深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production...

Preview:

Citation preview

深圳市迪威泰实业有限公司SHENZHEN D-VITEC INDUSTRIALS CO.,LTD.

Profile of production line

Made Varify Approve

Haihui ou

Jun yang

13 / 5 / /

1 、 Plant View2 、 Meeting room3 、 Development department4 、 Development laboratory5 、 Laboratory for approving new product6 、 Goods receiving and inspection area7 、 Incoming control8 、 Controlling for warehouse of raw incoming9 、 Production control10 、 Inspection of finished product11 、 Warehouse control of finished product

Catalogue

1 、 Plant View(1)

1 、 Plant View(2)

Meeting room

2 、 Meeting room

Development department

3 、 Development department

4 、 Development laboratory ( 1 )

Monitor Test power supply, oscilloscope

4 、 Development laboratory(2)

Reliability laboratory

5 、 Laboratory for approving new product(1)

Reliability laboratory

5 、 Laboratory for approving new product(2)

Constant temperature and humidity testing machine

5 、 Laboratory for approving new product(3)

Drop test machine

5 、 Laboratory for approving new product(4)

Rain tester

5 、 Laboratory for approving new product(5)

Salt spraying tester

5 、 Laboratory for approving new product(6)

Lens testing area

5 、 Laboratory for approving new product(7)

Incoming inspection area

6 、 Goods receiving and inspection area

IQC incoming inspection area

7 、 Incoming control(1)-Incoming inspection room

Unqualified area

Inspection waiting area Qualified area

7 、 Incoming control(2)- Division of incoming inspection area

IQC incoming inspection platform

7 、 Incoming control(3)-Incoming inspection platform

Place for sample of IQC incoming inspection, drawing and acknowledgment

7 、 Incoming control(4)- Sample, drawing and acknowledgment

Place for tooling equipment of IQC incoming inspection

7 、 Incoming control(5)- inspection tooling area

Caliper

thread gauge

block gauge

 plug gage

7 、 Incoming control(6)-Incoming inspection tool

digital electric bridge

frequency recorder

test patterns

Multimeter

7 、 Incoming control(7)-Incoming inspection equipment

IQC Incoming inspection program

7 、 Incoming control(8)-Incoming inspection program

7 、 Incoming control(9)- sampling standard

IQC incoming sample standard method

IQC inspection sheet

7 、 Incoming control(10)- inspection sheet

Electronic raw material warehouse

8 、 Controlling for warehouse of raw incoming(1)-Electronic warehouse

Temperature and humidity Control sheet for electronic warehouse

8、 Controlling for warehouse of raw incoming (2) -Temperature and humidity control of electronic warehouse

Cabinet with Temperature and humidity Control of electronic warehouse

8、 Controlling for warehouse of raw incoming (3)- Temperature and humidity

Control for critical element

dehumidifier

8 、 Controlling for warehouse of raw incoming (4)- Damp proof control of electronic warehouse

dehumidifier

vacuum package equipment

8、 Controlling for warehouse of raw incoming (5)- antiseptic and damp proof control of electronic warehouse vacuum package equipment

hardware and packing raw material warehouse

8、 Controlling for warehouse of raw incoming (6)- hardware and packing material warehouse

FIFO control label

8 、 Controlling for warehouse of raw incoming (7)- FIFO control

FIFO control document

8 、 Controlling for warehouse of raw incoming ( (8)- FIFO control

USB assemble line

Material receiving area

DVR assemble line

Place for clearing sensor and sticking filter

9 、 Production control(1)-production line

Finished product and semi-finished product aging shelf

Camera assemble line

Product adjusting line

USB aging shelf

9 、 Production control(2)-production line

Pre-Inspection Area

Final inspection position

Qualified finished product area

packing line

9 、 Production control(3)-production line

Place for instrument and equipment

Place for temporary storage of finished product

place for tool&equipment

place for tool&equipment

9 、 Production control ( 4 ) - tool&equipment

九、 Production control( 5 )—— electric screwdriver and ferrochrome controlSpot check record of electric screwdriver Spot check record of ferrochrome

9 、 Production control( 6 ) -Spot check record of electric screwdriverstate of spot check for electric screwdriver

9、 Production control( 7 ) - control of dust-free for important position in production line

Dust-free room for sticking filter

9、 Production control ( 8 ) - control of dust-free for important position in

production line

Dust-free room for sticking filter

9、 Production control ( 9 )— equip with dust-free control for important

position in production line

Clear the dust-free position before installing housing

Aging test room

9 、 Production control ( 10 )— aging test control

Aging test room

9 、 Production control ( 11 )— aging test controlChecklists for temperature and humidity in aging test room

9 、 Production control ( 12 )—— aging test control

Process of product aging test

9 、 Production control ( 13 )—— aging test control

Record list of product aging test

QA inspection area of finished product

10 、 Inspection of finished product(1)- QA sampling area

Test patterns

Illumination testing box

color card

equipment for testing

10 、 Inspection of finished product ( 2 )—— QA sampling area

QA inspection process

10 、 Inspection of finished product ( 3 ) -inspection process

QA sampling method of finished product

10 、 Inspection of finished product ( 4 ) -sampling method

Place for QA files QA inspection files for finished product

10 、 Inspection of finished product ( 5 ) - inspection file and report

Place for finished product

11 、 Warehouse control of finished product(1)- finished product warehouse

Place for storing goods will be shipping

11 、 Warehouse control of finished product(2)- finished product warehouse

11 、 Warehouse control of finished product(3)-temperature and humidity control

Control chart of temperature and humidity for warehouse

dehumidifier

11 、 Warehouse control of finished product(4)-damp proof control for warehouse

dehumidifier

Thank you!

Recommended