2015-2020 Transportation Improvement Program
June 16, 2014
TABLE OF CONTENTS
Table of Contents………………………………………………... 1
Adopting Resolution…………………………………………….. 2
Program Overview………………………………………………. 5
Letter from the Director……………………………………….… 6
Policies…………………………………………………………....8
Title VI Policy Statement………………………………………..10
Financial Analysis……………………………………………… 11
TIP Changes Last Year to This Year…………………………... 21
Business License Surcharge Projects Update………………...... 23
Six Year Project Lists………………………………………….. 24
Project Detail Sheets………………………………………….... 28
Arterial Map Updates..……………………………………..…..103
Glossary……………………………………………………..….106
1
2
3
4
TRANSPORTATION IMPROVEMENT PROGRAM OVERVIEW The City of Vancouver 2015 – 2020 Transportation Improvement Program (TIP) is an
update of the City’s 2014 - 2019 TIP. The TIP is the programming document for transportation improvements over a six-year period. The State of Washington law (RCW 35.77.010) requires the City to prepare a TIP annually that is consistent with and implements the city’s adopted comprehensive growth management plan. The TIP identifies capital transportation system improvement projects and includes a policy to work with affected property owners to preserve railroad right-of-way in the event a railroad ceases to operate.
A City of Vancouver Arterial Street System and Classification Map which designates
roadways functionally classified as Arterials pursuant to VMC 11.70.010 and VMC 9.02.040 is adopted and attached hereto.
For information about the City’s Comprehensive Plan, contact Vancouver Planning at 360-
487-7950. For questions or more information about specific transportation projects, please contact Vancouver Public Works at 360-487-7130, or visit the City’s website:
www.cityofvancouver.us
5
P.O. Box 1995 • Vancouver, WA 98668-1995 • www.cityofvancouver.us
_____________________________________________________________________________
2015-2020 Transportation Improvement Program (TIP) Letter from the Public Works Director
Vancouver’s 2015-2020 Six-Year Transportation Improvement Program (TIP) continues the City’s focus on core services and systems vital to our community’s quality of life and economic well-being. State law requires that the City annually adopt a TIP that includes transportation capital improvement projects. This year’s TIP again provides a comprehensive view of the successes of the past year and the challenges ahead by listing projects identified as important to keeping residents and businesses moving efficiently and effectively throughout our community, even those projects where funding has not yet been identified.
The City is currently working on several key transportation projects. These projects include Northeast 18th Street between Four Seasons Lane and 138th Avenue (right-of-way only); East Mill Plain Boulevard from 104th Avenue to Chkalov Drive; Northeast First Street between 164th and 192nd avenues (design and right-of-way only); Northeast 137th Avenue between 49th Street and Fourth Plain Boulevard (design only); and various sidewalk, traffic and pedestrian signal improvements. The City recently completed Northeast 137th/138th Avenue improvements between 28th and 49th streets, as well as the Waterfront Access Project Phase II. In addition, the City continues to expand on its collaborative partnership with the independent, citizen-led Neighborhood Traffic Safety Alliance through the ongoing Neighborhood Traffic Management Program, which utilizes the limited funding available on solutions championed by neighborhoods.
Vancouver’s citizens have made a significant investment in our community’s street system infrastructure, with an estimated replacement value of more than $1 billion. Council’s commitment to providing resources for Vancouver’s most costly street asset – pavement – reflects our determination to preserve this investment as our top priority. Current resources are prioritized to our arterial network first, as they receive the most traffic, followed by our neighborhood streets. In addition, some county roads annexed in the 1980s and 1990s are inadequate for today’s more urban population and require costly urban upgrades and/or pavement reconstruction. The City’s program to reconstruct streets that either failed or were not built to sustain current traffic loads has minimal funding. Unfortunately, resources have been insufficient to maintain our network pavement condition index (PCI), and we have seen a consistent decline in our PCI values over time. Upcoming discussions will continue to deal with pavement needs in our community.
-continued-
6
We continue to refine how we operate and maintain what we have. Through our multi-year asset management initiative, we are taking a close look at our current transportation system assets; assessing current conditions; determining future maintenance, rehabilitation or replacement needs; estimating future costs; and managing those costs. The planned technology upgrade from Hansen 7 to Hansen 8, anticipated to be complete by the end of 2014, will be an important step in this process.
Looking forward, there is uncertainty as to the one-time or ongoing resources that might be available for future work. This uncertainty is reflected in the small number of capital projects programmed beyond 2015. The City recently completed a comprehensive street program review, which will support Council’s goal to develop a transportation funding policy and long-term strategy. Recommendations for the strategy are anticipated later this year, and the strategy will provide a pathway for developing projects beyond 2015.
Our future, in part, depends upon our ability to invest in public infrastructure in a way that both facilitates new private development and preserves our neighborhoods. We will continue to seek out innovations and opportunities to ensure the strong foundation our community needs to thrive.
Brian K. Carlson, P.E. Director of Vancouver Public Works
7
TRANSPORTATION POLICIES (Vancouver Comprehensive Plan 2011)
1. TRANSPORTATION SYSTEM: Develop and maintain an interconnected and overlapping transportation system grid of pedestrian
walkways, bicycle facilities, roadways for automobiles and freight, transit service, and high capacity transit service. Include support programs such as traffic operations, transportation demand management, neighborhood traffic management, and the regional trails program. Work towards completing and sustaining individual components and programs to ensure success of the entire system.
2. SYSTEM BALANCE: Allocate resources to balance transportation choices. Promote development of a broader range of transportation
options including pedestrian, bike, and transit systems, rather than focusing all resources on satisfying peak commuting demand with roadway capacity alone.
3. TRANSPORTATION SAFETY: Ensure high safety standards for motorists, pedestrians, and bicyclists through the development and
capital improvement processes. Allocate city capital resources to high risk and collision location for motorists, bicyclists, and pedestrians.
4. TRANSPORATION FINANCE: Develop recurring and dedicated funding for a complete transportation program, including system
operation and maintenance. Leverage local funding with innovative and aggressive finance strategies including partnerships, grant development, efficient debt, and fee-based funding sources.
5. TRANSPORATION CIRCULATION AND SYSTEM CONNECTIVITY: Develop a transportation grid that provides good
connections to surrounding land uses and activity centers and allows for multiple circulation routes to/from each location. Close gaps and complete system connections through the development and capital improvement processes.
6. LAND USE AND TRANSPORTATION INTEGRATION: Develop and implement innovative transportation investment, design, and
program incentives to achieve the urban environment envisioned in the Comprehensive Plan. 7. LIVABLE STREETS: Design streets and sidewalks and manage vehicular traffic to encourage livability, interaction, and sense of
neighborhood or district ownership in linkage with adjacent land uses. Encourage multi-modal travel, and provide accessible, human scale opportunities for transferring between travel modes.
8. TRANSPORTATION ACCESSIBILITY: Build an accessible transportation system focused on inter-model connectivity and removing
barriers to personal physical mobility. 9. TRANSPORTATION SYSTEM EFFICIENCY: Invest in and improve efficiency of the transportation system with multi-modal design,
advanced traffic management and operations technology, demand management strategies and high-frequency transit service. 10. NEIGHBORHOOD TRAFFIC: Protect and enhance neighborhoods with an active program that focuses on safety, safe routes to
school, traffic calming, education, and enforcement. 11. TRANSPORATION REGIONAL AND METROPOLITAN COORDINATION: Coordinate Vancouver’s transportation plans, policies,
and programs with those of other jurisdictions serving the greater Metropolitan area to ensure a seamless transportation system. Focus particularly on cooperation with the Southwest Washington Regional Transportation Council, Washington State Department of Transportation, Clark County and C-TRAN.
12. ECONOMIC DEVELOPMENT: In order to support the continued economic vitality of Vancouver, major transportation system
investments should facilitate freight mobility, job creation, regional competitive position, and revenue growth. 13. VEHICILE MILES TRAVELED: Use transportation and land use measures to maintain or reduce single occupant motor vehicle miles
traveled per capita to increase system efficiency and lower overall environmental impacts. 14. STREET DESIGN: Design city streets to achieve safety and accessibility for all modes. Arterial streets shall provide facilities for
automobile, bike, pedestrian and transit mobility, and shall include landscaping and adequate lighting. 15. PARKING STANDARDS: Adopt coordinated parking standards which maintain neighborhood integrity, promote the use of a multi-
modal transportation system, encourage desired economic development and growth throughout the entire urban area, and which economize the use of urban land by reducing the need for any excess provision of surface parking.
8
CAPITAL PLANNING AND ASSET MANAGEMENT FINANCIAL POLICIES (Adopted 5-7-2012) 31. Asset management best practice involves managing the performance, risk and expenditures on infrastructure assets in an optimal
and sustainable manner throughout their lifecycle covering planning, design, construction, operation, maintenance, and disposal. The City shall integrate the principles and best practices of Asset Management such as those embodied in the International Infrastructure Management Manual in the management of its assets.
32. Asset Inventory will be maintained with maintenance, repair and deferred maintenance costs identified and updated on an annual
basis. 33. Maintenance of city assets shall be addressed on a current need, rather than deferred into the future. 36. Funding for capital projects, including major facilities maintenance projects, will be allocated in a manner that balances
community needs with City priorities, the potential for attracting matching funds, and the ability to reduce or limit expenses in future years.
37. The City’s objective is to incorporate a “Pay-As-You-Go” approach (using available cash and current resources) in the Capital
Improvement program. 38. The Capital Budget will be adopted at the same time the City Operating Budget is adopted. The Capital budget will only include
fully funded projects. The Capital Budget will only contain projects identified in the Capital Improvement Program. 39. A capital repair appropriation will be maintained for unanticipated major repairs of general operating facilities and for
emergency replacement of general fund equipment. Additions to the capital repair contingency reserve will be made based on Council directions.
40. Impacts on net annual operating and maintenance costs will be identified as part of the funding considerations for new capital
projects such as buildings, parks and street enhancements. This includes identifying potential reductions in maintenance costs if improvements are funded. The necessary funds to operate the capital facility will be identified at the time the capital budget is adopted.
ASSET MANAGEMENT COMPREHENSIVE PLAN POLICY (Adopted 12-16-2013)
1. City public facility assets shall be systematically managed to balance full life cycle costs, performance, risk, and service levels, using
best management practices and data.
9
10
2015-2020 Transportation Improvement Program
Financial Analysis
11
The funding sources listed below are those typically used for transportation capital investments and pavement maintenance within the City of Vancouver. Revenue varies from year to year. The current City budget calls for most transportation capital revenue after 2011 to be used to retire bond debt incurred to build transportation infrastructure over the last decade or so, including such projects as 18th Street, 137th Avenue, 164th Avenue, 28th Street/Burton Road, Fruit Valley Road, 192nd Avenue, and others. As a result, the City’s transportation capital program will enter a period of significant slowdown for several years as the City pays off debt for previously completed capital projects. As local funding goes to retire debt, external revenue sources like grants and traffic impact fees are less available to the City for improvements. Local Funding: State Gas Tax: About $3.2 million per year. REET: Real estate excise tax, $1 million/year, depending on real estate transactions. Bonds (debt): Periodically the City sells bonds for transportation construction projects. Revenues to pay those debts come from several sources including gas tax, general fund, REET, and business license surcharge. Other Local Transportation Funds: Business License Fee = $50/employee generates around $2.2 million annually to pay bond debt. Developer Contribution: Direct Construction: Private developers are required to build or improve on-site roadways and may also be required to make off-site improvements to comply with concurrency or SEPA impacts. Traffic Impact Fees (TIF): The City maintains a TIF program (fees paid by a developer per new trip) which historically covers about 10% of the annual construction program. Proportionate Share Contributions: Developer contributions toward an improvement project to meet concurrency or safety requirements. Federal Grant Programs: STP-TMA: Surface Transportation Program Transportation Management Area funds are allocated by the SW Washington Regional Transportation Council and then, through a competitive grant process, to urban jurisdictions in Clark County. CMAQ: Congestion Mitigation and Air Quality Program funds are administered like STP-TMA funds. CDBG: Community Development Block Grant—periodically available for small neighborhood improvements. State Grant Programs: Transportation Improvement Board (TIB): Funded with a small portion of the state gas tax, TIB is the main source for state grant funds to urban areas. Vancouver competes with other jurisdictions in western Washington for funds from several TIB grant programs. The state has several other smaller grant programs run by various agencies that fund smaller, targeted safety, pedestrian, and bicycle projects. The graphs on the next few pages show the historical and forecasted revenues and expenses for streets in the City of Vancouver. Work is currently underway to refine revenue forecasts consistent with work being performed to review long-term transportation funding options.
12
Transportation Financial Data
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
STREET MAINTENANCE
ExpensesStreet Maintenance Fund 102
Pavement Management 3,689,283 2,516,952 3,535,182 4,716,758 3,805,029 4,349,882 3,650,173 2,935,568 5,521,405 5,631,248 5,942,740
Signs and Striping 861,143 858,811 999,003 958,721 935,199 1,051,468 876,281 880,863 974,625 1,219,456 1,257,580
Signals 896,221 980,889 1,031,767 1,040,078 919,313 1,349,708 909,444 821,940 1,125,277 917,800 1,145,852
Street Lights 1,206,445 1,155,316 1,169,164 1,311,566 1,361,565 1,242,909 1,476,108 1,569,659 1,594,820 1,695,242 1,775,652
Street Maintenance 441,884 442,443 439,151 461,416 356,965 659,886 775,861 734,933 610,040 714,832 559,316
Administration 3,698,214 3,743,218 4,029,496 4,363,813 4,932,282 4,573,342 3,594,185 3,433,860 2,510,676 2,419,916 2,693,072
Street Sweeping 196,777 179,587 221,637 230,314 183,503 346,118 707,249 546,345
Traffic Engineering 447,719 488,101 522,239
Total Street Maintenance Fund 102 Expenses 10,989,967 9,877,216 11,425,400 13,082,666 12,493,856 13,573,313 11,989,301 10,923,168 12,784,562 13,086,595 13,896,451
Transportation Debt Service paid by Fund 102 119,277 226,457 226,457 226,457 652,580 635,535 279,722 639,102 634,303
Transfers to Fund 330 Transportation Capital 720,000 191,409 125,535 1,424,009 952,440 1,304,270 2,449,167 2,507
Fund 102 Street Maintenance Cash Outflows 10,989,967 9,877,216 11,544,677 14,029,123 12,911,722 13,925,305 14,065,890 12,511,143 14,368,554 16,174,864 14,533,261
RevenuesStreet Maintenance Fund 102
Property Taxes 145,361 444,218 46,242 18,462 21,025 103,416
REET 2 2,182,426 2,788,342 3,494,130 3,660,703 3,296,097 1,771,348 1,482,032 1,259,689 1,373,945 1,310,417 2,177,228
Motor Vehicle Fuel Tax 1,953,422 2,119,003 2,185,119 3,661,169 3,861,972 3,595,593 3,589,027 3,547,722 3,371,269 3,316,528 3,380,195
Transfer from the General Fund 6,286,998 5,643,500 6,150,342 2,700,104 5,532,106 5,874,552 8,073,813 8,317,368 8,837,796 9,364,098 9,822,342
Transfer from the 2006 Bond Fund 1,000,000 300,000
Transfer from the Surface Water 300,000 176,151 204,753 823,526
Miscellaneous 406,438 843,402 735,620 563,011 1,436,093 1,137,354 668,520 678,482 1,059,314 1,003,895 670,513
Total Street Maintenance Fund 102 Revenues 10,829,284 11,394,247 12,565,211 11,730,348 14,870,486 12,901,240 14,036,607 14,647,812 14,642,324 14,994,938 16,153,694
TRANSPORTATION DEBT
ExpensesYearly Debt Service 2,901,098 2,886,765 2,733,765 2,587,080 3,197,494 3,602,767 4,085,020 4,044,493 4,221,205 5,142,388 5,144,299
RevenuesDebt Service Revenues
General Fund 2,229,331 2,225,951 2,074,968 1,928,588 1,987,838 1,998,755 1,993,677 1,460,343 1,721,103 2,053,276 2,062,167
Employee Surcharge ‐ ‐ ‐ ‐ 828,244 943,250 1,438,762 1,948,615 1,942,513 1,945,481 1,944,661
Motor Vehicle Fuel Tax 671,767 660,814 658,797 658,492 381,413 660,762 652,580 635,535 279,722 639,102 634,303
REET 277,867 504,530 503,168
Total Debt Service Revenues 2,901,098 2,886,765 2,733,765 2,587,080 3,197,494 3,602,767 4,085,020 4,044,493 4,221,205 5,142,388 5,144,299
TRANSPORTATION ENGINEERING
ExpensesTransportation Engineering
Administration 943,652 927,808 923,346 1,106,711 1,181,262 1,168,008 1,144,366 1,037,542 366,917 53,371 38,932
Commuter trip Reduction 42,508 145,949 228,350 260,804 370,148 248,486
Street Design 257,581 245,153 273,265 306,280 545,602 389,804 367,365 502,755 616,271 417,185 365,461
Traffic Engineering 361,400 322,137 287,832 374,258 564,263 485,347 466,805 481,603
Neighborhood Traffic Management 184,138 189,033 205,755 199,680 129,116 161,674
Transportation Planning 253,168 265,935 337,670 400,610 413,980 436,402 787,451 419,304 41,842 15,327 26,845
Concurrency 235,408 204,653 249,899 253,268 185,002 236,240 194,844 113,161
Development Review 231,987 317,109 468,050 485,926 442,219 394,481 251,850 135,884 215,077 202,836 228,112
Transfers to Fund 330 35,000 75,415
Totals Transportation Engineering 2,467,334 2,471,828 2,788,325 3,272,682 3,689,794 3,567,760 3,582,829 3,014,150 1,240,107 688,719 659,350
RevenuesTransportation Engineering
General Fund 2,467,334 2,471,828 2,788,325 3,272,682 3,689,794 3,567,760 3,582,829 3,014,150 1,240,107 688,719 659,350
TRANSPORTATION CAPITAL
ExpensesFund 330 Transportation Capital
Capital Expenses 13,549,816 23,966,415 27,011,556 19,290,317 24,508,291 15,868,620 8,784,884 14,736,472 17,782,275 16,259,786 18,241,260
RevenuesFund 330
REET 500,000 513,000 526,338 465,182 88,922 75,581 82,437 78,916 130,429
Grants 6,567,300 12,256,842 14,822,248 9,828,815 10,255,076 7,633,141 5,934,236 6,313,201 9,298,306 4,451,602 5,559,068
Developer Participation 557,344 2,465,104 450,331 1,797,218 2,056,326 2,860,197 73,513 300,188 353,724 24,302 ‐
Intergovernmental Loan Proceeds 990,000 1,100,000 110,000 3,840,000 77,000 6,000 1,496,000
Transfer from Fund 001 General Fund 5,021 24,020 118,163 1,270,187 553,767 588,696 411,833 582,261 300,000 67,963 265,934 Transfer from Fund 102 Street Maintenance 720,000 191,409 125,535 1,424,009 952,440 1,304,270 2,449,167 22,730
Transfer from Fund 130 Arterial Street Fund 1,977,211 1,153,809 210,317
Transfer from Fund 131 Transportation Special Revenue 1,563,735 2,171,472 1,626,251 1,006,929 387,654 839,140 126,639 74,251
Transfer from Fund TIF Funds 2,229,014 3,726,842 3,082,703 920,641 1,365,547 700,752 622,642 1,254,091 394,929 1,532,710 1,736,997
Transfer from Bond Capital Fund ‐ ‐ ‐ ‐ 7,425,444 3,052,680 1,322,697 1,008,956 3,573,771 6,749,195 7,052,756
Miscellaneous Revenue 968,032 379,942 1,020,509 1,177,844 962,769 1,174,153 212,870 1,701,624 314,485 380,502 815,752
Total Fund 330 Revenue 10,326,711 20,829,961 21,147,763 18,991,757 26,608,148 18,226,587 11,207,651 16,415,996 16,538,062 15,866,996 17,153,917
1 of 1 2015‐2020 Transportation Improvement Program13
Operationsand Maintenance
21%
PavementManagement
16%
Capital Expenses
50%
Debt Service13%
2013 Streets Expenses$37.9 Million
OperatingExpenses
50%
14
General Fund33%
REET7%
Motor Vehicle Fuel Tax
9%
Grants15%
Special Revenue5%
TIF Funds5%
Bond Capital Fund22%
Miscellaneous Revenue4%
2013 Streets Revenue$39.1 Million
15
Operations and Maintenance
Pavement Preservation
Debt Service
Capital Expenses
‐
5
10
15
20
25
30
35
40
452002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Dollars
(Millions)
Year
Streets Expenses
ProgrammedActual
16
TIF/Developer ContributionBonds
Grants
Miscellaneous Revenue*
‐
5
10
15
20
25
30
35
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Dollars (Millions)
Year
Streets Capital Revenues
Actual Forecasted
???
Note: The comprehensive street funding work recently completed will help guide discussions in 2014 for future revenue forecasts.
17
REET
Motor Vehicle Fuel Tax
General Fund
Miscellaneous
‐
5
10
15
20
252002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Dollars (Millions)
Year
Street Operations, Pavement Preservation, and Debt Service Revenues
Actual Forecasted
18
REET
Employee Surcharge
Gas Tax
General Fund
Total Debt Service
0.0
1.0
2.0
3.0
4.0
5.0
6.0
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Dollars(M
illions)
Year
Streets Debt Service Revenues
Actual Forecasted
?
19
2015-2020 Transportation Improvement Program
Six Year Project List
20
City of Vancouver 6‐Year Transportation Improvement Program (2015‐2020) Hearing date June 16, 2014
This page provides an overview of the changes from the previous 6 year project list (2014‐2019) to this year's 6 year project list (2015‐2020). The changes are segmented by: projects removed; projects added; and other changes.
Projects Removed: TIP ID: Project Type: Comments:
Main St CDBG – 6th to Evergreen TRANS‐831 Multimodal Project did not receive grant.
Projects Added: TIP ID: Project Type: Comments:
Funded Project List
E Mill Plain @ Garrison Signal Improvement Project
TRANS‐837 Traffic Project moved from unfunded list to funded list. Locally funded.
Columbia Way – Columbia St to Grant St
TRANS‐715 Capacity Project moved from unfunded list to funded list. New TIB grant received.
SE McGillivray Blvd. @ SE 166th Ave TRANS‐746 Traffic Carry forward into 2014 & 2015.
Partially Funded Project List
SE 136th Ave @ SE 7th St TRANS‐363 Traffic Project already designed. Actively seeking funding for construction phase.
Evergreen Hwy Trail – Image to Chelsea
TRANS‐740 Multimodal Project moved from unfunded list to partially funded list. New grant received for design only.
Jefferson St – W Evergreen to W Mill Plain Blvd
TRANS‐531 Capacity Project moved from unfunded list to partially funded list.
Unfunded Project List
East Evergreen Highway Reconstruction Project
TRANS‐838 Other Needed improvement along Evergreen Hwy from Chelsea to 164th.
Columbia Shores Blvd @ Columbia Way
TRANS‐680 Capacity Added to unfunded list. Needed freight mobility improvement
Hearthwood @ SE 1st St TRANS‐724 Traffic Added to unfunded list. Future intersection improvement.
Other Changes: TIP ID: Project Type: Comments:
Funded Project List
NE 162nd Ave – Poplar to Fourth Plain Blvd – Fiber Communications
TRANS‐737 Traffic Carry forward money into 2014.
E Mill Plain Blvd. @ SE 157th Ave and Mill Plain west of Andresen
TRANS‐739 Traffic Carry forward money into 2014.
Flashing Yellow Arrow Upgrade Project
TRANS‐A‐828
Traffic Carry forward money into 2014.
East Mill Plain Signal Optimization Traffic Carry forward money into 2014.
Endeavour Elementary Pathway and Safety Improvement Program
TRANS‐824 Multimodal Carry forward money into 2014.
Columbia St/97th St/St Helens/Mcloughlin Sharrows
TRANS‐734 Multimodal Carry forward money into 2014.
18th St – Four Seasons Ln to NE 138th Ave
TRANS‐703 Capacity Carry forward money into 2015.
NE Vancouver Mall Dr. – NE Andresen Rd. to NE 66th Ave
TRANS‐555 Capacity Carry forward money into 2015. 100% TIF funded (Orchards TIF district).
E Mill Plain Blvd. – 104th Ave to TRANS‐678 Capacity Carry d forward money into 2015.
21
City of Vancouver 6‐Year Transportation Improvement Program (2015‐2020) Hearing date June 16, 2014
Chkalov
Fourth Plain Infill Sidewalk TRANS‐832 Multimodal Carry forward money into 2015.
Columbia St/Main St VAST 6th to 45th TRANS‐721 Traffic Carry forward money into 2015.
Destination Downtown TDM TRANS‐DT‐451
Multimodal Carry forward money into 2015.
Partially Funded Project List
Evergreen Hwy Trail – Ellsworth Rd to Weber Arboretum
TRANS‐337 Multimodal Carry forward money into 2015.
NE 18th St – Four Seasons Lane to NE 138th Ave
TRANS‐703 Capacity Carry forward money into 2015.
SE 137th Ave. – NE 49th St to NE Fourth Plain Blvd
TRANS‐275 Capacity Carry forward money into 2015.
SE 1st St. – SE 164th Ave to SE 192nd Ave
TRANS‐268 Capacity Carry forward money into 2015.
Unfunded Project List
None
Other: Project Type: Comments:
Non‐City Projects Added
None
Non‐City Projects Removed
NE 20th Street Extension Capacity Completed by City of Camas
Columbia River Crossing Capacity Funding removed by State
22
Project StatusE Mill Plain Blvd. & 104th Ave. Intersection CompletedEsther & 4th Street Lowering & Realignment Completed
NE 49th Street – 112th Ave. to 122nd Ave. CompletedNE Fourth Plain Blvd. at 65th/66th Ave. Completed
NE Thurston Rd. at Parkway & Van Mall Dr. CompletedMill Plain Blvd. & 136th Ave. Intersection Completed
Main Street Reconstruction Design Only Completed design
NE 138th Avenue – 28th St. to 49th St. Completed
NE 18th Street – I-205 to Four Seasons CompletedSE 164th Intersection Improvements Completed
NE 18th Street – Four Seasons to 136th Ave Right-of-way partially completed
Council Approved Business License Surcharge Capital Projects - Status
2015‐2020 City of Vancouver Transportation Improvement Program23
Note: All costs are in 2014 dollars. 2014 shown for reference only (6-year plan is for 2015-2020).
2014 2015 2016 2017 2018 2019 2020
R
A
N
K
Project ID Project Name Project Type PhaseSpent to Date
(3‐31‐14)Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local
Cost to
CompleteProject Total TIF Area/Eligibility
FUNDED PROJECTSCapacity
TRANS‐555 NE Vancouver Mall Dr. ‐ NE Andresen Rd. to NE 66th Ave Capacity PSE $112,763 $100,000 $100,000 $212,763 Orchards
ROW $229,605 $400,000 $400,000 $629,605CN $0 $1,317,632 $1,317,632 $1,317,632
Total $342,368 Project Total By Year => $500,000 Project Total By Year => $1,317,632 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,817,632 $2,160,000
TRANS‐678 E Mill Plain Blvd. ‐ 104th Ave to Chkalov Capacity PSE $113,593 $400,000 $25,000 $425,000 $538,593 East City
ROW $0 $900,000 $25,000 $200,000 $75,000 $1,200,000 $1,200,000CN $0 $2,700,000 $75,000 $2,775,000 $2,775,000
Total $113,593 Project Total By Year => $1,350,000 Project Total By Year => $3,050,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $4,400,000 $4,513,593
TRANS‐726 NE 45th St ‐ NE 72nd Ave to NE 77th Ave Capacity PSE $107,578 $50,000 $50,000 $157,578 South Orchards
ROW $136,511 $0 $136,511CN $0 $1,050,000 $1,050,000 $1,050,000
Total $244,088 Project Total By Year => $1,100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,100,000 $1,344,088
TRANS‐727 NE 82nd Ave ‐ NE 51st St to NE 54th St Capacity PSE $77,669 $50,000 $50,000 $127,669 South Orchards
ROW $1,954 $0 $1,954CN $0 $550,000 $550,000 $550,000
Total $79,623 Project Total By Year => $600,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $600,000 $679,623
TRANS‐748 Downtown Waterfront Access Project Capacity PSE $0 $0 $0 Vancouver
(approximately $13 million will be spent in 2012 ROW $0 $0 $0not shown here) CN $36,468,250 $164,150 $199,000 $134,000 $497,150 $36,965,400
Total $36,468,250 Project Total By Year => $497,150 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $497,150 $36,965,400
TRANS‐715 Columbia Way ‐ Columbia St to Grant St Capacity PSE $7,338 $50,000 $50,000 $57,338 Vancouver
(funded by developer and grants) ROW $190 $0 $190CN $0 $2,283,500 $519,800 $2,283,500 $519,800 $5,606,600 $5,606,600
Total $7,528 Project Total By Year => $2,853,300 Project Total By Year => $2,803,300 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $5,656,600 $5,664,128
Traffic
TRANS‐830 Fourth Plain Crosswalk Upgrades to Hybrid Beacons Traffic PSE $13,484 $0 $13,484 South Orchards
ROW $0 $0 $0CN $109,410 $250,000 $250,000 $359,410
Total $122,895 Project Total By Year => $250,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $250,000 $372,895
TRANS‐ 721 Columbia St./Main St. VAST 6th to 45th Traffic PSE $1,022 $0 $1,022 South Orchards
ROW $0 $0 $0CN $0 $75,000 $25,000 $350,000 $50,000 $500,000 $500,000
Total $1,022 Project Total By Year => $100,000 Project Total By Year => $400,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $500,000 $501,022
TRANS‐837 E Mill Plain @ Garrison Signal Improvement Project Traffic PSE $0 $50,000 $50,000 $50,000 South Orchards
ROW $0 $0 $0CN $0 $325,000 $325,000 $325,000
Total $0 Project Total By Year => $375,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $375,000 $375,000
TRANS‐746 SE McGillivray Blvd. @ SE 166th Ave Traffic PSE $0 $25,000 $25,000 $25,000 South Orchards
ROW $0 $0 $0CN $0 $275,000 $275,000 $275,000
Total $0 Project Total By Year => $300,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $300,000 $300,000
TRANS‐737
NE 162nd Ave ‐ Poplar to Fourth Plain Blvd ‐ Fiber
Communications Traffic PSE $18,210 $10,000 $10,000 $28,210 South Orchards
ROW $0 $0 $0CN $0 $300,000 $40,000 $340,000 $340,000
Total $18,210 Project Total By Year => $350,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $350,000 $368,210
TRANS‐739 E Mill Plain Blvd. @ SE 157th Ave and Mill Plain west of Andresen Traffic PSE $29,978 $0 $29,978 South Orchards
(Hawk signals) ROW $3,514 $0 $3,514CN $9,391 $425,000 $25,000 $450,000 $459,391
Total $42,883 Project Total By Year => $450,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $450,000 $492,883
TRANS‐A‐828 Flashing Yellow Arrow Upgrade Project Traffic PSE $22,041 $0 $22,041 South Orchards
ROW $0 $0 $0CN $0 $400,000 $25,000 $425,000 $425,000
Total $22,041 Project Total By Year => $425,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $425,000 $447,041
East Mill Plain Signal Optimization Traffic PSE $38,750 $0 $38,750 South Orchards
ROW $0 $0 $0CN $0 $20,000 $40,000 $60,000 $60,000
Total $38,750 Project Total By Year => $60,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $60,000 $98,750
Multimodal
TRANS‐ 829 Columbia St. CDBG ‐ 33rd to 39th CDBG PSE $22,356 $0 $22,356 East City
ROW $0 $0 $0CN $0 $300,000 $300,000 $300,000
Total $22,356 Project Total By Year => $300,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $300,000 $322,356
TRANS‐832 Fourth Plain Subarea Sidewalk Infill Enhancement PSE $25,039 $50,000 $50,000 $75,039 East City
ROW $0 $300,000 $50,000 $350,000 $350,000CN $0 $550,000 $50,000 $600,000 $600,000
Total $25,039 Project Total By Year => $400,000 Project Total By Year => $600,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,000,000 $1,025,039
TRANS‐DT‐451 Downtown Vancouver TMA Multimodal PSE $0 $0 $0 East City
ROW $0 $0 $0CN $0 $150,000 $21,214 $50,000 $10,000 $231,214 $231,214
Total $0 Project Total By Year => $171,214 Project Total By Year => $60,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $231,214 $231,214
Ongoing
TRANS‐A‐237 Traffic Signal Sustainability Ongoing PSE $0 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $175,000 $175,000
ROW $0 $0 $0CN $0 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $875,000 $875,000
Total $0 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 $1,050,000 $1,050,000
TRANS‐A‐241 Pavement Preservation Program Ongoing PSE $0 $308,100 $316,419 $324,962 $333,736 $342,747 $352,001 $352,001 $2,329,966 $2,329,966
ROW $0 $0 $0CN $0 $6,162,000 $6,328,374 $6,499,240 $6,674,720 $6,854,937 $7,040,020 $7,040,020 $46,599,311 $46,599,311
Total $0 Project Total By Year => $6,470,100 Project Total By Year => $6,644,793 Project Total By Year => $6,824,202 Project Total By Year => $7,008,456 Project Total By Year => $7,197,684 Project Total By Year => $7,392,021 Project Total By Year => $7,392,021 $48,929,277 $48,929,277
TRANS‐A‐245 Bridge Management Program Ongoing PSE $0 $0 $0
ROW $0 $0 $0CN $0 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $70,000 $70,000
Total $0 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 $70,000 $70,000
TRANS‐A‐738 Traffic Safety & Livability ‐ Citywide Ongoing PSE $0 $10,000 $10,000 $10,000
ROW $0 $0 $0CN $0 $55,000 $55,000 $55,000
Total $0 Project Total By Year => $65,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $65,000 $65,000
TRANS‐A‐240 Neighborhood Traffic Management Program Ongoing PSE $0 $0 $0
ROW $0 $0 $0CN $0 $120,000 $120,000 $120,000 $360,000 $360,000
Total $0 Project Total By Year => $120,000 Project Total By Year => $120,000 Project Total By Year => $120,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $360,000 $360,000
2014 2015 2016 2017 2018 2019 2020 TIP 2015‐2020 Totals
Annual Totals GrantTIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grants TIF/Dev. Dollars Bonds
by Funding Source $6,027,650 $2,794,800 $199,000 $7,875,314 $6,133,500 $1,837,432 $0 $7,184,793 $0 $0 $0 $7,104,202 $0 $0 $0 $7,168,456 $0 $0 $0 $7,357,684 $0 $0 $0 $7,552,021 $0 $0 $0 $7,552,021 $12,161,150 $4,632,232 $199,000
Annual Totals PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN Other Local
by Phase $1,153,100 $1,675,000 $14,068,664 $341,419 $275,000 $14,539,306 $349,962 $0 $6,754,240 $358,736 $0 $6,809,720 $367,747 $0 $6,989,937 $377,001 $0 $7,175,020 $377,001 $0 $7,175,020 Project Costs Grand Total $51,794,491
Annual Totals $16,896,764 $15,155,725 $7,104,202 $7,168,456 $7,357,684 $7,552,021 $7,552,021 $106,335,519
Non‐City
18th Street @ I‐205 Interchange (2014 construction) WSDOT
Fourth Plain BRT (funding uncertain) C‐Tran
West Vancouver Freight Access (under construction) Port of Vancouver
6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)
PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐2020
24
Note: All costs are in 2014 dollars. 2014 shown for reference only (6-year plan is for 2015-2020).
2014 2015 2016 2017 2018 2019 2020
R
A
N
K
Project ID Project Name Project Type PhaseSpent to Date
(3‐31‐14)Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local
Cost to
CompleteProject Total TIF Area/Eligibility
PARTIALLY FUNDED PROJECTSCapacity
TRANS‐268 SE 1st St ‐ SE 164th Ave to SE 192nd Ave Capacity PSE $280,770 $650,000 $50,000 $700,000 $980,770 East City
(PSE & ROW only partially funded, no CN funding ROW $1,743 $1,000,000 $50,000 $1,050,000 $1,051,743see project detail sheet for more information) CN $0 $0 $0
Total $282,514 Project Total By Year => $700,000 Project Total By Year => $1,050,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,750,000 $2,032,514
TRANS‐275 NE 137th Ave ‐ NE 49th St to NE Fourth Plain Blvd Capacity PSE $99,236 $700,000 $50,000 $700,000 $50,000 $1,500,000 $1,599,236 Evergreen
(PSE funded, no ROW or CN funding ROW $0 $0 $0see project detail sheet for more information) CN $0 $0 $0
Total $99,236 Project Total By Year => $750,000 Project Total By Year => $750,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,500,000 $1,599,236
TRANS‐703 NE 18th St ‐ Four Seasons Lane to NE 138th Ave Capacity PSE $0 $0 $0 Evergreen &
(ROW phase funded, construction partially funded) ROW $231,523 $2,000,000 $250,000 $700,000 $50,000 $3,000,000 $3,231,523 East CityCN $0 $3,000,000 $2,720,000 $2,280,000 $8,000,000 $8,000,000
Total $231,523 Project Total By Year => $2,250,000 Project Total By Year => $750,000 Project Total By Year => $8,000,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $11,000,000 $11,231,523
TRANS‐531 Jefferson St ‐ W Evergreen to W Mill Plain Blvd Capacity PSE $0 $100,000 $100,000 $100,000 Evergreen &
(Design partially funded) ROW $0 $0 $0 East CityCN $0 $0 $0
Total $0 Project Total By Year => $100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $100,000 $100,000
Traffic
TRANS‐363 SE 136th Ave @ SE 7th St Traffic PSE $38,628 $0 $38,628 Vancouver
(Design funded only) ROW $0 $0 $0CN $0 $0 $0
Total $38,628 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $0 $38,628
Multimodal
TRANS‐337 Evergreen Hwy Trail ‐ Multimodal PSE $184,073 $0 $184,073 Vancouver
Ellsworth Rd to Weber Arboretum ROW $7,016 $100,000 $25,000 $125,000 $132,016(See detail sheet for more information) CN $0 $650,000 $25,000 $675,000 $675,000
Total $191,089 Project Total By Year => $125,000 Project Total By Year => $675,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $800,000 $991,089
TRANS‐740 Evergreen Hwy Trail ‐ Multimodal PSE $0 $100,000 $100,000 $100,000 Vancouver
Image to Chelsea ROW $0 $0 $0(Design funded only) CN $0 $0 $0
Total $0 Project Total By Year => $100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $100,000 $100,000
TRANS‐833 Vancouver Waterfront Trail Multimodal PSE $0 $0 $0 Vancouver
(see detail sheet for more information) ROW $0 $0 $0CN $0 $750,000 $750,000 $750,000
Total $0 Project Total By Year => $750,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $750,000 $750,000
Other
TRANS‐DT‐822 Downtown Quiet Zone Other PSE $15,307 $0 $15,307 Vancouver
(See detail sheet for more information) ROW $0 $0 $0CN $0 $85,000 $85,000 $85,000
Total $15,307 Project Total By Year => $85,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $85,000 $100,307
2014 2015 2016 2017 2018 2019 2020 TIP 2015‐2020 Totals
Annual Totals GrantTIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grant
TIF/Dev.
DollarsBonds Other Local Grants TIF/Dev. Dollars Bonds
by Funding Source $4,300,000 $350,000 $0 $210,000 $3,050,000 $100,000 $0 $75,000 $3,000,000 $2,720,000 $2,280,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,350,000 $3,170,000 $2,280,000
Annual Totals PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN Other Local
by Phase $1,650,000 $2,375,000 $835,000 $750,000 $1,800,000 $675,000 $0 $0 $8,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Costs Grand Total $285,000
Annual Totals $4,860,000 $3,225,000 $8,000,000 $0 $0 $0 $0 $16,943,296
6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)
PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐202025
2015 2016 2017 2018 2019 2020
R
A
N
K
Project ID Project Name Project Type PhaseSpent to Date
(3‐30‐14)
See Detail Sheets for
Project CostsTIF Area/Eligibility
UNFUNDED PROJECTSCapacity
TRANS‐274 NE 28th St ‐ NE 142nd Ave to NE 162nd Ave. Capacity PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐279 NE 49th St ‐ NE 122nd Ave to NE 137th Ave Capacity PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐281 NE 18th St ‐ NE 87th Ave to NE 97th Ave Capacity PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐349 NE 18th St ‐ NE 164th Ave to NE 192nd Ave Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐444 NE 18th St ‐ NE 142nd Ave to NE 162nd Ave Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐527 NE 18th St ‐ NE 97th Ave to NE 107th Avenue Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐536 Fruit Valley Rd ‐ 61st St to NW 78th St Capacity PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐583 NE 87th Ave / Lieser Rd. Realignment Capacity PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐607 NE 192nd Ave ‐ SE 1st St. to NE 18th St. Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐712 NE 59th St ‐ NE 147th Ave to NE 162nd Ave Capacity PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐713 NE 147th Ave ‐ NE 59th St to NE Fourth Plain Blvd Capacity PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐716 NE 9th St ‐ NE 172nd Ave to NE 192nd Ave Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐717 NE 182nd Ave ‐ SE 1st St to NE 18th St Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐718 NE 162nd Ave ‐ SE 1st St to NE 9th St Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐719 NE 112th Ave ‐ E Mill Plain Blvd. to NE 15th St Pedestrian PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐729 E Mill Plain Blvd ‐ SE 172nd Ave to SE 192nd Ave Capacity PSE $0 East City
(see detail sheet for more information) ROW $0CN $0
Total $0 No FundingTRANS‐816 NW 32nd Ave ‐ SR501 to Whitney Capacity PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐825 NE 54th St ‐ 15th Avenue to St. James Street Capacity PSE $0 Hazel Dell
ROW $0CN $0
Total $0 No FundingTRANS‐826 NE 104th Avenue ‐ Mill Plain Blvd. to 14th Street Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐827 NE 104th Avenue ‐ 14th Street to 18th Street Capacity PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐834 NE 9th St. ‐ Broadway to "C" Capacity PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐680 Columbia Shores Blvd @ Columbia Way Capacity PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTraffic
TRANS‐603 Leiser Rd @ MacArthur St. Intersection Traffic PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐720 136th/137th Ave ‐ E Mill Plain Blvd to E 28th st Traffic PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐722 St Johns Blvd. @ NE 68th St Traffic PSE $0 Hazel Dell
ROW $0
6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)
PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐2020
26
2015 2016 2017 2018 2019 2020
R
A
N
K
Project ID Project Name Project Type PhaseSpent to Date
(3‐30‐14)
See Detail Sheets for
Project CostsTIF Area/Eligibility
UNFUNDED PROJECTS
6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)
CN $0
Total $0 No FundingTRANS‐723 SE 20th St @ SE 176th Ave Traffic PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐725 St Johns Blvd. @ Ft Vancouver Way Traffic PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐724 Hearthwood @ SE 1st St Traffic PSE $0 East City
ROW $0CN $0
Total $0 No FundingTRANS‐818 NE Burton/28th Street ‐ NE Andresen Rd to NE 138th Ave Traffic PSE $0 Evergreen
ROW $0CN $0
Total $0 No FundingTRANS‐819 NW Fruit Valley Rd @ La Frambois Traffic PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingMultimodal
TRANS‐258 E. Fourth Plain Blvd. ‐ Ft Vancouver Way to NE Andresen Rd. Enhancement PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐495 Main St Reconstruction ‐ 5th St to 15th Street Enhancement PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐740 Evergreen Hwy Trail ‐ Image Rd. to Chelsea Ave Enhancement PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐741 Evergreen Hwy Trail ‐ Silver Springs to Se 164th Ave Enhancement PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐742 Evergreen Hwy Trail ‐ SE 164th Ave to E. city limits Enhancement PSE $0 Vancouver
ROW $0CN $0
Total $0 No Funding
TRANS‐835
Fort Vancouver Way Subarea Improvements ‐ Mcloughlin to 4th
Plain Multimodal PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingOther
TRANS‐836 Evergreen Blvd. Bridge over Blandford Safety PSE $0 Vancouver
ROW $0CN $0
Total $0 No Funding
TRANS‐837 Fruit Valley Rd. Bridge over railroad tracks near Whitney Rd. Safety PSE $0 Vancouver
ROW $0CN $0
Total $0 No FundingTRANS‐838 East Evergreen Highway Reconstruction Project Reconstruction PSE $0 East City
ROW $0CN $0
Total $0 No FundingOngoing
TRANS‐A‐238 Disabled Access (ADA) Ongoing PSE $0
ROW $0CN $0
Total $0 No FundingTRANS‐A‐239 School Crossing Protection Ongoing PSE $0
ROW $0CN $0
Total $0 No FundingTRANS‐A‐242 Bikeways Ongoing PSE $0
ROW $0CN $0
Total $0 No FundingTRANS‐A‐244 Safe Walkways Ongoing PSE $0
ROW $0CN $0
Total $0 No FundingTRANS‐A‐421 Pavement Reconstruction Program Ongoing PSE $0
ROW $0CN $0
Total $0 No Funding
PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 2 City of Vancouver Transportation Improvement Program 2015‐2020
27
2015-2020
Transportation Improvement Program
Project Detail Sheets
28
PROJECT DETAIL SHEETS OVERVIEW
The following pages consist of project detail sheets, which provide additional
information for each project listed within the City’s 6‐year Transportation
Improvement Program (TIP). A project identification number is located in the upper
right hand corner of each detail sheet. Each detail sheet includes a vicinity map for the
project, project description, project justification, estimated costs, estimated schedule,
and other pertinent information.
29
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-258
SR-500 EB
SR-500 WB
I-5
18TH
86TH
33RD
EVERGREEN
87TH
FALK
15TH
ROSS
39TH
44TH
MCLOUGHLIN
MACARTHUR
STAP
LETO
N
FORT VANCOUVER
BLAN
DFOR
D
BURTON
VANCOUVER MALL
20TH
COLUMBIA HOUSE
MILL PLAIN
FOURTH PLAIN
GRAN
D
ANDR
ESEN
SAIN
T JOH
NS
25TH
33RD
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
E. FOURTH PLAIN BLVD. - FT VANCOUVER WAY TO NE ANDRESEN RD.
Upgrade sidewalks and St lights to be consistent with the vision established in the Fourth PlainSub-Area Plan. Improvement include wider sidewalks, upgraded ornamental Street lights, andstreet trees. Total scope of project is undefined.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
History of collisions associated with driveways and pedestrians and bicyclists. Project identifiedas a priority improvement in the Fourth Plain Blvd Sub-Area Plan (2007). Project identified inthe Vancouver Comprehensive Plan (2011-2030).Based on 2012 safety report this project haspotentially high safety benefits.
TRANS-258PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: FT VANCOUVER WAY TO: NE ANDRESEN RD
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
30
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-268
15TH
172N
D13TH
FRIB
ERG-
STRU
NK
BYBEE
1ST19
2ND
164T
H
MILL PLAIN
162N
D
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SE 1ST ST - SE 164TH AVE TO SE 192ND AVE
Urban upgrade of existing 2 lane Roadway to a 3 and 5 lane principal arterial standard (oneor two lanes each direction plus turn lane). Roadway cross section varies per segment. Streetupgrades include sidewalks, bike lanes, Street lights and sound walls at required locations. PSEand ROW only partially funded. No funding for CN.
71612
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with safety and level of service deficiencies. Projectidentified as a priority improvement in the Section 30 Subarea Plan (2009). Project identifiedin the Vancouver Comprehensive Plan (2011-2030).
TRANS-268PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 164TH AVE TO: SE 192ND AVE
$16,270,000.00Total Proj. Cost:
$10,500,000.00Const. Cost:$1,470,000.00Design Cost:
Pre-Design Cost:$4,300,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
31
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-100
**SCIP-94
**SCIP-16
**SCIP-93
**SS-19
TRANS-444
TRANS-720
**SCIP-17**SCIP-230
**SCIP-84
**SCIP-99
**SCIP-90
TRANS-273
**SS-21
**WTR-1
**WTR-22
**WTR-61
**WTR-70**WTR-51**SCIP-19
TRANS-349**SS-22
TRANS-818
TRANS-703
**SCIP-207
**SCIP-89
**
**SCIP-77
**SCIP-92
**SCIP-76**SCIP-219
**SCIP-218
**SW-28
**SCIP-DR10
**SCIP-209
TRANS-274
39TH
18TH
28TH
162N
D
138T
H13
7TH
136TH Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 28TH ST - NE 142ND AVE TO NE 162ND AVE.
Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standards (one laneeach direction plus center turn lane) including sidewalks, bike lanes, Stlights and sound walls atrequired locations.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with level of service, poor pavement and safetydeficiencies. Project identified in Vancouver Comprehensive Plan (2011-2030).Based on 2012safety report this project has potentially high safety benefits.
TRANS-274PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 142ND AVE TO: NE 162ND AVE
$9,750,000.00Total Proj. Cost:
$7,250,000.00Const. Cost:$1,250,000.00Design Cost:
Pre-Design Cost:$500,000.00ROW Cost:
$750,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
32
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-275
117T
HSR
-500 E
B
162N
D
76TH
137T
H
162N
D
FOURTH PLAIN
49TH 48TH
WARD
POPLAR
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 137TH AVE - NE 49TH ST TO NE FOURTH PLAIN BLVD
Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standard (one laneeach direction with turn lane or median divider) including a new intersection at NE 59th St,sidewalks, bike lanes, St lights and sound walls where required. PSE funded. No funding forROW or CN.
71237
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).
TRANS-275PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 49TH ST TO: NE FOURTH PLAIN BLVD
$16,000,000.00Total Proj. Cost:
$10,900,000.00Const. Cost:$1,600,000.00Design Cost:
Pre-Design Cost:$3,500,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
33
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-19**SCIP-17**SCIP-207
**SS-20TRANS-275
TRANS-273
**SCIP-206
**WTR-22
**SCIP-105
**
**SCIP-183 **SCIP-184
**SCIP-103
TRANS-279
44TH
39TH
41ST
130TH
122ND
52ND129TH
136TH
121ST
45TH
51ST
47TH
140TH
131ST
126TH
139TH
123RD
56TH
128TH
141ST
53RD
50TH
46TH
127TH
54TH
55TH
138TH
40TH
42ND
49TH
125TH
133RD
119TH
43RD
118TH
142ND
135TH
132ND
124TH
134TH
57TH
120TH
48TH
125TH
40TH
142ND
47TH
42ND
46TH
42ND
49TH135
TH
52ND
141ST
138TH
45TH
56TH
51ST
47TH
124TH
135TH
128TH
53RD
139TH
50TH
42ND
45TH
118TH
131ST
141ST
132ND 47TH
50TH
52ND
138TH
43RD
50TH
126TH
129TH
40TH
43RD
127TH
138TH
135TH
123RD
123RD
51ST
46TH
40TH
138TH
43RD
128TH
141ST
40TH
141ST
46TH
133RD
131ST
135TH
39TH
49TH
137T
H
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 49TH ST - NE 122ND AVE TO NE 137TH AVE
Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standard (one laneeach direction and turn lane) including sidewalks, bike lanes, and Stlights.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).
TRANS-279PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 122ND AVE TO: NE 137TH AVE
$8,700,000.00Total Proj. Cost:
$5,250,000.00Const. Cost:$950,000.00Design Cost:
Pre-Design Cost:$2,000,000.00ROW Cost:
$500,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
34
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-68
**SCIP-11
**SW-1
**SCIP-66
TRANS-818
**SW-3
**SCIP-172
**
**SCIP-67
**SW-4
TRANS-527
**SCIP-63
TRANS-733
TRANS-826
**SCIP-9
**WTR-6
TRANS-258**SCIP-109
**SS-24 **SCIP-14
**SCIP-108
**SCIP-162
TRANS-827**SS-67**SS-29
**SS-26**SS-93
**SCIP-173
**SCIP-69
**WTR-46**WTR-63
**SCIP-15
**SCIP-167
**SCIP-170
**WTR-65
**SCIP-DR21
**SCIP-DR15
TRANS-817
**SCIP-168
TRANS-739
**SCIP-DR19
TRANS-281
86TH
97TH
87TH
18TH 98TH
BURTON
BURTON
ANDR
ESEN
MILL PLAIN
25TH
ANDR
ESEN
AUTO
MAL
L
FOURTH PLAIN
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 18TH ST - NE 87TH AVE TO NE 97TH AVE
New St construction to a minor arterial standard (one lane each direction plus turn lane) withbike lanes, St lights, sound walls, sidewalk on north side of street and shared use pathway onsouth side of street.*Environmental Assessment and alignment study completed and approved in 2004*
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New Rdway segment which provide planned east / west circulation. Project identified inVancouver Comprehensive Plan (2011-2030).
TRANS-281PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 87TH AVE TO: NE 97TH AVE
$14,200,000.00Total Proj. Cost:
$9,500,000.00Const. Cost:$1,600,000.00Design Cost:
Pre-Design Cost:$2,100,000.00ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
35
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-32**WTR-64**WTR-70
**WTR-52**WTR-16
**SCIP-179
**SCIP-50
TRANS-838
**SCIP-178
TRANS-740
**SW-16 **SCIP-42
**SCIP-176
**SCIP-18**SCIP-187
TRANS-735
**SCIP-180
**SCIP-43
**SCIP-177
**SCIP-175
**SCIP-188
TRANS-337
SR-14 EBSR-14 WB
12TH
FRENCH
19TH
23RD
104TH
95TH 14TH
97TH
101ST
13TH
18TH
MT HOOD
113TH
IMAGE
PORTER
NANCY
106TH
MAXON
88TH
96TH
16TH
MT RAINIER
HILLCREST
98TH
99TH
15TH
102ND
103RD
17TH
105TH
MT ADAMS
114TH
112TH
MT W
HITNE
Y
15TH
113TH
14TH
105TH16TH
98TH
106TH
13TH
113TH
106TH
97TH
18TH
15THEVERGREEN
ELLS
WORT
H
88TH
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
EVERGREEN HWY TRAIL - ELLSWORTH RD TO WEBER ARBORETUM
Upgrade St for 8 foot pedestrian pathway on south side of Rdway. Design will be completed forentire length, but construction is only funded from Ellsworth to approximately 100th Court.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2013*Start of Construction (Year):
Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.
TRANS-337PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: ELLSWORTH RD TO: IMAGE RD (APPROXIMATE)
$1,000,000.00Total Proj. Cost:
$690,000.00Const. Cost:$170,000.00Design Cost:
Pre-Design Cost:$140,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
36
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-349
172N
D
13TH
FRIB
ERG-
STRU
NK
18TH
162N
D
192N
D
28TH
164TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 18TH ST - NE 164TH AVE TO NE 192ND AVE
Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. *Environmental Assessment alignment studycompleted and approved in 2004*
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard urban arterial with level of service and safety deficiencies. Project identified inthe Vancouver Comprehensive Plan (2011-2030).
TRANS-349PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 164TH AVE TO: NE 192ND AVE
$18,250,000.00Total Proj. Cost:
$11,500,000.00Const. Cost:$1,750,000.00Design Cost:
Pre-Design Cost:$4,000,000.00ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
37
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-363SE 7TH ST
SE
13
5T
H C
T
SE
13
6T
H A
VE
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SE 136TH AVE @ SE 7TH ST
Installation of new traffic signal. Improvement includes upgrades to ADA ramps and Stlights. TIFProject ID SC30Street Improvement
071230
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard intersection with level of service and safety deficiencies. Project identified in theVancouver Comprehensive Plan (2011-2030). Based on 2012 safety report this project haspotentially high safety benefits.
TRANS-363PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
38
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-94
TRANS-720
**SCIP-93
**SS-19TRANS-274
**SCIP-84
**SCIP-77
**SCIP-90
TRANS-349
**
**SS-22
**SCIP-83
TRANS-818
TRANS-703
**SCIP-89
**SCIP-92
TRANS-718
TRANS-273**WTR-22
**SCIP-219
**SCIP-218
**SW-28
**SCIP-209
TRANS-44418TH
28TH
162N
D
138T
H
136T
H
164TH Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 18TH ST - NE 142ND AVE TO NE 162ND AVE
Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. *Environmental Assessment alignment studycompleted and approved in 2004*
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard urban arterial with level of service and safety deficiencies. Project identified inthe Vancouver Comprehensive Plan (2011-2030).
TRANS-444PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 142ND AVE TO: NE 162ND AVE
$19,600,000.00Total Proj. Cost:
$9,600,000.00Const. Cost:$1,500,000.00Design Cost:
Pre-Design Cost:$7,500,000.00ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
39
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-48
TRANS-452
TRANS-748
TRANS-676
**SS-5
TRANS-833
** **SS-7
TRANS-531
TRANS-734
**WTR-14
TRANS-721**WTR-5
TRANS-831
**WTR-3
TRANS-715
**WTR-88TRANS-496
**SS-17
TRANS-821
**SCIP-123
**WTR-35
TRANS-834
**WTR-91
**SCIP-122
TRANS-835
TRANS-495
15TH
MILL PLAINI-5
F
13TH
11TH
D
5TH
G
12TH
17TH
16TH
9TH
19TH
ESTH
ER
C
7TH
E
BROA
DWAY
LINCO
LN
HARN
EY
MCLOUGHLIN
KAUF
FMAN
6TH
OFFICERS
JEFFE
RSON
DANIE
LS
15TH
KING
14TH
8TH
EVERGREENFO
RT VA
NCOU
VER
4TH
3RD
FRAN
KLIN
GRAN
T
HILL
DANIE
LS12THD
E
HARN
EY
MCLOUGHLINMCLOUGHLIN
7TH
17TH
ESTH
ER
KING
ESTH
ER
19TH
6TH
LINCO
LN
5TH
16TH
14TH
COLU
MBIA 6TH
8TH
FRAN
KLIN
MCLOUGHLIN
FORT VANCOUVER
EVERGREEN
EVERGREEN
8TH
C
WASH
INGT
ON
MILL PLAIN
MAIN
MAIN
FORT VANCOUVER
BROA
DWAY
MCLOUGHLIN
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
MAIN ST RECONSTRUCTION - 5TH ST TO 15TH STREET
Complete reconstruction of pavement and sidewalks. Project includes upgraded Street lighting,and pedestrian amenities.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Priority project identified in the Vancouver City Center Vision plan (2007). Project identified inthe Vancouver Comprehensive Plan (2011-2030).Based on 2012 safety report this project haspotentially high safety benefits.
TRANS-495PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: 5TH ST TO: 15TH ST
$11,150,000.00Total Proj. Cost:
$8,750,000.00Const. Cost:$1,400,000.00Design Cost:
Pre-Design Cost:ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
40
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-348
**SCIP-172
TRANS-818
TRANS-281
**SCIP-168
**
TRANS-827
**SCIP-170
**SCIP-173 TRANS-826**SCIP-DR15 **SCIP-172A
**SCIP-73
**WTR-6
TRANS-52718TH
94TH
I-205
14TH
21ST
16TH
20TH
107TH
22ND
23RD
102ND
96TH
109TH
18TH
15TH
103RD
105TH
19TH
95TH
98TH
110TH
101ST
CRANBROOK
104TH
PINE CREEK
FERNGROVE
24TH
100TH
HERON
17TH
KNOL
LCRE
ST
108TH
94TH
WOODRIDGE
99TH
106TH
HOLLY
100TH
19TH
102ND
110TH
94TH
22ND
14TH
21ST
22ND
22ND
14TH
21ST
15TH
95TH
18TH
16TH
105TH
95TH
20TH
101ST
107TH
19TH
109TH
15TH
98TH
20TH
110TH
24TH
97TH
98TH
BURTON
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 18TH ST - NE 97TH AVE TO NE 107TH AVENUE
New street construction and upgrade of existing segments to a minor arterial standard (two laneeach direction plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side ofstreet and shared use pathway on south side of street.*Environmental Assessment and alignment study completed and approved in 2004*
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New Interchange will be constructed at NE 18th St. EA study completed and approved in aFONSI by FHWA in 2004. Project identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-527PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 97TH AVE TO: NE 107TH AVE
$12,750,000.00Total Proj. Cost:
$8,500,000.00Const. Cost:$1,350,000.00Design Cost:
Pre-Design Cost:$1,900,000.00ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
41
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-748
**SS-7
TRANS-676
**WTR-14TRANS-833
**SCIP-123**
TRANS-734
TRANS-531
8TH
GRAN
T
7TH
6TH
HARBORSIDEJE
FFER
SON
14TH
6TH
MILL PLAIN15TH
11TH
13TH
ESTH
ER
12TH
9TH
7TH
6TH
HARN
EY
DANIE
LS
JEFFE
RSON
HILL
KING
14TH
8TH
EVERGREEN
LINCO
LN
MARK
LE KAUF
FMAN
FRAN
KLIN
GRAN
T
INGAL
LS
DANIE
LS
LINCO
LN
ESTH
ER
14TH
12TH
6TH
KING
ESTHER
8TH
PORT
FRAN
KLIN
EVERGREEN
8TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
JEFFERSON ST - W EVERGREEN TO W MILL PLAIN BLVD
Upgrade Rdway to 3 lane minor arterial standard (one lane each direction and turn lane)including upgrades to ADA ramps, sidewalk repair, bike lanes and St lights. Project includes therealignment of Jefferson/Kauffman @ 13th St.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Priority west side circulation route identified in the Vancouver City Center Vision plan (2007).Project identified in the Vancouver Comprehensive Plan (2011-2030).Based on 2012 safetyreport this project has potentially high safety benefits.
TRANS-531PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: 8TH ST TO: 13TH ST
$10,000,000.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
42
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-26
**SCIP-117
TRANS-816
**SCIP-22
**
**SCIP-24
**SCIP-25
**WTR-55
TRANS-536
78TH
FRUIT VALLEY
LAKESHORE
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
FRUIT VALLEY RD - 61ST ST TO NW 78TH ST
Urban upgrade of 2 lane Rdway to full urban principal arterial standard (one lane eachdirection plus center turn lane) including sidewalks, bike lanes, Stlights, and rehabilitation ofexisting bridge. Project includes replacement of bridge over railroad tracks. *EnvironmentalAssessment alignment study completed in approved in 200x*
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard Rdway conditions and reported safety concerns. Project identified in theVancouver Comprehensive Plan (2011-2030).
TRANS-536PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: WHITNEY RD TO: NW 78TH ST
$34,100,000.00Total Proj. Cost:
$25,000,000.00Const. Cost:$6,000,000.00Design Cost:
Pre-Design Cost:$100,000.00ROW Cost:
$3,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
43
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-158
**WTR-79TRANS-555
66T
H
48TH
AN
DR
ES
EN
VANCOUVER MALL
51ST
68T
H
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE VANCOUVER MALL DR. - NE ANDRESEN RD. TO NE 66TH AVE
New St construction to an 3 lane urban arterial standard (one lane each direction and turn lane)including sidewalks, bike lanes and Stlights.
71241
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
New Rdway segment to create east / west circulation. Project identified in the VancouverComprehensive Plan (2011-2030).
TRANS-555PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE ANDRESEN RD. TO: NE 66TH AVE
$2,220,000.00Total Proj. Cost:
$1,100,000.00Const. Cost:$170,000.00Design Cost:
Pre-Design Cost:$950,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
44
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-61
**SCIP-63
**
TRANS-583
LIESER (P)
5TH
88T
H
89T
H
BA
LTIM
OR
E
LIESER
5TH
MILL PLAIN
87T
H
LIE
SE
R
DE
LAW
AR
E
CH
AR
LOT
TE
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 87TH AVE / LIESER RD. REALIGNMENT
Intersection modifications along E. Mill Plain Blvd. at NE 87th Ave. and Lieser Rd to improvecapacity and safety at these offset intersections. Scope of project is undefined.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Offset intersections create significant traffic delay and safety concerns. Project identified in theVancouver Comprehensive Plan (2011-2030).
TRANS-583PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: LIESER RD. TO: EAST 5TH ST.
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
45
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SW-18**SCIP-40
**
TRANS-603
LORRY
MIA
MI
MT OLYMPUS
SH
ER
LE
Y
MIA
MI
LIE
SE
R
MACARTHUR
SAINT HELENS
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
LEISER RD @ MACARTHUR ST. INTERSECTION
Intersection modification to construct new traffic signal. Improvements will include upgradedsidewalks, ADA ramps and St lights.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
This is four-way-stop controlled intersection is operating near maximum capacity with the currentconfiguration during PM peak hour. Improvement listed in Vancouver Comprehensive Plan(2011-2030).
TRANS-603PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: MACARTHUR ST. INTERSECTION TO:
$1,075,000.00Total Proj. Cost:
$750,000.00Const. Cost:$225,000.00Design Cost:
Pre-Design Cost:ROW Cost:
$100,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
46
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-607
172N
D
13TH
GOODWIN
FRIB
ERG-
STRU
NK
1ST
18TH19
2ND
LAKE
MILL PLAIN Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 192ND AVE - SE 1ST ST. TO NE 18TH ST.
Urban upgrade of existing 2 lane Rdway to 5 lane principal arterial standard with bike lanes,sidewalks and Stlights.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Improvement listed in Vancouver Comprehensive Plan (2011-2030). Substandard 2-laneRdway.
TRANS-607PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 1ST ST TO: NE 18TH ST
$4,215,763.00Total Proj. Cost:
$2,715,763.00Const. Cost:$1,000,000.00Design Cost:
Pre-Design Cost:$500,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
47
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SW-8
**SCIP-52
**SCIP-70
TRANS-728
TRANS-732
**SCIP-7
**SCIP-54
**SCIP-172
**SCIP-6
**SCIP-55
**
TRANS-719
TRANS-826
**SCIP-50 **SCIP-56
**SCIP-174 TRANS-678
115T
H
2ND
4TH
I-205
NB
EXIT
29 117T
H
3RD
102N
D
5TH
SAINT HELENS
4TH
I-205
5TH117
TH
7TH
101ST
102ND
103RD
104TH
4TH
105TH
118TH
107TH
110TH
3RD
6TH
116TH
2ND
SAINT HELENS
106TH
MAJOR
108TH
115TH
TANGL
EWOO
D
1ST
CRESTWOOD104TH
5TH
5TH
102ND 103
RD
6TH
2ND
118TH
5TH
110TH
101ST
5TH
4TH
3RD
4TH
4TH
5TH5TH
6TH
116TH
CHKA
LOV
2ND
ELLS
WORT
H
MILL PLAIN
112T
H
107T
H
CHKALOV
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
E MILL PLAIN BLVD. - 104TH AVE TO CHKALOV
Intersection modification to eliminate offset intersections. Improvements include extension of SE104th Ave to SE 2nd St and modification of access to SE 105th Ave and NE 107th Ave. Otherproject improvements include upgrades to ADA ramps, sidewalk improvements, Street lights,striping, overlay, and improved transit stops.
071223
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
The offset intersections of 104th / 105th create traffic level of service delays and safetydeficiency. Additionally, striping, lighting, and pedestrian access needs to be improved along thecorridor. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-678PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 104TH AVE TO: CHKALOV
$4,500,000.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
48
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-680
CUTTER (P)
SPINAKER (P)
COLUMBIA
V
COLUMBIA
COLUMBIA HOUSE
CO
LU
MB
IA S
HO
RE
S
WIN
DW
AR
D (
P)
HALYA
RD
(P) C
OL
UM
BIA
SH
OR
ES
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
COLUMBIA SHORES BLVD @ COLUMBIA WAY - BNSF UNDERCROSSING WIDENING
This project will widen the existing RR undercrossing portal and improve the intersection atColumbia Shores and Columbia Way. Total scope of project is undefined.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Level of service deficiency and sub-standard pedestrian and bicycle access conditions.Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-680PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: RR UNDERCROSSING PORTAL TO:
$25,000,000.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
49
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-85
**SCIP-75
**SCIP-76
TRANS-348
**SCIP-233
**SW-14
**SCIP-88
**SCIP-74
**SW-8
**SCIP-73
**SW-9
TRANS-818
TRANS-720
**SS-22 **SCIP-232
**WTR-6
**SCIP-84
**SCIP-90
**SCIP-172
**SCIP-70
**SCIP-186
TRANS-719
**SCIP-77
**WTR-30
**SCIP-71**WTR-21
**SCIP-86**WTR-13
TRANS-274
**SCIP-89
**SS-19
TRANS-444
TRANS-273**WTR-22
** **SS-8
**SS-112
**WTR-23**WTR-56
**SS-10
**WTR-72
**SCIP-DR17
TRANS-824
**SCIP-DR21
**SCIP-234
**SCIP-173
**SCIP-DR10
**SCIP-185
**SCIP-172A
**SCIP-209
TRANS-703
I-205
18TH
28TH
112T
H
138T
H
136T
H
BURTON
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 18TH ST - FOUR SEASONS LANE TO NE 138TH AVE
Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. ROW funded via an STP grant ($3.237mill).Construction partially funded.*Environmental Assessment and alignment study completed and approved in 2004*
71614
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade substandard urban arterial to resolve level of service and safety deficiencies.Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-703PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: FOUR SEASONS LANE TO: 138TH AVE
$14,000,000.00Total Proj. Cost:
$9,500,000.00Const. Cost:$500,000.00Design Cost:
Pre-Design Cost:$3,000,000.00ROW Cost:
$1,000,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
50
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-4
**SCIP-17
**SS-1
TRANS-737
**SS-20TRANS-275
**SS-21
**
TRANS-713
**SCIP-107**SCIP-202
**SCIP-203
**WTR-4
**SCIP-19
**SCIP-206
TRANS-279
**SCIP-204
TRANS-273**SCIP-207
**WTR-22
**SCIP-200
**SCIP-205
**SCIP-184
**SCIP-201
**SCIP-199
TRANS-712
162N
D
FOURTH PLAIN
137T
H
162N
D
49TH
FOURTH PLAIN
48TH
WARD
POPLAR
76TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 59TH ST - NE 147TH AVE TO NE 162ND AVE
New St construction to urban minor arterial standard (one lane each direction plus turn lane)including sidewalks, bike lanes, Stlights and surface water treatment.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New Rdway segment needed to address circulation needs within sub district. Improvement listedin Vancouver Comprehensive Plan (2011-2030).
TRANS-712PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 147TH AVE TO: NE 162ND AVE
$7,450,000.00Total Proj. Cost:
$4,500,000.00Const. Cost:$1,200,000.00Design Cost:
$750,000.00Pre-Design Cost:$1,000,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
51
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SS-1 TRANS-712
**SS-20TRANS-275
**SCIP-203
**WTR-4
**SCIP-204
**SCIP-107
**
**SCIP-200
**SCIP-205
**SCIP-201
TRANS-713
152ND
157TH
143RD
140TH
65TH
70TH
147TH
63RD
71ST144
TH
159TH
59TH
64TH
69TH
135TH
61ST
72ND
148TH
68TH
62ND
149TH
KERR
67TH
141ST
57TH
139TH
138TH
151ST
150TH
146TH
142ND
157TH
70TH147TH
141ST 71ST
71ST
143RD
65TH
143RD
69TH
70TH
65TH
159TH
63RD
157TH
140TH
69TH
149TH
137T
H
FOURTH PLAINWA
RD
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 147TH AVE - NE 59TH ST TO NE FOURTH PLAIN BLVD
Construct new 3 lane minor arterial Rdway as extension of Ward Road from E Fourth Plain Blvdsouth to new NE 59th St, east/west minor arterial roadway.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New Rdway segment needed to address circulation needs within sub district. Improvement listedin Vancouver Comprehensive Plan (2011-2030).
TRANS-713PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: E FOURTH PLAIN BLVD TO: NE 59TH ST
$5,000,000.00Total Proj. Cost:
$3,250,000.00Const. Cost:$1,000,000.00Design Cost:
$250,000.00Pre-Design Cost:$500,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
52
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-48
TRANS-748
TRANS-833
**SS-17
**WTR-14**SS-7
TRANS-715
ES
TH
ER
6TH
5TH
4TH
ES
TH
ER
3RD
PHIL ARNOLD
WA
SH
ING
TO
N
6TH
CO
LU
MB
IA
6TH
6TH6TH
GR
AN
T
GR
AN
T
6TH
ES
TH
ER
WA
SH
ING
TO
N
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
COLUMBIA WAY - COLUMBIA ST TO GRANT ST
New St construction to urban minor arterial standards (one lane each direction with on Stparking) including enhanced downtown sidewalks, ornamental street lights, and bike lanes.Street will be built to accommodate streetcar transit if required in future. Any right-of-wayrequired to construct the project is anticipated to be dedicated by the land owner at no charge.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Priority circulation route for waterfront redevelopment area identified in Vancouver City CenterVision plan (2007). Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-715PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: COLUMBIA ST TO: GRANT ST
$3,650,000.00Total Proj. Cost:
$2,500,000.00Const. Cost:$850,000.00Design Cost:
Pre-Design Cost:ROW Cost:
$300,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
53
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SS-23 **SCIP-226
**SCIP-228
**WTR-15
**SCIP-96
**SS-15
TRANS-349
TRANS-268
TRANS-607
TRANS-717
** **SCIP-83
**SCIP-225
**SCIP-95 **SCIP-224
TRANS-716
172N
D
13TH
1ST
18TH
192N
D
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 9TH ST - NE 172ND AVE TO NE 192ND AVE
New St construction to urban collector standards (one lane each direction plus turn lane) includingsidewalks, bike lanes, and Stlights. Rdway planned in conjunction with Section 30 Sub Area Planconcept.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Priority east / west circulation route identified in Section 30 Subarea Plan (2009). Improvementlisted in Vancouver Comprehensive Plan (2011-2030).
TRANS-716PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 172ND AVE TO: NE 192ND AVE
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
54
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SS-23**SCIP-226
**SCIP-228
**SCIP-96
**WTR-15
**SCIP-95
**SS-15
TRANS-349
TRANS-268
TRANS-607TRANS-716
**SCIP-224
TRANS-718
**
**SCIP-83
TRANS-444
TRANS-729
**SCIP-93
**SCIP-225
**SCIP-219
**SCIP-78
**SW-28
**SCIP-82
TRANS-739
TRANS-717
172N
D
13TH
FRIB
ERG-
STRU
NK
1ST
18TH
192N
D
162N
D16
4TH
MILL PLAIN
GOODWIN
MILL PLAINMILL PLAIN Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 182ND AVE - SE 1ST ST TO NE 18TH ST
New St construction to urban collector standards (one lane each direction plus turn lane) includingsidewalks, bike lanes, and Stlights. Rdway weaves north / south through site and planned inconjunction with Section 30 Sub Area Plan concept.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Priority north / south circulation route identified in Section 30 Subarea Plan (2009).Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-717PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 1ST ST TO: NE 18TH ST
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
55
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SS-23
**SCIP-226
TRANS-268
**SCIP-83
TRANS-716
**SS-15
**SCIP-78
**
**SCIP-DR30
TRANS-718
1ST
6TH
175TH
12TH
8TH
7TH
160TH
167TH
2ND
5TH
9TH
10TH
152ND
11TH162
ND
4TH
3RD
155TH
151ST
169TH
156TH
163RD
157TH
171ST
164TH
176TH
COUNTRYSIDE154TH
159TH
158TH
BLUE GRASS
161ST
153RD
166TH
166TH
168TH
170TH
173RD
3RD
164TH
2ND
4TH
9TH
158TH
168TH
157TH
8TH
9TH
160TH
12TH
2ND
12TH
158TH
156TH
5TH
176TH
153RD
158TH
1ST
12TH
3RD
12TH
6TH
161ST
169TH
151ST
154TH
4TH
10TH
3RD
5TH
7TH
166TH
171ST
4TH
173RD
157TH
11TH
10TH
152ND
3RD
5TH
3RD
154TH
155TH
6TH5TH
8TH
2ND
4TH
6TH
151ST
12TH
160TH
151ST
170TH
153RD
157TH
3RD
3RD
1ST
167TH6TH
156TH
159TH
10TH
9TH
161ST
158TH
5TH
2ND
6TH
152ND
169TH
2ND
2ND
152ND
162ND
1ST
10TH
11TH
159TH
7TH 7TH
5TH
9TH
4TH
4TH
171ST
2ND2ND
3RD
5TH169
TH
8TH
157TH
161ST
172N
D
1ST
164T
H
162N
D
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 162ND AVE - SE 1ST ST TO NE 9TH ST
Urban upgrade of 5 lane Rdway to 7 lane principal arterial standard (3 lanes each directionplus turn lane) including sidewalks, bike lanes and StlightsProject Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Roadway constriction at this location. Improvement listed in Vancouver Comprehensive Plan(2011-2030).
TRANS-718PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 1ST ST TO: NE 9TH ST
$11,250,000.00Total Proj. Cost:
$7,000,000.00Const. Cost:$1,000,000.00Design Cost:
Pre-Design Cost:$2,500,000.00ROW Cost:
$750,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
56
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SW-9
**SCIP-85
**SCIP-71
**WTR-21
**SW-8
**SCIP-172
**SCIP-70
**SCIP-75
**SCIP-76
TRANS-348
**SCIP-52
**SCIP-233
**SW-14
TRANS-728
**SCIP-68
**SCIP-232**SS-22
**SCIP-2
TRANS-703
**SCIP-74
**
**SCIP-6
TRANS-720
**SCIP-64
TRANS-826
TRANS-732
**SCIP-73
**SCIP-55**SCIP-7**SCIP-47
**SCIP-54
TRANS-527 **WTR-30
**SCIP-45 **SCIP-50
TRANS-678
**SCIP-84
**SCIP-174
TRANS-281
TRANS-827
**SCIP-173
**SCIP-56
**SCIP-69
**SCIP-DR1
**SCIP-DR21
**SS-8
**SS-112
**WTR-23
**WTR-56
**SS-10
**SCIP-86
**SCIP-170
**SCIP-DR15
**SCIP-234
**SCIP-DR27
**SCIP-168
**SCIP-185
**SCIP-172A
**SW-10
**SCIP-21
TRANS-719
I-205
97TH
98TH
CHKA
LOV
98TH
18TH
MILL PLAIN
112T
H
136T
H2ND
ELLS
WORT
H
SAINT HELENS
107T
H
CHKALOV
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 112TH AVE - E MILL PLAIN BLVD. TO NE 15TH ST
Corridor improvement project to bring NE 112th Avenue up to urban arterial standards.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Priority sidewalk improvement identified in 112th Ave Subarea Plan (2011). Improvement listedin Vancouver Comprehensive Plan (2011-2030).
TRANS-719PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: E MILL PLAIN BLVD TO: NE 15TH ST
$1,650,000.00Total Proj. Cost:
$1,100,000.00Const. Cost:$400,000.00Design Cost:
Pre-Design Cost:ROW Cost:
$150,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
57
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-720
I-205
172N
D
39TH
97TH
10TH
15TH
136T
H
98TH
MCGILLIVRAY
CHKA
LOV2ND
98TH
18TH
28TH
MILL PLAIN
112T
H
162N
D138T
H
164T
H
1ST136T
H
BURTON
Ê
Completed
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 136TH / 137TH AVE - E MILL PLAIN BLVD TO NE 28TH ST
Install new switches and signal hardware at each traffic signal. Project will improvecommunications and operations of signal network.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Improvement listed in Vancouver Comprehensive Plan (2011-2030). Project identified asregional priority in the Transportation System Management and Operations Plan (RTC2011).Based on 2012 safety report this project has potentially high safety benefits.
TRANS-720PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: E MILL PLAIN BLVD TO: NE 28TH ST
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
58
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-721
MILL PLAIN
SR-500 EB
SR-500 WB
15TH
LOWER RIVER
I-5
39TH
33RD
COLU
MBIA
54TH
15TH
MAIN
EVERGREEN
ROSS
MCLOUGHLIN
8TH
18TH
FRAN
KLIN
26TH
PORT FORT VANCOUVER
44TH
HAZEL DELL
20TH
8TH
C
FOURTH PLAIN
GRAN
D
SAINT JOHNS
MILL PLAIN
FRUI
T VAL
LEY
SAINT JAMESÊ
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
COLUMBIA ST./MAIN ST. VAST 6TH TO 45TH
Install new fiber optic communications fiber and signal hardware at each traffic signal. Projectwill improve communications and operations of signal network.
71327
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Improvement listed in Vancouver Comprehensive Plan (2011-2030). Project identified asregional priority in the Transportation System Management and Operations Plan (RTC2011).Based on 2012 safety report this project has potentially high safety benefits.
TRANS-721PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: 6TH ST TO: NE 45TH ST
$1,059,900.00Total Proj. Cost:
$859,900.00Const. Cost:$200,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
59
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-722
NE 68TH ST
NE SAIN
T JOHNS R
D
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
ST JOHNS BLVD. @ NE 68TH ST
Modify existing intersection for traffic safety and operations.
71310
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-722PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
60
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-723
176
TH
22ND
21ST
19TH
20TH
175TH
177
TH
19TH
176T
H
21ST
176
TH17
5T
H
20TH
18TH
174
TH Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SE 20TH ST @ SE 176TH AVE
Modify existing intersection for traffic safety and operations.
71227
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-723PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
61
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-210
TRANS-7241ST
148
TH
HE
AR
TH
WO
OD
COAST PINE
JUN
IPER
2ND
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
HEARTHWOOD @ SE 1ST ST
Modify existing intersection for traffic safety and operations. Scope of work undefined.
71231
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-724PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
62
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-725
V S
T
E 29TH ST
E 28TH STSAINT JOHNS BLVD
FO
RT
VA
NC
OU
VE
R W
AY
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
ST JOHNS BLVD. @ FT VANCOUVER WAY
Modify existing intersection to construct intersection improvements to address traffic safety andoperational issues. Per Clark College DA, City is only responsible for ROW acquisition.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Level of Service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-725PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$2,000,000.00Total Proj. Cost:
$1,400,000.00Const. Cost:$175,000.00Design Cost:
Pre-Design Cost:$250,000.00ROW Cost:
$175,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
63
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
** **WTR-80TRANS-726
45TH (P)
43RD (P)
44TH (P)
72N
D (
P)
LOO
WIT
(P
)43RD (P)
72N
D
77T
H
41ST
PARKWAY
41ST
44TH (P)
75T
H
(P)
45TH (P)
GR
EE
NW
OO
D
VANCOUVER PLAZA
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 45TH ST - NE 72ND AVE TO NE 77TH AVE
New St construction to urban collection standard (one lane each direction plus turn lane) includingsidewalks, bike lanes and Stlights.
71242
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2013*Start of Construction (Year):
Missing St in arterial network. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-726PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 72ND AVE TO: NE 77TH AVE
$1,162,000.00Total Proj. Cost:
$767,000.00Const. Cost:$125,000.00Design Cost:
Pre-Design Cost:$270,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
64
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**
**SCIP-164 TRANS-72785
TH
(P
)
86T
H
(P)
84T
H
(P)
51ST
82N
D
78T
H
54TH
81S
T
84T
H
VANCOUVER MALL
55TH
56TH
85T
H
79T
H
77T
H 54TH
55TH
54TH
VANCOUVER MALL
TH
UR
ST
ONLO
OW
IT (P
)
LOO
WIT
(P)
56TH (P)
55TH (P)
83R
D
53RD
56TH
85T
H
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 82ND AVE - NE 51ST ST TO NE 54TH ST
Urban upgrade of 2 lane Rdway to minor arterial standard (2 lanes each way and turn lane)including sidewalks, bike lanes and Stlights.
71243
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2013*Start of Construction (Year):
Substandard Rdway conditions. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-727PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 51ST ST TO: NE 54TH ST
$619,300.00Total Proj. Cost:
$467,000.00Const. Cost:$70,000.00Design Cost:
Pre-Design Cost:$82,300.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
65
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SS-23**SCIP-226
**SCIP-81
**WTR-15
**SCIP-79
**SCIP-228
**SS-15TRANS-268
**SCIP-80
TRANS-607
** TRANS-717
TRANS-723
TRANS-729
15TH
172N
D
BYBEE
1ST
192N
DMILL PLAIN
Ê
Completed
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
E MILL PLAIN BLVD - SE 172ND AVE TO SE 192ND AVE
Urban upgrade of to urban principal arterial standard. *This project funding to be reallocatedto NE 18th St corridor improvements upon Congressional approval*Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New Rdway constructed. Improvement listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-729PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 172ND AVE TO: SE 192ND AVE
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
66
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-734
MILL PLAIN 15TH
SR-500 EB SR-500 WBLOWER RIVER
I-5
39TH
33RD
COLU
MBIA
15TH
MCLOUGHLIN
8TH
EVERGREEN
FRAN
KLIN
26TH
PORT FORT VANCOUVER
6TH
16TH
EVERGREEN
CMA
IN
FOURTH PLAIN
MILL PLAIN
FRUI
T VAL
LEY
SAINT JOHNS
Ê
Construction
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:BicycleProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
COLUMBIA ST/97TH ST/ST HELENS/MCLOUGHLIN SHARROWS
Install bike sharrow markings for increased safety and transportation mobility. This project ispart of Bike Vancouver Phase II grant. Also includes sharrows on 97th Mcloughlin, and St. Helens.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Priority north/south bicycle corridor west of I-5. Improvement listed in Vancouver ComprehensivePlan (2011-2030).
TRANS-734PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$200,000.00Total Proj. Cost:
$170,000.00Const. Cost:$30,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
67
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-737
FOURTH PLAIN16
2ND
39TH
76TH
182N
D
137T
H
162N
D
49TH
FOURTH PLAIN
48TH
WARD
POPLAR
138TH Ê
Construction
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 162ND AVE - POPLAR TO FOURTH PLAIN BLVD FIBER COMMUNICATIONS
Install traffic signal fiber optic cable for increased signal communications.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Project listed in Vancouver Comprehensive Plan (2011-2030). Identified as a regional priority inthe Transportation System Management and Operations plan (RTC 2011).
TRANS-737PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 39TH ST TO: E FOURTH PLAIN BLVD
$372,000.00Total Proj. Cost:
$282,000.00Const. Cost:$90,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
68
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-739
TRANS-739
SR-14 EB
SR-14 WB
SR-500 EB SR-500 WB
I-205
18TH 172N
D
39TH
15TH20TH
86TH
97TH
MCGILLIVRAY10TH
EVERGREEN
87TH
FALK
MACARTHUR
98TH
44THVANCOUVER MALL
2ND
EVERGREEN
98TH 18TH
MILL PLAIN
192N
D
28TH
112T
H
162N
D16
4TH
1ST
FOURTH PLAIN
34TH
49TH
ANDRESEN
GRAND
136T
H13
7TH
48TH
Ê
Construction
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
E MILL PLAIN BLVD. @ SE 157TH AVE & MILL PLAIN BLVD. WEST OF ANDRESEN
Install two pedestrian hawk signals for enhanced traffic safety. One at Mill Plain/157th and onewest of Mill Plain/Andresen.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Pedestrian collision history. Program listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-739PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 157TH AVE TO:
$500,000.00Total Proj. Cost:
$375,000.00Const. Cost:$125,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
69
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SW-15**SCIP-41
**SCIP-38**SW-18
**SW-16
**SCIP-21
**SCIP-2
**SW-17
TRANS-838
**SCIP-40**SCIP-47
**SCIP-48
**SCIP-42
**WTR-32
**SCIP-18
**WTR-16
**WTR-70
**WTR-52
**
TRANS-337
**SCIP-43
**SCIP-45
**WTR-95
**SCIP-52**SCIP-DR1
**SCIP-6
**SCIP-44TRANS-603**WTR-31
**SCIP-180
**WTR-93
**SCIP-DR6
TRANS-740SR-14 EB
SR-14 WBLIE
SER
98TH
MACARTHUR
RIVERSIDE
ANDR
ESEN
SAINT HELENSEVERGREEN
EVERGREEN
10TH
88TH
CHELSEA
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
EVERGREEN HWY TRAIL - IMAGE RD. TO CHELSEA AVE
Upgrade street with 10 foot pedestrian pathway on south side of Rdway. Only partially funded(Design only).Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.
TRANS-740PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: IMAGE RD TO: CHELSEA AVE
$2,900,000.00Total Proj. Cost:
$1,500,000.00Const. Cost:$450,000.00Design Cost:
Pre-Design Cost:$750,000.00ROW Cost:
$200,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
70
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-741SR-14 EB SR-14 WB
I-205
EVERGREEN
MCGILLIVRAY
15TH
20TH
136T
H
VILLAGE
164T
H
34TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
EVERGREEN HWY TRAIL - SILVER SPRINGS TO SE 164TH AVE
Upgrade street with 10 foot pedestrian pathway on south side of Rdway.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.
TRANS-741PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE SILVER SPRINGS DR TO: SE 164TH AVE
$5,100,000.00Total Proj. Cost:
$3,000,000.00Const. Cost:$550,000.00Design Cost:
Pre-Design Cost:$1,250,000.00ROW Cost:
$300,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
71
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-742
SR-14 EBSR-14 WB
LEWIS AND CLARK
EVERGREEN
BRADY
34TH PACIFIC RIM34TH
192N
D
164T
H
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
EVERGREEN HWY TRAIL - SE 164TH AVE TO E. CITY LIMITS
Upgrade street with 10 foot pedestrian pathway on south side of Rdway.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.
TRANS-742PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 164TH AVE TO: EAST CITY LIMITS
$4,750,000.00Total Proj. Cost:
$2,500,000.00Const. Cost:$500,000.00Design Cost:
Pre-Design Cost:$1,000,000.00ROW Cost:
$250,000.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
72
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-471
**SW-13
TRANS-746
SE
16
6T
H A
VE
SE MCGILLIVRAY BLVD
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SE MCGILLIVRAY BLVD. @ SE 166TH AVE
Intersection improvement to install an urban roundabout, including upgrades and ADA ramps andStlights. This project was combined with 071611 (164th Ave. intersection improvements project).
071608
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Level of service deficiency. Project listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-746PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE 164TH AVE TO: SE 166TH AVE
$350,000.00Total Proj. Cost:
$350,000.00Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
73
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-48
TRANS-833
**SS-5**
**SS-7
**WTR-14
TRANS-531
TRANS-831
TRANS-715
TRANS-676
**SS-17
TRANS-821
**WTR-3
TRANS-452
TRANS-748
I-5
11TH
9TH
12TH
ESTH
ER
7TH
5TH
HARN
EY
6TH
JEFFE
RSON
HILL
DANIE
LS
KING
8TH
EVERGREEN
4TH
3RD
FRAN
KLIN
LINCO
LN
WASH
INGTO
N
GRAN
T
BROA
DWAY
12TH
6TH
6TH
ESTH
ER
KING
8TH
MAIN
COLU
MBIA
PORT
6TH
EVERGREEN
8TH
FRAN
KLIN
WASH
INGT
ON
Ê
Construction
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
DOWNTOWN WATERFRONT ACCESS PROJECT
Install new urban streets and undercrossings of BNSF railway at Esther St and Grant Street, toinclude enhanced downtown sidewalks, ornamental street lights, and bike lanes (at Grant St).Project costs shown include rail portion of the project as well as the road portion of the project.Rail portion completed in early 2013. Roadway portion to be completed in early 2014.
71233
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2011*Start of Construction (Year):
This project will provide for additional north/south circulation in lower downtown through theBNSF railroad berm. Improvement listed in Vancouver Comprehensive Plan (2011-2030).Project listed as a priority improvement in the Vancouver City Center Vision plan (2007).
TRANS-748PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$44,000,000.00Total Proj. Cost:
$34,000,000.00Const. Cost:$4,000,000.00Design Cost:
Pre-Design Cost:$6,000,000.00ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
74
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-816
LOWER RIVER SR-500 WB
I-5
39THHA
ZEL D
ELL
15TH
33RD
COLU
MBIA
ROSS
26TH
78TH
MAIN
FRUIT VALLEY
FOURTH PLAIN
HIGH
WAY 9
9
LAKESHORE
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NW 32ND AVE - SR501 TO WHITNEY
Install new arterial roadway from SR501 to Fruit Valley Road.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
TRANS-816PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: LOWER RIVER RD TO: FRUIT VALLEY RD
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
75
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-818
SR-500 EB
SR-500 WB
SR-14 EB
SR-14 WB
117T
H
I-205
63RD
18TH
39TH
86TH
97TH
10TH
87TH
MACARTHUR
LIESE
R
EVERGREEN
136T
H
98TH
STAP
LETO
N
MCGILLIVRAY
107T
H
THURSTON
CHKA
LOV2ND
AUTO
MAL
L
98TH
MILL PLAIN
18TH
28TH
162N
D
112T
HFOURTH PLAIN
ANDR
ESEN
49TH
138T
H
164T
H
137T
H13
6TH
63RD
48TH
MINNEHAHA
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE BURTON/28TH STREET - NE ANDRESEN RD TO NE 138TH AVE
Install switches at multiple signals along corridor to improve signal operations.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
TRANS-818PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE ANDRESEN RD TO: NE 138TH AVE
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
76
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-24TRANS-819
36TH
34TH
WE
IGE
L
UNANDER
LAFRAMBOIS
TH
OM
PS
ON
VAN ALLMAN
THO
MP
SO
N
FR
UIT
VA
LL
EY
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NW FRUIT VALLEY RD @ LA FRAMBOIS
Replace existing signal with Hawk pedestrian signal.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
TRANS-819PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
77
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-741
**SCIP-223
TRANS-838
**SS-4**WTR-2
**SCIP-222
TRANS-742
**SW-13**WTR-20
**
**SCIP-213**SCIP-212
**SCIP-211
TRANS-594
**SCIP-221
**SS-18
TRANS-730
**SCIP-214
TRANS-746
**SCIP-189
TRANS-823
TRANS-823
TRANS-823
SR-14 EB
SR-14 WBEVERGREEN
164T
H
34TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
EASTSIDE QUIET ZONE LID
Proposed Local Improvement District (LID) to install crossing protection at several rail crossings oneast side of Vancouver so trains will not blow horns near private residences.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Implement a quiet zone in East Vancouver in the vicinity of Evergreen Highway as requested bycitizens in the area.
TRANS-823PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$850,000.00Total Proj. Cost:
$700,000.00Const. Cost:$150,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
78
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-186
**SCIP-86**WTR-13
**SCIP-DR17
**SCIP-DR24
**SCIP-DR14
TRANS-82412
4T
H
26TH
24TH
123
RD
23RD
26TH
23RD
27TH
FO
UR
SE
AS
ON
S
121
ST Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
ENDEAVOUR ELEMENTARY PATHWAY AND SAFETY IMPROVEMENT PROGRAM
Construct an HMA pathway behind Endeavour Elementary that will connect to NE 26th Street andNE 24th Street.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
New pathway will allow students to safely walk and bicycle to school without having to travelalong NE 28th Street.
TRANS-824PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$170,000.00Total Proj. Cost:
$140,000.00Const. Cost:$30,000.00Design Cost:
$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
79
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-128
**
**WTR-36
**SCIP-32
**SCIP-33
**SCIP-34
**WTR-98
**SCIP-30
**SCIP-20
**SCIP-23
**SCIP-110
**WTR-9
**SCIP-31
**WTR-84
**SCIP-129
TRANS-825
I-5
54TH
15TH
ROSS
44TH
MINNEHAHA
SAIN
T JOH
NS
SAIN
T JAM
ES
63RD
HIGH
WAY 9
9
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 54TH STREET - NE 15TH AVE TO NE SAINT JAMES RD
Urban upgrade of existing 2 lane Roadway to a 3 arterial standard (one lane each directionplus turn lane). Street upgrades include city standard sidewalks, bike lanes, Street lights, andADA ramps.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with level of service and safety deficiencies (especiallyat the intersection of 54th and Drexel). Project identified in Vancouver Comprehensive Plan(2011-2030).
TRANS-825PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 15TH AVE TO: NE SAINT JAMES RD
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
80
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**SCIP-68
**SW-8
**SCIP-172
**SW-9**SCIP-70 **SCIP-71
**SCIP-52
TRANS-348
**SW-14
**SCIP-2
**SCIP-74
TRANS-728
**SCIP-6
**SCIP-21
**SW-1
**SCIP-64
TRANS-732
**SCIP-73
**WTR-21
TRANS-719**
**SW-3 TRANS-281
**SCIP-54
TRANS-527
**SCIP-55
**WTR-30 **SS-22
**SCIP-75
TRANS-678
**SCIP-7
**SCIP-61
**SCIP-47**SCIP-45
**SCIP-174
**SCIP-50
TRANS-827
TRANS-583
**SCIP-173
**SCIP-69
**SCIP-DR1
**SCIP-DR21
**WTR-56**WTR-23
**SCIP-56
**WTR-72
**SCIP-170
**SCIP-63
**SCIP-DR15
**SCIP-234**SCIP-66
**SCIP-DR27
**SCIP-185
**SS-8
**SCIP-172A
**SCIP-DR19
**SCIP-DR16
TRANS-826
I-205
97TH87
TH
98TH
CHKA
LOV
2NDMILL PLAIN
112T
H
18TH
CHKALOV
ELLS
WORT
H
SAINT HELENS
107T
H
98TH
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 104TH AVENUE - SE MILL PLAIN BLVD TO NE 14TH STREET
Urban upgrade of existing 2 lane Roadway to a 3 arterial standard (one lane each directionplus turn lane). Street upgrades include city standard sidewalks, bike lanes, Street lights, andADA ramps.
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).
TRANS-826PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: SE MILL PLAIN BLVD TO: NE 14TH ST
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
81
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-348
**SCIP-172
TRANS-527
**SCIP-173
**SCIP-170
**
TRANS-826
**SCIP-73
**SCIP-DR15
**SCIP-172A
**SCIP-168
TRANS-827
18TH
I-205 NB EXIT 29
102N
D
I-205
14TH
18TH
16TH
20TH
107TH
102ND
19TH
109TH
15TH
103RD
104TH 12TH
108TH
98TH
101ST
100TH
17TH
99TH
105TH
100TH
107TH
15TH
102ND
98TH
18TH
14TH
20TH
15TH
19TH
15TH
14TH
16TH
104TH
101ST
98TH
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 104TH AVENUE - NE 14TH STREET TO NE 18TH STREET
Install new 3 arterial standard (one lane each direction plus turn lane). Street improvementsinclude city standard sidewalks, bike lanes, Street lights, and ADA ramps.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
New urban arterial will address level of service and accessibility issues. Project identified inVancouver Comprehensive Plan (2011-2030).
TRANS-827PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: NE 14TH ST TO: NE 18TH ST
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
82
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**
TRANS-721**WTR-5
TRANS-734
TRANS-751
**WTR-53
TRANS-829
32ND
36TH
41ST
33RD
35TH
40TH
GRAN
T
31ST
38TH
F
DANIE
LS
34TH
HARN
EY
KAUF
FMAN
DIVISI
ON
WASH
INGTO
N
CRES
TON
FRAN
KLIN
37TH
COLU
MBIA
PINE
38TH
36TH
37TH
38TH
34TH
35TH
40TH
F36TH
35TH
DIVISI
ON
FRAN
KLIN
39THCO
LUMB
IA
33RD
MAIN
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CDBGProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
COLUMBIA STREET - 33RD STREET TO 39TH STREET
ADA, Alley approach, and sidewalk repair improvements along Columbia Street between 33rdStreet and 39th StreetProject Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Improve pedestrian access and mobility along Columbia Street
TRANS-829PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: W 33RD ST TO: W 39TH ST
$330,000.00Total Proj. Cost:
$300,000.00Const. Cost:$30,000.00Design Cost:
$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
83
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-78
**SS-13
**WTR-25
TRANS-258
**
**WTR-58**WTR-57
**WTR-42**WTR-37
**WTR-39
**WTR-11
TRANS-835**WTR-41
**WTR-81
**SCIP-8
TRANS-832
**SCIP-36
TRANS-731
**WTR-9
**WTR-18
TRANS-725
**SCIP-125**SCIP-126
TRANS-733
**WTR-29
TRANS-830
P
R
S
Q
O
V
U
29TH
Z
X
26TH
T
30TH
27TH
25TH
13TH
28TH
W
14TH
Y
NORR
IS
FAIRMOUNT
BRANDT
17TH
WATS
ON
NEAL
S
15TH
RESE
RVE
16TH
31ST
NICHOLSON
24TH
19TH
TODD20TH
MCLOUGHLIN
33RD
21ST
18TH
ASH
GRAN
D
ROSS
ITER
DATE
JUNE
ALGONA
12TH
DRUM
MOND
32ND
BRYA
NTMURT
ON
CELL
ARS
BRIDG
E
TERRACE
GIBBONS
HARNEY HEIGHTS
PLOMONDON
43RD
HOWA
RDLA
UREL
LARS
EN
WILS
ON
MANO
R WINC
HELL
41ST
SAINT JOHNS
22ND
Z
V
ALGO
NA
32ND
U
30TH 30TH
25TH
14TH
Z
27TH
BRIDG
E
Y
16TH
Z
NORR
IS
Y
15TH
17TH
27TH
T
W
14TH
YX
17TH
Z
28TH
NEALS
Y
16TH
X
19TH
32ND
18TH
33RD
FALK
MCLOUGHLIN
20TH
GRAN
D
SAINT JOHNS
FORT VANCOUVER
FOURTH PLAIN
33RD
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
FOURTH PLAIN CROSSWALK UPGRADES TO HYBRID BEACONS
Install pedestrian hybrid beacons along Fourth Plain at the following locations: T St., Z St.,Fairmont St., Neals Ln., and Todd/Rossiter Ln.
71326
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Improve pedestrian safety along Fourth Plain by installing pedestrian hybrid beacons at severalintersections.
TRANS-830PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: T ST TO: ROSSITER LN
$375,000.00Total Proj. Cost:
$360,000.00Const. Cost:$15,000.00Design Cost:
$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
84
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-25
TRANS-258TRANS-830
**
TRANS-832TRANS-832
LINDA
GIBBONS
PLOMONDON
NEAL
S
NORR
IS
NEAL
S
26TH
WATS
ON
21ST
28TH
27TH
25TH
ROSS
ITER
TODD
24TH
ALGONABR
ANDT
TERRACE
HOWA
RD
LAUR
EL
HAZELWOOD
WILS
ON
CEDA
R
24TH
25TH
24TH
27TH
ALGO
NA
FALK
FOURTH PLAIN
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
FOURTH PLAIN INFILL SIDEWALK
Sidewalk and ADA improvements along Neals Ln and Rossiter Ln from Fourth Plain to NE 26th St.
71450
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Improve pedestrian access and safety along Neals Ln and Rossiter Ln. Will provide pedestrianaccess to Fourth Plain Boulevard which is a high transit use corridor.
TRANS-832PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$1,042,000.00Total Proj. Cost:
$439,000.00Const. Cost:$140,000.00Design Cost:
$0.00Pre-Design Cost:$463,000.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
85
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-48
TRANS-748
**SS-7
TRANS-821
TRANS-452**SS-5
**WTR-14 TRANS-495
** TRANS-831
TRANS-715
TRANS-531
**SS-17
TRANS-834
TRANS-833
8TH
GRAN
T7TH
6TH
ESTH
ER
6TH
I-5
9TH
7TH
5TH
6TH
ESTH
ER
KING
HILL
BROA
DWAY
8TH
4TH
3RD
JEFFE
RSON
HARN
EY
FRAN
KLIN
PHIL ARNOLD WASH
INGTO
N
DANIE
LS
6TH
ESTH
ER
8TH
COLU
MBIA
6TH
PORT
8TH
C
MAINWA
SHIN
GTON
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
VANCOUVER WATERFRONT TRAIL
Major trail and aesthetic improvements along the Vancouver Waterfront from approximatelyLincoln St to Columbia StProject Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Improve pedestrian access and safety along the Vancouver Waterfront. Improve aesthetics andpromote livability along the Vancouver Waterfront
TRANS-833PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: LINCOLN ST TO: COLUMBIA ST
$15,000,000.00Total Proj. Cost:
$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
86
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**WTR-48
TRANS-452
TRANS-834
BR
OA
DW
AY
ST
E 8TH ST
E 9TH ST
C S
T
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:CapacityProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NE 9TH ST - BROADWAY TO C ST
Extend 9th street from Broadway to C Street. Improvements will include travel lanes, sidewalk,ADA ramps, street lights, and other amenities similar to the existing 9th Street to the west.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Project will improve circulation, access, and connectivity in downtown Vancouver.
TRANS-834PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: BROADWAY ST TO: C ST
$0.00Total Proj. Cost:
$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
87
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
**
**WTR-78**WTR-57
**WTR-58
**WTR-42
**WTR-39
TRANS-258
**WTR-37
**WTR-11
**WTR-41
TRANS-830
**SCIP-8**WTR-9
**SCIP-125
**WTR-44
**WTR-48
**WTR-29TRANS-835
I-5
Z
X
T
P
Y
W
16TH
27TH
Q
25TH
26TH
O R
RESE
RVE
K S
18TH17TH
20TH
14TH
MANO
R
SAINT JOHNS
Z
27TH
RESE
RVE
Z
T
18THMCLOUGHLIN
FORT VANCOUVER
FOURTH PLAIN
SAINT JOHNS
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
FORT VANCOUVER WAY SUBAREA IMPROVEMENTS - MCLOUGHLIN TO 4TH PLAIN
Sidewalk, bicycle, and aesthetic improvements along Fort Vancouver Way from Mcloughlin to 4thPlainProject Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Project will improve pedestrian and bicycle access and safety as well as provide aestheticimprovements in conformance with the adopted subarea plan for the area.
TRANS-835PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: E MCLOUGHLIN BLVD TO: E FOURTH PLAIN BLVD
$0.00Total Proj. Cost:
$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
88
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-817 TRANS-837
N G
AR
RIS
ON
RD
MILL PLAIN CT
E MILL PLAIN BLVD
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
E MILL PLAIN @ GARRISON SIGNAL IMPROVEMENT
Upgrade existing span wire signal. Upgrade all components of the signal to current standardsincluding cabinet, poles, conduit, junction boxes, detection, ADA ramsp, mast arms, and lights.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Existing span wire signal has wood poles that are in jeopardy of failing. Most components of thesignal are old and are in need of upgrading to current standards.
TRANS-837PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: MILL PLAIN TO: GARRISON
$387,000.00Total Proj. Cost:
$350,000.00Const. Cost:$37,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
89
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-237SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
TRAFFIC SIGNAL SUSTAINABILITY
Ongoing updating of traffic signals at various locations and may include but not be limited toadding a left turn phase, adding a signal head, adding a push-button, removing an operation,adding detectors, changing the detector setup, or other similar improvements. (Budgeted$150,000 annually.)
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Projects identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-237PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
90
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-238SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
DISABLED ACCESS (ADA)
Miscellaneous ADA ramp upgrades at various locations citywide. Ramp locations prioritized inthe City ADA Transition Plan. (No annual budget.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Projects identified in the Vancouver ADA Transition Plan.
TRANS-A-238PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
91
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-239SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SCHOOL CROSSING PROTECTION
New and replacement pedestrian school zone beacons including enhancements to signs andmarking at various locations citywide. (No annual budget.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program listed in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-239PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
92
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-240SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
NEIGHBORHOOD TRAFFIC MANAGEMENT
This ongoing project (Neighborhood Traffic Management Program) funds installation of trafficcalming (speed controls) and traffic management measures (traffic volume controls). It includeseducational approaches that address the same issues by heightened awareness of the impacts ofspeeding traffic (for example Neighborhood Speed Watch). The project also address othertraffic safety issues such as pedestrian/bicycle safety, sight restrictions and parking problems.($120k annual budget.)
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
The Neighborhood Traffic Control Program is important to reaching our Community Vision of “...Safe neighborhoods with a distinct quality and proud identities linked by parks and greenspaceas well as a transportation system that provides mobility options for all.” The project is consistentwith the City’s Strategic Commitments of Creating Identity as One City and Quality Growth andDevelopment through projects in support of neighborhoods.Speeding on residential Sts is one of the most frequent complaint from citizens and neighborhood
TRANS-A-240PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
93
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-241SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
PAVEMENT PRESERVATION PROGRAM
Upgrade pavement surfaces by surface overlay and slurry treatments at multiple locationscitywide. Upgrades may include updating ADA ramps, traffic striping and markings. (Budgeted$6.1 Million in 2014 and inflationary increases after.)
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-241PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
94
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-242SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
BIKEWAYS
Installation of bike lane and bike Blvd projects on existing St at various locations citywide. (Noannual budget.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-242PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
95
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-244SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
SAFE WALKWAYS
Installation of new sidewalks on existing Sts at various locations citywide. (No annual budget.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-244PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
96
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-245SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
BRIDGE MANAGEMENT PROGRAM
Ongoing citywide inspection and maintenance of the city's bridges. (Budgeted $10,000annually.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Maintain safe bridges in compliance with state and federal regulations. Program identified inthe Vancouver Comprehensive Plan (2011-2030).
TRANS-A-245PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
97
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-421SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
PAVEMENT RECONSTRUCTION PROGRAM
Major pavement and Rdway reconstruction of failed pavement surfaces on existing Sts at variouslocations citywide. (No annual budget.)Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program identified in the Vancouver Comprehensive Plan (2011-2030).
TRANS-A-421PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$0.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
98
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-738SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:OngoingProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
TRAFFIC SAFETY & LIVABILITY - CITYWIDE
Install upgrades to traffic signal hardware, markings and signs to enhance traffic safety andmultiple locations citywide. ($125,000 annual budget for 2013/2014 includes $60k each yearfor Neighborhood Traffic Management Program).
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
ONGOING*Start of Construction (Year):
Program listed in Vancouver Comprehensive Plan (2011-2030).
TRANS-A-738PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
99
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-A-828SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
29TH
C
76TH
50TH
212T
H
99TH
11TH
BLAIR
119TH
RISTO
6TH
39TH
159TH
EATON
78TH
41ST
83RD
20TH 38TH
139TH
292ND
33RD
117TH
COLUMBIA
53RD
INGLE
164TH25
TH
10TH
142N
D
15TH
199TH
19TH
72ND
119TH
18TH
78TH11
2TH
3RD
41ST
36TH
Ê
In Design
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TrafficProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
FLASHING YELLOW ARROW UPGRADE PROJECT
Upgrade 35 signalized intersections across the City from permitted/protected left-turn operationto flashing yellow arrow left turn operation.Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
The City of Vancouver currently has 35 intersections with PPLT phasing which has long beenconsidered confusing to motorists attempting to make left turns resulting in serious collisions withthrough traffic in the opposite direction. The NCHRP report Evaluation of the Flashing YellowArrow Permissive-Only Left-Turn Indication Field Implementation cites a significant reduction incollisions associated with conversion of PPLT to FYA.
TRANS-A-828PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$450,000.00Total Proj. Cost:
$375,000.00Const. Cost:$75,000.00Design Cost:
$0.00Pre-Design Cost:$0.00ROW Cost:
$0.00Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
100
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-DT-451
SR-14 EBSR-14 WB
15TH
LOWER RIVER I-5
COLU
MBIA 33RD
MAIN8TH
MCLOUGHLIN
FRAN
KLIN
26TH
PORT
EVERGREEN
FORT VANCOUVER
6TH
16TH
8TH
CMA
IN
FOURTH PLAIN
MILL PLAIN
FRUI
T VAL
LEY
SAINT JOHNS
Ê
Planned
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:TDMProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
DESTINATION DOWNTOWN TDM
Downtown focused transportation demand management program. Investments include: employeroutreach, commuter training, bike sidewalk and ADA system investments, incentive programsProject Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Program identified as priority implementation strategy for Vancouver City Center Vision plan(2007). Program adopted into the City of Vancouver Commute Trip Reduction Plan and Growthand Transportation Efficiency Center Plan (2008).
TRANS-DT-451PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$230,000.00Total Proj. Cost:
$200,000.00Const. Cost:$30,000.00Design Cost:
Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
101
Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
TRANS-DT-822
SR-14 EBSR-14 WB
15TH
LOWER RIVER I-5
COLU
MBIA 33RD
MAIN8TH
MCLOUGHLIN
FRAN
KLIN
26TH
PORT
EVERGREEN
FORT VANCOUVER
6TH
16TH
8TH
CMA
IN
FOURTH PLAIN
MILL PLAIN
FRUI
T VAL
LEY
SAINT JOHNS
Ê
Pending Funding
Date: 5/20/2014
PROJECT AREA MAP
PROJECT:
PROJECT SUMMARY
Project Status:
TransportationUtility Type:EnhancementProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
76TH
EVERGREEN
99TH 212T
H50TH
18TH
119TH
39TH
63RD
78TH
15TH
83RD
6TH
20TH 38TH
HAZE
L DEL
L
139TH
33RD
117TH
COLUMBIA
86TH
INGLE
97TH
25TH
MCGILLIVRAY
87TH
182N
D
88TH
54TH
134TH
13TH
172N
D
ANDR
ESEN
34TH
26TH
139TH
39TH
172N
D
119TH
18TH
99TH 72ND
1ST112T
H
WARD
137T
H
LAKE
63RD
VICINITY MAPLEGEND
DOWNTOWN QUIET ZONE
Remove at-grade rail crossings or install crossing protection at several downtown intersections sotrains will not blow horns in downtown Vancouver. Work at 8th & Jefferson Complete. Work atHill & 11th on hold. Recently added work at the Chelsea RR crossing (to be completed in 2014)
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
TRANS-DT-822PROJECT ID:
2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT EXTENT: TO:
$200,000.00Total Proj. Cost:
Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:
Const. Admin. Cost:
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.
102
2015-2020 Transportation Improvement Program
Arterial Map Update
103
New Designation: RecommendationSoutheast Evergreen Highway (176th to East City Limits) Add as collector arterialNortheast 94th Avenue (54th to 58th Street)
Add as collector arterialRedesignation:
STREETS - ARTERIAL CLASSIFICATION CHANGES
6 YEAR TRANSPORTATION IMPROVEMENT PROGRAMArterial Map Update
(2015-2020)
104
105
2015-2020 Transportation Improvement Program
Glossary
106
Transportation Improvement Program 2015-2020 Glossary Page 1
GGLLOOSSSSAARRYY OOFF FFRREEQQUUEENNTTLLYY UUSSEEDD TTEERRMMSS AANNDD AACCRROONNYYMMSS
ACP
Annual Construction Program.
ADA
Americans with Disabilities Act.
ADT
Average Daily Traffic.
AIP
Arterial Improvement Program (TIB funding Program).
Access Access is a means of approach to provide vehicular or pedestrian entrance or exit to a property. This may not necessarily include all movements.
Access Management
Access management is the process of providing and managing access to land development while preserving the regional flow of traffic in terms of safety, capacity, and speed.
A.M. Peak Hour
A.M. peak hour is identified by a one hour period in the morning when traffic flow increases. The a.m. peak hour typically occurs between 6:30 a.m. and 9:00 a.m. Traffic volumes occurring during the a.m. peak hour are used to calculate the overall operation of a roadway or intersection.
ARRA
American Recovery and Reinvestment Act. Also call “economic stimulus package,” ARRA was enacted by the 111th Congress in February 2009. The act provides $28.35 billion for improving and maintaining transportation infrastructure throughout the United States.
Arterial
An arterial is a major street carrying the traffic of local and collector streets to and from freeways and other major streets. Arterials generally have traffic signals at intersections and may have limits on driveway spacing and street intersection spacing.
107
2015-2020 Transportation Improvement Program Page 2 Glossary
Biological Assessment A biological assessment is an environmental document required for compliance with the Endangered Species Act for projects with federal funding or permits.
CAT
Citizen Advisory Team.
CCRP Corridor Congestion Relief Program (State funded).
CDBG Community Development Block Grant. Block grants are targeted for low and moderate-income areas. Improvements usually consist of sidewalk and capital improvement programs.
CMAQ
Congestion Mitigation and Air Quality Improvement (Federal funding source). This funding is for projects that create a direct air quality benefit, leading toward attainment or maintenance of a National Ambient Air Quality Standard (NAAQS).
CN
Construction.
CTL
Center Turn Lane.
C-TRAN
Clark County Public Transportation Benefit Area Authority, the transit agency for Clark County, Washington.
CWP
Clean Water Program
Capacity
The maximum rate of flow at which vehicles can be reasonably expected to traverse a point or uniform segment of a lane or roadway during a specified time period under prevailing roadway, traffic, and control conditions; usually expressed as vehicles per hour.
In the project list spreadsheets Capacity is a term used to describe a subset of projects that upgrade existing substandard streets to urban arterial standards. This subset of projects typically improves more than just vehicle capacity. They also improve the pavement section, street lighting, bicycle, pedestrian, and ADA facilities.
108
Transportation Improvement Program 2015-2020 Glossary Page 3
Collector Streets – Urban Collector
Collectors – Urban Collector. “Urban collector” provides for land access and traffic circulation within and between residential neighborhoods, and commercial and industrial areas. Direct access to adjacent land uses, however, is still subordinate to traffic movement. Access to abutting properties is controlled through the use of raised channelization, driveway spacing and pavement markings. Typically, collectors are not continuous for any great length, nor do they form a connected network by themselves.
Comprehensive Plan
A long-range plan, typically looking 20 to 50 years into the future, which is intended to guide growth and development of a community. Comprehensive Plans are required by the Growth Management Act for specific counties and cities in Washington State. The Plans establish goals and policies for managing population growth and land development while ensuring that the growth is adequately served by public facilities.
Concurrency
The Concurrency ordinance (VMC 11.95) was adopted in response to the Washington State Growth Management Act, which required local jurisdictions to adopt level-of-service (LOS) standards for the arterial road system and to ensure maintaining those standards when considering new development. This process is called Concurrency. Concurrency applies to any development, land division, site plan, and conditional use permit approvals.
EA
Environmental Assessment.
Environmental Review
The consideration of environmental factors as required by the Washington State Environmental Policy Act (SEPA). The environmental review process is the procedure used by agencies and others under SEPA for giving appropriate consideration to the environment in agency decision-making. (WAC 197-11-746).
Enhancement
In the project list spreadsheets Capacity is a term used to describe a subset of projects that upgrade pedestrian or bicycle facilities, or otherwise enhance the livability of the community through upgrades to the street system.
ESA
The Endangered Species Act was established in 1973 to preserve ecosystems of endangered and threatened species. The Act was recently amended to include various species of fish, wildlife, and plants throughout the United States.
109
2015-2020 Transportation Improvement Program Page 4 Glossary
Growth Management
A group of strategies used by a government to direct the timing, location and type of development in a community.
Growth Management Act (GMA)
The State of Washington's Growth Management Act was adopted in 1990 to address the negative consequences of unprecedented population growth and suburban sprawl in the State. The GMA requires all cities and counties in the State to do some planning and has more extensive requirements for the largest and fastest-growing counties and cities in the State. Its requirements include guaranteeing the consistency of transportation and capital facilities plans with land use plans.
HES
Hazard Elimination System/Safety (Federal Funding Source). The objective of this fund is to improve specific locations which constituted a danger to vehicles or pedestrians as shown by frequency of accidents.
HIS-HRRP
In 2008, a portion of the funding provided through Federal Transportation Act SAFETEA-LU was made available for safety grants. Funds were provided through the Highway Safety Improvement Program (HSIP) and the High Risk Rural Roads Program (HRRRP).
HOV
High Occupancy Vehicle.
Impacts
‘Impacts’ are the effects or consequences of actions. Environmental impacts are effects upon the elements of the environment.
Interchange
A system of interconnecting roadways in conjunction with one or more grade separations, providing for the movement of traffic between two or more roadways on different levels.
Intersection
The general area where two or more roadways join or cross, within which are included the roadway and roadside facilities for traffic movements in that area.
ITS
Intelligent Transportation System.
Land Use
110
Transportation Improvement Program 2015-2020 Glossary Page 5
The type of activity associated with a specific geographic area. Land use categories can be broad (e.g., residential, retail, office, industrial, and recreational), or they can be very specific (e.g., single-family residential, convenience market, or elementary school). In order to estimate trip generation characteristics for a specific geographic area, it is necessary to know both the type and intensity of land use (e.g., single-family residential land use at a development intensity of eight units per acre).
Level of Service (LOS)
The Level of Service is a grading system developed by the transportation profession to quantify the degree of comfort (including such elements as speed, travel time, number of stops, total amount of stopped delay, and impediments caused by other vehicles) afforded to drivers as they travel through an intersection or roadway segment. LOS is expressed as a letter grade that ranges from “A”, indicating that drivers will experience little, if any delay, to “F”, indicating significant traffic congestion and driver delay will occur.
MVFT Motor Vehicle Fuel Tax.
Mitigation
(1) Avoiding impacts altogether by not taking a certain action or parts of an action; (2) minimizing impacts by limiting the degree or magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; (3) rectifying impacts by repairing, rehabilitating, or restoring the affected environment; (4) reducing or eliminating impacts over time by preservation and maintenance operations during the life of the action; (5) compensating for impacts by replacing, enhancing or providing substitute resources or environments; and/or, (6) monitoring impacts and taking appropriate corrective measures (WAC 197-11-768).
Mode The means by which travel is accomplished. Alternative modes of travel include walking, bicycling, auto, bus, light rail, airplane, ferry, etc.
NAAQS
The National Ambient Air Quality Standards were set up by the Environmental Protection Agency (EPA) to help mitigate the health impacts of air pollution. EPA established NAAQS measure for six pollutants that include carbon monoxide, ozone, particulate matter, lead, sulfur dioxide, and nitrous oxide.
Non-attainment Area
Geographic area in which air pollution levels exceed the NAAQS.
Peak Hour
A period of 60 consecutive minutes during which an intersection or roadway system experiences the greatest amount of traffic volume.
111
2015-2020 Transportation Improvement Program Page 6 Glossary
P.M. Peak Hour
A one hour period in the afternoon or evening when traffic flow increases. The p.m. peak hour typically occurs between 4 and 6 p.m. Traffic volumes occurring during the p.m. peak hour are used to calculate the overall operation of a roadway or intersection.
PE
Preliminary Engineering.
PSE
Plans, Specifications, and Estimates.
PSMP
Pedestrian Safety and Mobility Program.
PWB
Public Works Board. The Public Works Board was created by the 1985 Legislature. The Board is comprised of local government officials, special purpose district representatives, and private sector members. The mission of the Washington State Public Works Board is “to assist Washington’s local governments and private water systems in meeting their public works needs to sustain livable communities.” The Board is authorized to loan money to counties, cities, and special purpose districts to repair, replace, or create domestic water systems, sanitary sewer systems, storm water systems, roads, streets, solid waste and recycling facilities, and bridges.
PWTF
Public Works Trust Fund. This trust fund is administered by the Public Works Board. The PWTF Construction and Pre-construction Loan Programs provide funds to design, repair, replace, or create a facility. These loans have a 5 to 20-year term with an interest rate of only one-half percent. The maximum for any agency is ten million dollars per biennium.
RCW
The Revised Code of Washington contains all the laws of the state of a general and permanent nature.
REET
Real-estate Excise Tax.
RTC
Southwest Washington Regional Transportation Council. RTC is the regional transportation planning agency for Clark, Klickitat, and Skamania counties.
112
Transportation Improvement Program 2015-2020 Glossary Page 7
WW&RP Washington Wildlife and Recreation Program.
Right-of-Way/ROW
Right-of-way is property held by the City for existing or future public roads or other public improvements.
Roadway Conditions
The geometric characteristics of the street or highway, including the type of facility and its development environment, the number of lanes (by direction), lane and shoulder widths, lateral clearances, design speed, and horizontal and vertical alignments.
Roadway
A roadway is the improved portion of an easement or right-of-way, excluding curbs, sidewalks and ditches. Road, roadway and street will be considered interchangeable terms.
Roadway Section
A roadway section is a cross-section of a roadway which displays, travel lanes, turning lanes, bike lanes, sidewalks, and medians with their respective dimensions. Each classification of roadway has a corresponding roadway section.
SAFETEA-LU
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). With guaranteed funding for highways, highway safety, and public transportation totaling $244.1 billion, SAFETEA-LU represents the largest surface transportation investment in our Nation’s history. The two landmark bills that brought surface transportation into the 21st century—the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21st Century (TEA-21)—shaped the highway program to meet the Nation’s changing transportation needs. SAFETEA-LU builds on this firm foundation, supplying the funds and refining the programmatic framework for investments needed to maintain and grow our vital transportation infrastructure.
SEPA
State Environmental Policy Act. SEPA is a state law requiring agencies to consider the environmental consequences of their decisions. (WAC 197-11-790).
STP
Surface Transportation Program (Federal funding source). The objective of the STP is to fund construction, reconstruction, resurfacing, restoration and rehabilitation of roads functionally classified as arterials.
113
2015-2020 Transportation Improvement Program Page 8 Glossary
STP-C
Surface Transportation Program – Competitive Grant.
STP-E
Surface Transportation Program – Enhancement Grant.
STP-TMA
Surface Transportation Program – Transportation Management Area Grant.
Signal Warrant
A criterion that must be met before the installation of a traffic signal can be considered.
Significant/Significance
1) ‘Significant’ as used in SEPA means a reasonable likelihood of more than a moderate adverse impact on environment quality.
2) Significance involves context and intensity and does not lend itself to a formula or quantifiable test. The context may vary with the physical setting. Intensity depends on the magnitude and duration of an impact. The severity of an impact should be weighed along with the likelihood of its occurrence. An impact may be significant if its chance of occurrence is not great, but the resulting environmental impact would be severe if it occurred. (WAC 197-11-794).
SWCAA
Southwest Washington Clean Air Agency, is a government agency responsible for air pollution control and planning in Clark, Cowlitz, Lewis, Skamania, and Wahkiakum Counties.
SYS
Traffic Signal System Improvement.
TBD
To Be Determined.
TDM
Transportation Demand Management is a demand-based technique for reducing traffic congestion, such as ride-sharing programs and flexible work schedules enabling employees to commute to and from work outside of peak hours.
TEA-21
114
Transportation Improvement Program 2015-2020 Glossary Page 9
The Transportation Equity Act for the 21st Century was signed on June 9, 1998, superseding the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. This bill provides Federal Transportation dollars for Federal, State and Local agencies. The majority of benefits associated with ISTEA are continued or expanded upon through TEA-21. Also, see SAFETEA-LU.
TIB
The Transportation Improvement Board is a state funding agency and administers several state funding programs. The mission of the TIB is to assist local agencies to preserve and improve transportation systems by providing financial assistance, supporting economic development, promoting multi-jurisdictional and multi-modal coordination and to promote public/private cooperation.
TIF
Transportation Impact Fee. TIF is the traffic impact component of a development impact fee. An impact fee is a fee levied on a developer by the county as compensation for expected effects of the development.
TIMACS
Transportation Information Management and Control System.
TIP
Six-Year Transportation Improvement Program.
TPP
Transportation Partnership Program (TIB Funding Program).
TS
Traffic Signal Project.
TSNS
Traffic Safety Near Schools.
TSO Traffic Signal Optimization.
UAP Urban Arterial Program (State funding source) formally known as the Arterial Improvement Program. This program was established by the State in 1967 as the Urban Arterial Trust Account (UATA) and was designated as the AIP in July 1999. The purpose of this program is to fund city and urban county arterial road and street projects to reduce congestion and improve safety, geometrics, and structural concerns.
115
2015-2020 Transportation Improvement Program Page 10 Glossary
UCP
Urban Corridor Program (State funding source) formally known as the Transportation Partnership Program. This program was established by the State in 1988 as the Transportation Improvement Account (TIA) and was designated as the TPP in July 1999. The purpose of the program is to fund projects on the regional transportation plan that are necessitated by existing or future congestion due to economic growth.
UR-SP
Urban Sidewalk Program (State funding source) formally known as the Pedestrian Safety and Mobility Program. This program was established by the TIB in 1994 as the Pedestrian Facilities Program (TIA-PFP) and was designated as the PSMP in July 1999. The program goal is to enhance and promote pedestrian mobility by providing funding for pedestrian projects that provide access and connectivity of pedestrian facilities.
V/C Ratio
The ratio of volume to capacity for a traffic facility.
Volume
The number of vehicles passing a point on a lane or roadway during some time interval, often taken to be one hour, but may also be expressed in terms such as sub-hourly, daily, or annually.
WAC
Washington Administrative Code. The WAC is laws adopted by state agencies to implement state legislation.
WSDOT
Washington State Department of Transportation. WSDOT is a department of the State of Washington responsible for transportation related planning, management, and coordination.