420 Outrage - Album Sample

Preview:

DESCRIPTION

 

Citation preview

Molding

Caption will go here.

420 OUTRAGE PHOTO ALBUM

on the purchase of your new Boston Whaler 420 Outrage!

And welcome to the next chapter in your boating story, filled with the many incredible experiences a 420 Outrage makes possible.

This album will provide a window into the early, middle and final stages of your boat’s development, documenting its progress through the manufacturing and testing processes. We’ll be sharing regular updates with new photos in place each time, so be sure to flip through to see the very latest.

We’re so glad to have you as part of the Boston Whaler family. Wishing you all the best in your adventures ahead!

Sincerely,

The Boston Whaler team

Congratulations

Chapter 1M O L D I N G

Molding

It all starts with a strong foundation...

Witness the birth of your 420’s hull.

Molding

Molding

The hull is inverted to allow for lamination.

A period of “rest” inside the mold allows laminate to set.

Molding

Molding

Et voila! The mold has been separated from the hull.

Rough edges have yet to be smoothed, but your hull already glows.

Molding

Molding

Now entering the trim and grind process...

Chapter 2T R I M & G R I N D

Trim & Grind

Technicians remove any excess lamination.

Every inch gets a thorough polish.

Trim & Grind

Chapter 3PA R T S I N T E G R AT I O N

Preparing your 420 to accept the many parts and options you’ve selected.

Parts Integration

Parts Integration

Holes are added with pinpoint precision to accommodate wiring.

Your hardtop also gets a thorough buffing and is prepared to receive accessories.

Parts Integration

Chapter 4S TAT I O N 1 A S S E M B LY

Heading into Assembly, the base of the cockpit has come together nicely.

Station 1 Assembly

Station 1 Assembly

In Station 1, components including the bilge, battery stations, fuel tanks, lighting and generators are added.

Chapter 5S TAT I O N 2 A S S E M B LY

Station 2 Assembly

Make way for the dive door!

The European Summer Kitchen installation in progress.

Station 2 Assembly

Station 2 Assembly

By Stage 2 Assembly, your 420 is ready for its helm console and electrical panels.

Work continues on the cabin...

Station 2 Assembly

Recommended