1850TSS-320_160_agenda

Preview:

DESCRIPTION

1850TSS-320_160_agenda

Citation preview

All Rights Reserved © Alcatel-Lucent 2006, #####

TRAINING PLAN for 1850TSS320/160 and 1662SMC

June, 2014

All Rights Reserved © Alcatel-Lucent 2009TSS320/160 | June2014

Agenda

- Day 1 & 2 1850TSS320/160 & 1662SMC

Equipment Overview Equipment provisioning – NE overview Cross-connection management Ethernet services OAM : loopback, Synchronisation Alarms and Performance monitoring Software download and backup-Restore

All Rights Reserved © Alcatel-Lucent 20093TSS320 Rel 3.0 TMPLS | January 2009

- Day 2 &3

Hands on Equipment-Practices.(Gulliver site).

At the end of day 3 the trainee should be able to do/perform

Cross-connection management Ethernet services OAM : loopback, Synchronisation Alarms and Performance monitoring Software download and backup-Restore

All Rights Reserved © Alcatel-Lucent 2006, #####

1850TSS320/160 and 1662SMC Training

Stephen Ondari

stephen.ondari@alcatel-lucent.com

June 2014