ADDENDUM No. 3 Renovation of 7th Floor Restrooms (SBR)

Warehouse MSA Project No. 20-040

Date Issued: December 30, 2019

This Addendum is hereby made a part of the Contract Documents dated December 6, 2019, on the subject work as though originally included therein. The following amendments, additions, and/or corrections shall govern this work. This form should be acknowledged below and submitted with the Bids.

This Addendum incorporates the following items: 1. The new tile color is Elite Gray (HM05). Please note that this tile is a 24” x 24”

tile rather than the previous 18” x 18” size ADD: Revised Specifications-SECTION -93013 CERAMIC TILING,

dated December 30, 2019.

Issued by:

Maryland Stadium Authority 333 W. Camden Street, Suite 500 Baltimore, MD 21201 Sandra Fox, Procurement Officer

Company _________________________ Acknowledgment Date (Name and Title)

Page 2 of 11 Maryland Stadium Authority

Page 3 of 11 Maryland Stadium Authority

Page 4 of 11 Maryland Stadium Authority

Page 5 of 11 Maryland Stadium Authority

Page 6 of 11 Maryland Stadium Authority

Page 7 of 11 Maryland Stadium Authority

Page 8 of 11 Maryland Stadium Authority

Page 9 of 11 Maryland Stadium Authority

Page 10 of 11 Maryland Stadium Authority

Page 11 of 11 Maryland Stadium Authority