Mali 3rd Largest Gold Producer in Africa
Mali hosts a number of world
class gold mines, including:
Morila (7Moz);
Syama (7Moz);
Sadiola (13Moz); and
Papillion/Fekola (5Moz)
Excellent track record for
facilitating and permitting
gold mine developments.
BGS has a 1140km2 ground
holding in Mali.
Two Projects - 13 exploration
permits in southern Mali. BIRIMIAN GOLD’S SOUTHERN MALI GOLD PROJECTS
5 www.birimiangold.com
Gold Discovery at Ntiola Deposit
Adjacent to the operating Morila
Gold Mine (> 6Moz mined).
Large (674 km2) land holding.
Predominantly held 100% by BGS.
Majority of prospective host rocks
under BGS tenure.
Excellent potential for high grade,
large tonnage, free milling gold
mineralisation.
Multiple gold prospects under
evaluation.
Highly Prospective Land Holding
Massigui Gold Project - Mali
6 www.birimiangold.com
7 www.birimiangold.com
Massigui Gold Project - Mali
Existing Infrastructure
The Massigui Project area surrounds the 4Mtpa Morila Gold Plant.
Morila is a world class gold mine with maturing production.
Mill feed exhausted in 2015 – Plant to be reconfigured to reprocess tailings.
Morila Ownership – 40% Randgold (operator), 40% AngloGold and 20%
Republic of Mali.
Exploration Data Access Agreement with Randgold (March 2013).
Memorandum of Understanding for Toll Treatment with Morila SA
(June 2013).
Ntiola Deposit
Birimian Gold Discovery
Located 25km from the Morila Plant.
Potential for low-cost open pit mine and
haul road style development.
Robust, well defined, shallow gold zone.
Positive preliminary metallurgy. Highly
amenable to CIL processing.
Positive social and environmental studies
along potential haul road route.
Next phase evaluation work to include –
Infill drilling to define JORC-
compliant resource.
Advanced metallurgy studies.
Formal Environmental & Social
Impact Assessment.
8 www.birimiangold.com
Ntiola Deposit
9 www.birimiangold.com
Ntiola Prospect selected drill results at October 2013 (>1 g/t gold cut-off)
Drill defined over 500m of strike and to
150m vertical depth.
Gold recoveries of up to 98.4%.
High proportion of gravity recoverable gold
(up to 64.2%).
Section 1313550N
> 25,000 m of drilling completed in 18
months to June 2014.
Committed to defining new gold resources
via exploration.
Systematic ongoing program of prospect
generation and drill testing of priority
targets.
674 km2 project-wide sampling program
has identified multiple new target zones.
Extensive auger drilling campaigns have
delineated new high potential targets for
drill testing.
Scout AC drilling returning ore grade
intersections.
10 www.birimiangold.com
New Discovery Potential
Massigui Project. ASIG Magnetic Image. Advanced prospects/resources shown
in yellow. Other prospects are shown as black triangles.
Initial focus on expanded exploration
program in the Ntiola District.
Additional resources will have a significant
positive impact on development potential
at Ntiola Deposit.
Recent drilling shows excellent scope to
aggregate multiple new gold sources.
Early success at Viper, Koting, Koble and
Koura Prospects.
Viper Prospect - Significant new shallow
intercepts in broad spaced scout drilling,
including:
15m @ 3.45 g/t Au from 4m
16m @ 2.23 g/t Au from 17m
10m @ 2.54 g/t Au from 14m
4m @ 6.27 g/t Au from 41m
8m @ 1.60g/t Au from 29m Ntiola District. Prospects are shown in black outline over arsenic in soil image
11 www.birimiangold.com
New Discovery Potential
12 www.birimiangold.com
Robust Exploration Model
Highly prospective ground holding surrounding the world class Morila
Gold Mine.
Established and effective exploration method delivering strong results.
Gold discovery at Ntiola
Aggressive Exploration program to deliver new resources.
Sound Economic Model
Opportunity to aggregate multiple shallow, open-pit, gold sources within
trucking distance of existing underutilised mill.
Potential for rapid and low capital development.
Economic model contemplates modest resource target size - achievable
& lower risk.
Massigui Gold Project - Summary
High potential early stage
exploration project.
Multiple gold targets on 15km
long large-scale gold trend.
Extensive artisanal gold
workings.
100% interest in 1,000km2
license.
In close proximity to
Hummingbird Resources -
Dugbe Project (4.2Moz).
First ever modern exploration
work commenced by BGS.
Artisanal workings
at Basawa
Basawa Gold Project - Liberia
Simplified geology with gold occurrences (yellow) and gold projects (labelled).
13 www.birimiangold.com
Basawa Gold Project (cont.)
14 www.birimiangold.com
Extensive artisanal gold
workings.
Multiple prospect areas.
High priority targets defined in
auger sampling at Before Camp
and Newtown.
New high potential target zone
delineated at Bafa Creek.
Trenching to define drill targets.
Anticipate drill testing priority
targets 1st Qtr 2015.
New Gold Targets on
Large-scale 15km long
Bafawehn Gold Trend
Bafawehn Gold Trend
Basawa Gold Project (cont.)
15 www.birimiangold.com
High potential targets areas at Before Camp, Newtown and Bafa Creek.
Extensive artisanal alluvial mining field. Primary gold source yet to be defined.
Detailed auger sampling has delineated high tenor zones. Results up to 4.3 g/t Au.
Drill target definition to commence during upcoming field season.
Summary
Massigui Gold Project, Mali
Quality ground holding in world class gold district.
Potential cash flow from mine development at Ntiola.
New target generation yielding additional highly prospective drill targets.
Aggressive exploration program currently underway.
Excellent scope for further discoveries.
Drilling to re-commence October 2014
Basawa Gold Project, Liberia
New gold trend defined in an area with no previous modern gold exploration.
Extensive artisanal mining activity.
Developing targets for drill testing.
16 www.birimiangold.com
Contacts
Kevin Joyce
Managing Director
+61 8 9226 1356
info@birimiangold.com
ASX:BGS
www.birimiangold.com
17 www.birimiangold.com
Before Camp
Newtown
Artisanal
Workings
Bafa Creek
Recommended