OSes: 7. CPU Scheduling 1
Operating Systems
Objectivesexamine and compare some of the
common CPU scheduling algorithms
Certificate Program in Software DevelopmentCSE-TC and CSIM, AITSeptember -- November, 2003
7. CPU Scheduling(Ch. 5, S&G)
ch 6 in the 6th ed.
8/14/2019 7. Scheduling.ppt
2/42
OSes: 7. CPU Scheduling 2
Contents
1. CPU Scheduling
what it is, burst cycles, criteria
2. Scheduling Algorithms
FCFS, SJF, Priority, RR, multilevel
3. Algorithm Evaluationdeterministic, queueing, simulation
8/14/2019 7. Scheduling.ppt
3/42
OSes: 7. CPU Scheduling 3
1. CPU Scheduling
One of the main aims of an OS is to
maximise the utilization of the CPU by
switching it between processeswhen should the switching occur?
which processes should be executed next?
8/14/2019 7. Scheduling.ppt
4/42
OSes: 7. CPU Scheduling 4
1.1. What is a Process? Fig. 4.1, p.90
terminated
ready
waiting
running
new
exit
I/O eventor wait
dispatch
interrupt
event
completed
8/14/2019 7. Scheduling.ppt
5/42
OSes: 7. CPU Scheduling 5
1.2. Scheduling Opportunities
When the running process yields the CPU:
the process enters a wait state
the process terminates
When an interrupt occurs:
the current process is still ready
process switches from wait state to ready
Preemptive vs. non-preemptive scheduling
8/14/2019 7. Scheduling.ppt
6/42
OSes: 7. CPU Scheduling 6
1.3. CPU and I/O Burst Cycle
:
load
store
add
storeread from file
wait for I/O
store
increment index
write to file
wait for I/O
load
store
:
CPU burst
I/O burst
CPU burst
I/O burst
CPU burst
Fig. 5.1, p.124
8/14/2019 7. Scheduling.ppt
7/42OSes: 7. CPU Scheduling 7
CPU Burst Duration (ms)
Fig. 5.2, p.125;VUW CS 305
02
48
1624
3240
frequency
020
40
60
80
100
120
140
160
8/14/2019 7. Scheduling.ppt
8/42OSes: 7. CPU Scheduling 8
1.4. Scheduling Criteria
CPU utilization
keep the CPU as busy as possible
Throughput
no. of processes completed per time unit
Turnaround time
how long it takes to complete a process
continued
8/14/2019 7. Scheduling.ppt
9/42OSes: 7. CPU Scheduling 9
Waiting time
the total time a process is in the ready queue
the measure used in chapter 5
Response time
time a process takes to start responding
8/14/2019 7. Scheduling.ppt
10/42OSes: 7. CPU Scheduling 10
2. Scheduling Algorithms
2.1. First-Come, First-Served (FCFS)
2.2. Shortest Job First (SJF)
2.3. Priority Scheduling
2.4. Round Robin (RR)
2.5. Multilevel Queue Scheduling
2.6. Multilevel Feedback Queue Scheduling
8/14/2019 7. Scheduling.ppt
11/42OSes: 7. CPU Scheduling 11
2.1. FCFS Scheduling
When the CPU is available, assign it to the
process at the start of the ready queue.
Simple to implement
use a FIFO queue
Non-preemptive
8/14/2019 7. Scheduling.ppt
12/42
8/14/2019 7. Scheduling.ppt
13/42
OSes: 7. CPU Scheduling 13
Example (v.2)
Process Burst Time
P2 3
P3 3P1 24
Gantt Chart:
Average waiting time:
(6 + 0 + 3)/3 = 3 ms
P1P2 P3
0 3 6 30
8/14/2019 7. Scheduling.ppt
14/42
OSes: 7. CPU Scheduling 14
FCFS Features
May not give the best average waiting time.
Average times can vary a lot depending onthe order of the processes.
Convoy effectsmall processes can get stuck behind a big
process
8/14/2019 7. Scheduling.ppt
15/42
OSes: 7. CPU Scheduling 15
2.2. Shortest Job First Scheduling (SJF)
When the CPU is available, assign it to the
process with the smallest next CPU burst
duration
better name is shortest next CPU burst
Can be preemptive or non-preemptive
8/14/2019 7. Scheduling.ppt
16/42
OSes: 7. CPU Scheduling 16
Non-preemptive Example
Process Burst Time
P1 6
P2 8
P3 7P4 3
Gantt Chart:
Average waiting time:
(3 + 16 + 9 + 0)/4 = 7 ms
FCFS gives 10.25 ms
p.131
P2P4 P1
0 3 9 24
P3
16
8/14/2019 7. Scheduling.ppt
17/42
OSes: 7. CPU Scheduling 17
SJF Features
Provably optimal
gives the minimum average waiting time
Problem: it is usually impossible to know
the next CPU burst duration for a process
solution: guess (predict)
8/14/2019 7. Scheduling.ppt
18/42
OSes: 7. CPU Scheduling 18
Predicting the next CPU burst time
Use the formula:
Tn+1= w tn+ (1- w) Tn
Meaning:Tn+1= prediction for the next (n+1
th) CPU burst
duration
tn= known duration of current (nth) CPU burst
Tn= previous prediction (based on the sequence
of old titimes)
w = a weight (0
8/14/2019 7. Scheduling.ppt
19/42
OSes: 7. CPU Scheduling 19
Preemptive SJF
When a new process arrives, ifit has a
shorter next CPU burst duration than what
is left of the currently executing processthenpreempt the current process.
8/14/2019 7. Scheduling.ppt
20/42
OSes: 7. CPU Scheduling 20
Example
Process Arrival Time Burst Time
P1 0 8
P2 1 4
P3 2 9P4 3 5
Gantt Chart:
p.133
P1P1 P2
0 1 5 26
P4
10
P3
17
continued
8/14/2019 7. Scheduling.ppt
21/42
OSes: 7. CPU Scheduling 21
Average waiting time:
( (10-1) + (1-1) + (17-2) + (5-3) )/4
= 6.5 ms
Non-preemptive SJF gives 7.75 ms
start time arrival time
8/14/2019 7. Scheduling.ppt
22/42
OSes: 7. CPU Scheduling 22
2.3. Priority Scheduling
Associate a priority with each process and
the CPU is allocated to the process with the
highest priority.
FCFS, SJF are special cases.
Low numbers = high priority.
8/14/2019 7. Scheduling.ppt
23/42
OSes: 7. CPU Scheduling 23
Example
Process Burst Time Priority
P1 10 3
P2 1 1
P3 2 3P4 1 4
P5 5 2
Gantt Chart:
Average waiting time: 8.2 ms
p.134
P3P2 P5
0 1 6 19
P1
16
P4
18
8/14/2019 7. Scheduling.ppt
24/42
OSes: 7. CPU Scheduling 24
Features
Internal/external priorities.
Preemptive or non-preemptive.
How to avoid starvation?
aging
8/14/2019 7. Scheduling.ppt
25/42
OSes: 7. CPU Scheduling 25
2.4. Round Robin Scheduling (RR)
A small unit of time (a time quantum, a time
slice) is defined
typically 10 - 100 ms
The ready queue is treated as a circular queue.
The CPU scheduler goes around the queue
giving each process one time quantum
preemptive
8/14/2019 7. Scheduling.ppt
26/42
OSes: 7. CPU Scheduling 26
Example
Time quantum = 4 ms. At time 0.
Process Burst Time
P1 24
P2 3
P3 3
Gantt Chart:
Average waiting time: 17/3 = 5.67 ms
p.135
P1P1 P20 4 7 30
P1
22
P1
2610 14 18
P3 P1 P1
8/14/2019 7. Scheduling.ppt
27/42
OSes: 7. CPU Scheduling 27
RR Features
Average waiting time can be quite long.
Context switching is an important overhead
when the time quantum is small.
continued
8/14/2019 7. Scheduling.ppt
28/42
OSes: 7. CPU Scheduling 28
Average turnaround time of a set ofprocesses does not necessarily improve as
the time quantum size increase:
Fig. 5.5, p.137
9.5
10
10.5
11
11.5
12
12.5
1 2 3 4 5 6 7
Process Time
P1 6
P2 3
P3 1P4 7
Time Quantum
Average
Turnar
oundTime
8/14/2019 7. Scheduling.ppt
29/42
OSes: 7. CPU Scheduling 29
2.5. Multilevel Queue SchedulingFig. 5.6, p.138
system processes
interactive processes
interactive editing processes
batch processes
student processes
highest priority
lowest prioritycontinued
8/14/2019 7. Scheduling.ppt
30/42
OSes: 7. CPU Scheduling 30
Scheduling between queues:
fixed priority preemptive scheduling
varying time slices between the queues
8/14/2019 7. Scheduling.ppt
31/42
OSes: 7. CPU Scheduling 31
2.6. Multilevel Feedback Queue Scheduling
Allow a process to
move between queues
priority sinks whenquantum exceeded
greater discrimination
against longer jobs
better response for
shorter jobs
Q0
Q1> Q0
Q2> Q1
FCFS
Fig. 5.7, p.140;VUW CS 305
8/14/2019 7. Scheduling.ppt
32/42
OSes: 7. CPU Scheduling 32
3. Algorithm Evaluation
3.1. Deterministic Modelling
3.2. Queueing Models
3.3. Simulation
8/14/2019 7. Scheduling.ppt
33/42
OSes: 7. CPU Scheduling 33
Common Issues
Model/simulation is based on some pattern
of use of a real machine
e.g. students use of bazooka: lots ofinteractive, small jobs, and a few large ones
How to represent the changesin usage:changes in problems, programs, users
8/14/2019 7. Scheduling.ppt
34/42
OSes: 7. CPU Scheduling 34
3.1. Deterministic Modelling
Take a given workload and calculate the
performance of each scheduling algorithm:FCFS, SJF, and RR (quantum = 10 ms)
8/14/2019 7. Scheduling.ppt
35/42
OSes: 7. CPU Scheduling 35
Example
At time 0.
Process Burst Time
P1 10
P2 29
P3 3
P4 7
P5 12
p.145
continued
8/14/2019 7. Scheduling.ppt
36/42
OSes: 7. CPU Scheduling 36
Gantt Charts and Times
1. FCFS:
Average waiting time:
(0 + 10 + 39 + 42 + 49)/5= 28 ms
P1 P2
0 10 39 61
P5
42 49
P3 P4
continued
8/14/2019 7. Scheduling.ppt
37/42
OSes: 7. CPU Scheduling 37
2. Non-preemptive SJF:
Average waiting time:
(10 + 32 + 0 + 3 + 20)/5
= 13 ms
continued
P3 P4
0 3 10 61
P2
20 32
P1 P5
8/14/2019 7. Scheduling.ppt
38/42
OSes: 7. CPU Scheduling 38
3. RR:
Average waiting time:
(0 + 32 + 20 + 23 + 40)/5
= 23 ms
P1 P2
0 10 20 23 30
P3 P4
50 52
P2 P5
61
P2P5
40
8/14/2019 7. Scheduling.ppt
39/42
OSes: 7. CPU Scheduling 39
Results
For this mix of processes and CPU burst
durations:
SJF 13 ms
RR 23 ms
FCFS 28 ms
8/14/2019 7. Scheduling.ppt
40/42
8/14/2019 7. Scheduling.ppt
41/42
OSes: 7. CPU Scheduling 41
3.2. Queueing Models
Usually the process mix varies greatly in an
OS, but it may still be possible to determine
statistical distributions for the CPU and I/Obursts.
The mathematics is difficult, and onlyapplies to limited cases.
8/14/2019 7. Scheduling.ppt
42/42
3.3. Simulations
Often driven by random number generators
to model CPU burst durations, process
arrival, departure, etc.
Trace tapes
records of actual events in a real system, whichcan be used to drive simulations
Recommended