Ref. No.- RELLIRTS/50MW RESCO(Bihar)/2018-19/ E6 n
M/s Suryam International Pvt. Ltd., 2" Lane Gandhi Nagar, Berhampur, Odisha- 760001
Date: 04.10.2018
Subject: Notification of Award (NOA) for Implementation of 1.220 KWp Grid Connected Roof Top and Small Solar Power Plants Programme for Government buildings pertaining to different ministries in the state of Bihar under RESCO Model.
Dear Sir,
With reference to above, M/s Rajasthan Electronics & Instruments Limited (herein after referred to as 'REM,' on behalf of) is pleased to place NOA on M/s Suryam tternational Pvt. Ltd. (herein after referred to as `Developer') for subject work as per all the terms and couditions and provisions of Tender Ref. No. REIL/B1D/RTS(C)/2018-19/002 dated 25.06.2018, for a levelized Tariff of Rs. 4.05 per kWh (Four Rupees and Five paise only) inclusive of GST for 25 years. The details are given below.
1.0 REFERENCE
This has reference to the following:
1.1 Our Notice Invitation Tender (NIT) dated 25.06.2018.
1.2 Bidding documents for the subject package issued vide our NIT No.- REIL/BID/RTS(C)/2018-19/002 dated 25.06.2018 and tender ID- 201 8 REIL 352814_1 .
1.3 Amendments to Bidding Document issued vide our Corrigendum No.-1—(Pre-bid reply) dated 12.07.2018, and Corrigendum No.-2 dated 18.07.2018.
1.4 Clarifications to the Bidding Documents, pursuant to pre-bid conference held 05.07.2018, issued vide our clarifications dated 12.07.2018.
2.0 AWARD OF CONTRACT AND ITS SCOPE
2.1 We confirm having accepted bid of the developer (referred to at para 1.3 & 1.4 above) read in conjunction with all the specifications, terms & conditions of the bidding documents (referred to at Para 1.2 above) , and award on the developer the Contract (also referred to as the " Project " or" Scheme") for performance of all activities, as set forth in the documents, viz. Implementation of 50 MWp Grid Connected Roof Top and Small Solar Power Plants Programme for Government Buildings in different States/ Union Territories of India under RESCO model. The scope of work inter- alia includes the following:
"Site Survey, Design , Engineering, Manufacture, Supply, Storage, Civil work, Erection, Testing & Commissioning of the Grid Connected Rooftop Solar PV Project including Operation & Maintenance (0 & M) of the project for a period of 25 (Twenty Five) Years under RESCO Model after Operational Acceptance".
The Scope of the Work would essentially cover, but not limited to Site Survey of Identified Roof Tops and Surplus Land / Identification of New Roof Tops and surplus land, Site Visit, Solar Potential Assessment, Finalization of plant capacity for Identified Locations, execution of PPA (as per the prescribed format given in the NIT) Design, Engineering, Supply, Storage, Civil work, Erection, Testing, Commissioning, Inter-connections with the grid for net metering as per state/UT Policies, Obtaining No Objection Certificate (NOC) from Distribution Company (DISCOM) for grid connectivity obtaining all statutory approvals, quality control of the grid connected rooftop Solar PV Project including Operation and Maintenance (0 & M) of the project for a period of 25 years after commissioning of project.
Registered Office : 2, Kanakpura Industrial Area, JAIPUR -302 012 (Raj.) INDIA Tel. : +91-141-2470363, 2470271, 2470784, 2470176 (Electronics) 2470908 (RE), 2471083 (MM) Fax: +91-141-2470139 E-Mail : reiljp@sancharnet.in • Website : www.reiljp.com
Alk frA-.)
DM 671
.14 I, I ISO 9001 REOISItRID3
117MTRI etv bi •cmg p‘-47• s Rajasthan Electronics & Instruments Limited (An ISO 9001:2008 & 14001:2004 "Mini Ratna" Public Sector Enterprise)
Homm,„„„„„,„,„, 111111A1[111, „,„„„„„„„„„, 11111
Any addIonal modification work of the roof tops in order to implement the system/ project shall be in the scope of deveoper. The scope of work under this NOA shall also include all such items which are not specifically mentioned in the Bidding Documents and/ or your bid but are necessary for the successful completion of the scope under the Contract for the Implementation of 1,220 kWp Grid Connected Roof Top and Small Solar Power Plants Programme for Government Buildings in state of Bihar under RESCO model unless otherwise specifically excluded in the bidding documents or in this NOA.
2.2 You shall be liable solely and severally for the execution of the Project in accordance with terms and conditions of the bidding documents.
3.0 ALLOCATED CAPACITY ALONG WITH PROJECT COST.
3.1 The details of allocated capacity along with project cost as per the following break-up:
State Capacity (in kWp) Levelized Tariff Rs./kWh (In INR) including GST for 25 years
Bihar 1,220 4.05
3.2 The benchmark cost of the project is considered as given in the table below:
S. No. Category Bench mark Cost/ kWp
1 1 kWp — 10 kWp Rs. 60,000/- per kWp
2 10.1 kWp — 100 kWp Rs. 55,000/- per kWp
3 100.1 kWp —500 kWp Its. 53,000/- per kWp
3.3 The incentive structure applicable is tabulated below: -
S. No. Achievement vis-à-vis Target Allocation
Incentives for Bihar State
1 80% and above within the sanctioned Period
25% of benchmark cost or INR 13,750/- per kWp, whichever is lower
2 Below 80% and upto 50%(Including 50 %) within the sanctioned period
15% of benchmark cost or 1NR 8,250/- per kWp, whichever is lower
3 Below 50% and above 40 %( Including 40%) within the sanctioned period.
10% of benchmark cost or INR 5,500/- per kWp, whichever is lower
4 Below 40% within the sanctioned period Nil
3.4 The incentives indicated above are subject to revision by MNRE from time to time. REIL/Owner will not be responsible for any delay and/or non-payment of incentive by MNRE.
Registered Office : 2, Kanakpura Industrial Area, JAIPUR -302 012 (Raj.) INDIA Tel. : +91-141-2470363, 2470271, 2470784, 2470176 (Electronics) 2470908 (RE), 2471083 (MM) Fax: +91-141-2470139 E-Mail : reiljp©sancharnet.in • Website : www.reiljp.com
DAM
ISO .001 REGISTERED ISO 11001 REGISTERED
itta
..„„„„m„,„„„ INNA[11, 111011111111111111111111
,ar‘ TRWR $c" 1n1 Oki 717g Cel 11 8
Rajasthan Electronics & Instruments Limited (An ISO 9001:2008 & 14001:2004 "Mini Ratna" Public Sector Enterprise)
4.0 DISBURSEMENT OF INCENTIVE
The incentive shall be disbursed as follows
The incentive shall be released after commissioning of the project and submission of Project Commissioning Reports (PCRs) in SPIN portal at the end of sanction period and submission of original audited Statement of Expenditure (SOE). The developer will also make the sites/premises available for inspection by MNRE/REIL or its designated team/agency. Minimum 40% of the sanctioned capacity has to be installed in order to avail incentives.
67% (2/3rd) of the amount mentioned in the table in clause 3.3 above shall be disbursed after successful demonstration of the desired PR of 75% against Successful Commissioning and acceptance of project and balance 33% (1/3rd) of the amount mentioned as per the table in clause 3.3 against successful demonstration of the desired CUF of 15% for Bihar after completion of first year of successful 0 & M., if project is commissioned in sanctioned time. In case of non-achievement of above mentioned milestones (first at commissioning and second at first year of 0 & M), no incentive shall be disbursed. However, REIL may extend an option to developer for re-demonstrations of performance parameters after due rectification at its sole discretion well within the timelines. If the developer fails to demonstrate the required Performance Parameters after due rectification as well, the entire incentive will not be disbursed.
Similarly, incentive amount shall be disbursed as per Annexure-III of this NIT for delayed commissioning proportionate to the eligible amount.
REIL may consider releasing Incentive on case to case basis depending on the actions taken by the Developer and subject to meeting the following conditions:
1) The rooftop and ground mounted SPV power plant should be completed as per the Scope of NIT.
2) The building on which rooftop SPV power plant is installed has the required strength to hold the weight of the plant
3) The SPV power plant must get CEIG inspection certificate. 4) Intimate the concerned DISCOMs regarding implementation of grid connected roof top and
ground mounted solar PV projects as per the given format in Annexure-M and submit the copy of same to REIL for the purpose of release of Incentive.
5.0 PERFORMANCE SECURITY / PERFORMANCE BANK GURANTEE (PBG):
5.1 Within 30 days from the date of issuance of NOA, developer shall furnish the Performance Security for the allocated capacity only. PBG shall be submitted for different states. The formula applicable to calculate the PBG amount will be:
For Bihar: PBG amount = (Rs. 13.75 Lakh) X Allocated Capacity in MWp in a State.
5.2 All other conditions laid in Clause 3.13 PERFORMANCE SECURITY / PERFORMANCE BANK GUARANTEE (PBG) of Part-II Instructions to Bidders (ITB).
5.3 For MSME Developers
If MSME developer does not submit the performance bank guarantee as per clause 3.13 of Part - II ITB of NIT, it shall be blacklisted from all tenders of REIL or shall have to pay a penalty equivalent of EMD amount with subsequent interest calculated as 1.25 % per month on EMD amount from the date of bid submission.
Registered Office :2, Kanakpura Industrial Area, JAIPUR -302 012 (Raj.) INDIA Tel. : +91-141-2470363, 2470271, 2470784, 2470176 (Electronics) 2470908 (RE), 2471083 (MM) Fax: +91-141-2470139 E-Mall : reiljp@sancharnet.in • Website www.reiljp.com
150 101 REMSTERED
ISO 14401 REGISTERED
tz:44.Thrit:
DRIV
1111111111111111111111111111 1WkeIR s ctv 1 ett-i 'cnig
Rajasthan Electronics & Instruments Limited (An ISO 9001:2008 & 14001:2004 "Mini Ratna" Public Sector Enterprise) 111111111 11111 1111111 1111
6.0 SCHEDULES FOR COMPLETION OF PROJECT / SANCTION PERIOD
The schedules for completion of project shall be 07 (Seven) months from the date of NOA i.e. on or before 03.05.2019. Duration of the O&M shall be for a firm period of 25 (Twenty Five) years from the date of commencement of the O&M Contract.
If the Developer commissions less than 40 % of the sanctioned project within specified time i.e. on or before 03.05.2019, no incentive shall be disbursed. However, further period of 06 (Six) months shall be allowed to developer for completion of entire unexecuted allocated capacity. After 06 months [ i.e. after 03.11.2019], the entire project will get cancelled and the total PBG would be forfeited.
7.0 INITIAL ALLOCATION OF BUILDINGS
For facilitating Developer, a list of sites in Bihar indicating location/address/tentative roof top size/ approximate capacity potential etc. is enclosed at Annexure-I.
The capacity is estimated considering 1 kWp = 10 Sq Mtr to 15 Sq Mtr. However, in actual scenario it may very as per the actual site conditions such as type of roof, shading, free space availability, load conditions etc. Accordingly, the indicative Solar Roof Top Potential may also very.
The list is purely indicative. This indicative list has been prepared by REIL after assessment along with the building addresses and the states which it belongs to. Based on the above, the initial allocation has been made as per methodology stipulated in original tender document including its amendments and clarifications. Though due care has been taken in such allocation, successful developers are requested to ascertain the buildings/land, feasibility of space including their capacities allocated to them and signing of PPA Agreement in consultation with the owner of the building upon allocation by REIL. In case of any discrepancies in the allocation of buildings/ land capacities, developer is requested to factor those discrepancies prior to giving acceptance of NOA. The final installation capacity shall be sanctioned by REIL based on submission of Project Sanction Documents to REEL.
The initial allocation of buildings/ land shall be indicative and valid for 14 (Fourteen) days only from the date of issuance of NOA. The developers may submit their consent/ project sanction documents to REIL during this initial 14 (Fourteen) days for the allocated buildings/land. After 14 (Fourteen) days from NOA, Developer has to execute the Project on the allocated building(s)/ land as per the capacity given in the NOA. In case of change in capacity as per the consent/ project sanction documents submitted by the developer final revised capacity shall be accorded by REIL to developer.
In case the Developer does not want to execute the allocated capacity or non-fulfilment of any of the conditions mentioned above under Clause no. 7 till 02.05.2019, claim against PBG for the unexecuted capacity(ies) shall be collected by REIL.
8.0 SANCTION OF PROJECT
After submission of project sanction documents by the Developer and accepted by REIL, REIL will issue the sanction letter(s) for the project(s) indicating the incentive amount(s) which will be disbursed in line with the provisions of the NIT document including its amendment(s). The developer shall complete the entire scope of the work within the due date i.e. 03.05.2019.
9.0 PMC CHARGES OF REM
PMC charges of REIL shall be computed as 5% of the MNRE benchmark cost minus incentives). The above charges are exclusive of GST which shall be paid extra as per applicable norms.
Registered Office : 2, Kanakpura Industrial Area, JAIPUR -302 012 (Raj.) INDIA Tel. : +91-141-2470363, 2470271, 2470784, 2470176 (Electronics) 2470908 (RE), 2471083 (MM) Fax: +91-141-2470139 E-Mail : reiljp@sancharnetin • Website : www.reiljp.com
1111111111111111111111111111 we, TIWRAT4 *a ctv ctiti -Rug rii:Wr PIRA s Rajasthan Electronics & Instruments Limited (An ISO 9001:2008 & 14001:2004 "Mini Ratna" Public Sector Enterprise) 1111111111111111111111 11111
PMC Charges of REIL shall be remitted at the time of submission of Project Sanction documents i.e. prior to execution of the project. Since, the incentive amount cannot be ascertained at the time of submission of project sanction documents, developer shall pay 5% of the MNRE benchmark cost at the time of project sanction document. The balance amount shall be refunded depending on the amount of eligible incentive amount after commissioning of capacity allocated.
10.0 LIQUIDATED DAMAGES
If the developer fails to commission the project within the sanction time then Liquidated Damages on per day basis will be calculated and will be claimed against the Performance Security on a 06 (Six) months period basis. After six (6) Months the Project will get cancelled and the total PBG amount would be forfeited.
Calculation of LD
Example: If a project of 1 MWp in General Category State is delayed by 36 days then the Liquidated Damages will be levied as given below: Liquidated Damages = [(Performance Security)/180 Days]*delayed days = (13,75,000/180)*36 = INR 275,000/-
11.0 Developer has to follow all the MNRE guidelines for Roof top installation under incentive scheme including the capacity on roof/land while deciding the final capacity.
12.0 This Notification of Award constitutes formation of the Contract and comes into force with effect from the date of issuance of this NOA.
13.0 All other terms and conditions including technical specifications and details shall be as per the bidding documents No.-REIL/BID/ RTS(C)/ 2018-19/ 002 Dated 25.06.2018 and its amendments.
14.0 The NOA is being issued to you and we request you to return its Xerox copy duly signed and stamp on each page including the enclosed annexure-I as a token of your acknowledgement within 14 days from the date of its issuance.
Please take the necessary action to commence the work under our intimation.
Yours faithfully
For and on behalf of
Rajasthan Electronics & Instruments Ltd.,
PI SH PALIWAL EXECUTIVE DIRECTOR (PROJECTS)
Registered Office : 2, Kanakpura Industrial Area, JAIPUR -302 012 (Raj.) INDIA Tel. : +91-141-2470363, 2470271, 2470784, 2470176 (Electronics) 2470908 (RE), 2471083 (MM) Fax : +91-141-2470139 E-Mail : reiljp@sancharnet.in • Website : www.reiljp.com
190 0001 REGISTERED ISO 14001 REGISTERED
CF-t\-;\
NG !VS 11.7 IVir V RfA C '21 DM/ livAESS4
Annexure-I
RAJASTHAN ELECTRONICS & INSTRUMENTS LIMITED, JAIPUR
LIST OF SITES IN BIHAR FOR RTS PROJECT IMPLEMENTATION
S No
Institute/ CPSE
State Location Address of Site Contact Person at Site
Contact Detail Shadow free area (sq.m.)
KW Potential
1 GSI Bihar Patna GSI, Lohiya Nagar, Kankarbagh, Patna
Sh. R.K. Singh
8544419019 300 20
2 AIR Bihar Patna MIB, AIR, Chajjubagh, Patna
Md.lmtayaj . 1500 150
3 AIR Bihar Patna MIB, AIR Transmitterjethuli Patna
Md.lmtayaj - 1100 110
4 AIR Bihar Patna MIB, AIR Staff Quarters,Jethuli, Patna
Md.lmtayaj - 1000 100
5 DDK Bihar Patna MIB, DDK Transmitter,BahadurpurK anti Factory, Patna
GK DAS(Assistan t Engineer)
- 2000 200
6 DDK Bihar Patna MIB, DDK, Staff Quarters, Chajjubagh Patna, Patna
G K Das (Assistant Engineer)
- 300 30
7 ESIC Bihar Patna ESI Hospital, Rohtas, Dalmia Nagar, Bihar
- 1500 150
8 Bihar Patna Regional Office,Near Consumer Court, R Block, Opp MLA Flat, Serpentine Road, Road No.6, Patna, Bihar 800001, Patna
Manish Mani 0612-2506043 200 20 EPFO
9 HPT Bihar Katihar DD HPT-Katihar, Station Engineer Doordarshan HPT Mirchalbari,Katihar- 854106, Bihar
Sh D S Prasad, AE
9431814664, 06452-239274, ddehptktr@gmail. COM
360 30
10 HPT Bihar Saharsa DD HPT-Saharsa, Diwari Asthan, Saharsa , Bihar 852 201
Sh Jawed Anjum, AE Daya Sankar Prasad(DE)
9431087496, 06478-290172, sedmcpur@rediff mail.com Ph No.-9431814664
260 20
II DDK Bihar Muzaffar pur
DDK-Kali Mandir Doordarshan Kendra, Near Nehru maidan ,Sikandarpur, Muzaffarpur, Bihar-842003
Sh R. Sahani AE
9431461661, 0621-2217408, ddeddlcmuz@gmai I.com
393 30
12 DDK Bihar Patna DDK, In front of 113131 Bank, Fraser Road area, Patna Bihar-800026
D.K.Srivastav DD(E)
ddeddlcpatna@gm ail.com
1820 150
13 ESIC Bihar Patna ESIC Model Hospital, E- 58,Aniswad jadco path road, B-Sector,Haroon Nagar Birla colony, Phulbari Sharif Patna-801505
Shri Arvind Kumar (RD ESI Corporation)
Ph no.- 06122521928 Rd- bihar@esic.nic.in
2038 150
14 ESIC Bihar Katihar ESIC BO, Try Petrol station, cash machine counter Argara Chowlc, Katihar, Bihar-854105
Shri Arvind Kumar (RD PSI Corporation)
Ph no.- 06122521928 Email: rd-bihar@esic.nic.in
130 10
15 ESIC Bihar Patna ESIC regional Office Income Tax circle pancheep Bhawan Kidwaipur Postalcolony, Bailey Road Patna, Bihar -800001
Shri Arvind Kumar (RD ESI Corporation)
Ph no.- 06122521928 Rd- bihar@esic.nic.in
720 30
16 DDK HPT
Bihar Patna DD HPT, TV Tower Mahatma Gandhi Nagar, BH Colony Chitragupta Nagar, Patna Bihar-800026
D.K.Srivastav DD(E)
ddeddkpatna@gm ail.com
260 20
Total 13881 1220
Recommended