BASIC OF WORK STUDY, JOB DESIGN &
WORK MEASUREMENT
BY
YASHESH MORKHIA -> 816
KARTHIK NADAR -> 818
AKSHAY PATIL -> 819
SWAPNIL PRADHAN -> 820
APEKSHA ->821
WORK STUDY
INTRODUCTION WITH INCREASING COMPLEXITIES OF THE
TECHNOLOGICAL WORLD, NEED TO SIMPLIFY THE WORK SYSTEM HAS BEEN INCREASING DAY BY DAY.
WORK STUDY IS AN AREA OF KNOWLEDGE THAT ADDRESSES THE PROBLEM OF WORK SIMPLIFICATION WITH THE BASIC OBJECTIVES OF
PRODUCTIVITY ENHANCEMENT, HUMAN COMFORT & SAFETY
EVOLUTION OF WORK STUDY
• F.W.TAYLOR: FOUNDER OF MODERN METHOD AND TIME STUDY.
• TAYLOR BEGAN HIS TIME STUDY WORK IN 1881.
• HE ESTABLISHED THAT EACH JOB SHOULD HAVE A STANDARD TIME, DETERMINED BY TIME STUDIES.
• IN THE TIMING PROCESS TAYLOR ADVOCATED DIVIDING THE WORK INTO SMALL DIVISIONS OF
• EFFORT KNOWN AS ELEMENTS.
• TIME WAS OBTAINED FOR THESE ELEMENT INDIVIDUALLY AND THEIR COLLECTIVE VALUES WERE
USED TO DETERMINE THE ALLOWED TIME FOR THE TASK.
WORK OF GILBERTH
• GILBRETH IS CONSIDERED AS THE FOUNDER OF ‘MODERN MOTION STUDY TECHNIQUE’.
• WHICH IS DEFINED AS THE STUDY OF BODY MOTIONS USED
IN PERFORMING AN OPERATION FOR THE PURPOSE OF
IMPROVING THE OPERATION BY : ELIMINATING UNNECESSARY MOTIONS
SIMPLIFYING NECESSARY MOTIONS
THEN ESTABLISHING THE MOST FAVORABLE MOTION SEQUENCE FOR MAXIMUM EFFICIENCY
IMPORTANCE:-
• ENHANCING THE PRODUCTION EFFICIENCY OF THE FIRM.
• TECHNIQUE TO IDENTIFY NON-VALUE OPERATIONS.
• ONLY ACCURATE AND SYSTEMATIC PROCEDURE ORIENTED TECHNIQUE.
• HAS GOT UNIVERSAL APPLICATION.
DEFINITION “WORK STUDY IS DEFINED AS THAT BODY OF KNOWLEDGE CONCERNED WITH THE ANALYSIS OF THE WORK METHODS AND THE EQUIPMENT USED IN PERFORMING A JOB, THE DESIGN OF AN OPTIMUM WORK METHOD AND THE STANDARDIZATION OF PROPOSED WORK METHODS.”
PREREQUISITES FOR CONDUCTING WORK STUDY
STEPS INVOLVED IN WORK STUDY1. SELECT
Job Or Process To Be Studied
2. RECORDAll the details concerning job using various Recording Techniques
3. EXAMINERecorded facts critically by asking questions like who, what, when,
why
4. DEVELOPMost economical method
5. MEASUREThe amount of work involved and set standard time to do that job
6. DEFINENew method and standard time
7. INSTALLThe new method as a standard practice
8. MAINTAINNew method as agreed standards
PRINCIPLES OF WORK STUDY
1.MUST COME FROM THE TOP LEVEL MANAGEMENT.
2.PEOPLE MADE AWARE OF THE OBJECTIVES AND THE NEED OF THE EXERCISING SUCH STUDY.
3.METHOD STUDY MUST PRECEDE WORK MEASUREMENT .
OBJECTIVES• TO ANALYZE THE PRESENT METHOD OF DOING A JOB, SYSTEMATICALLY IN ORDER TO DEVELOP A NEW AND BETTER METHOD.
• TO MEASURE THE WORK CONTENT OF A JOB BY MEASURING THE TIME REQUIRED TO DO THE JOB FOR A QUALIFIED WORKER AND HENCE TO ESTABLISH STANDARD TIME.
• TO INCREASE THE PRODUCTIVITY BY ENSURING THE BEST POSSIBLE USE OF HUMAN, MACHINE AND MATERIAL RESOURCES AND TO ACHIEVE BEST QUALITY PRODUCT/SERVICE AT MINIMUM POSSIBLE COST.
• TO IMPROVE OPERATIONAL EFFICIENCY.
• TO REDUCE WASTE THROUGH STANDARDIZATION OF WORK ELEMENTS OF A JOB.
• TO IMPROVE LABOR EFFICIENCY.
COMPONENTS / TECHNIQUES OF WORK STUDY
WORK STUDY
METHOD STUDY•Motion Study : Examine the job and finding more efficient method to perform it
WORK MEASUREMENT•Time Study : Determine the time necessary to perform a job and its elements
BENEFITS OF WORK STUDY INCREASED PRODUCTIVITY AND OPERATIONAL EFFICIENCY
REDUCED MANUFACTURING COSTS
IMPROVED WORK PLACE LAYOUT
BETTER MANPOWER PLANNING AND CAPACITY PLANNING
FAIR WAGES TO EMPLOYEES
BETTER WORKING CONDITIONS TO EMPLOYEES
IMPROVED WORK FLOW
REDUCED MATERIAL HANDLING COSTS
PROVIDES A STANDARD OF PERFORMANCE TO MEASURE LABOUR
EFFICIENCY
BETTER INDUSTRIAL RELATIONS AND EMPLOYEE MORALE
BASIS FOR SOUND INCENTIVE SCHEME
PROVIDES BETTER JOB SATISFACTION TO EMPLOYEES
ADVANTAGES OF METHOD STUDY
• WORK SIMPLIFICATION
• IMPROVED WORKING METHOD ( CHEAPER METHOD)
• BETTER PRODUCT QUALITY
• IMPROVED WORK PLACE LAYOUT
• IMPROVED EQUIPMENT DESIGN
• BETTER WORKING CONDITIONSDISADVANTAGES OF METHOD STUDY
• HIGH OPERATING COST
• HIGH WASTAGE & SCRAP
• EXCESSIVE MOVEMENT OF MATERIALS AND WORKMEN
• EXCESSIVE PRODUCTION BOTTLENECKS
• EXCESSIVE REJECTIONS AND REWORK
• COMPLAINTS ABOUT QUALITY
WORK MEASUREMENT
DEFINATION :-
• “THE APPLICATION OF TECHNIQUES DESIGNED TO ESTABLISH THE TIME FOR A QUALIFIED WORKER TO CARRY OUT A SPECIFIED JOB AT A DEFINED LEVEL OF PERFORMANCE”
OBJECTIVES OF WORK MEASUREMENT :-
• 1. COMPARING ALTERNATIVE METHODS
• 2. ASSESSING THE CORRECT INITIAL MANNING (MANPOWER REQUIREMENT PLANNING)
• 3. PLANNING AND CONTROL
• 4. REALISTIC COSTING
• 5. DELIVERY DATE OF PLANNING
• 6. COST REDUCTION AND COST CONTROL
• 7. IDENTIFYING SUBSTANDARD WORKERS
• 8. TRAINING NEW EMPLOYEES.
TECHNIQUES OF WORK MEASUREMENT :-
• 1) REPETITIVE WORK:- THE TYPE OF WORK IN WHICH THE MAIN OPERATION OR GROUP OF OPERATIONS REPEAT CONTINUOUSLY DURING THE TIME SPENT AT THE JOB. THESE APPLY TO WORK CYCLE OF EXTREMELY SHORT DURATION.
• 2) NON-REPETITIVE WORK:- IT INCLUDE SOME TYPE OF MAINTENANCE AND CONSTRUCTION WORK, WHERE CYCLE ITSELF IS HARDLY EVER REPEATED IDENTICALLY.
VARIOUS TECHNIQUES:-
1)TIME STUDY
2) SYNTHESIS
3) WORK SAMPLING
4) ANALYTICAL ESTIMATION
5)PREDETERMINED MOTION AND TIME STUDY.
TIME STUDY
• TIME STUDY IS WORK MEASUREMENT TECHNIQUE FOR RECORDING THE TIMES AND RATES OF WORKING FOR THE ELEMENTS OF A SPECIFIED JOB CARRIED OUT UNDER SPECIFIED UNDER SPECIFIED CONDITIONS
STEPS IN MAKING TIME STUDY:-
1)SELECT (SELECTING JOB FOR WORK STUDY)
2)OBTAIN & RECORD (DETAILS REGARDING METHODS,OPERATOR, JOB AND WORKING CONDITION)
3)DEFINE (THE ELEMENT, BREAK THE JOB INTO CONVENIENT FOR TIMING)
4)MEASURE (TIME DURATION FOR EACH ELEMENT AND ASSESS THE RATING)
5)EXTEND (OBSERVED TIME INTO NORMAL TIME {BASIC TIME})
6)DETERMINED (RELAXATION AND PERSONAL ALLOWANCES)
7) COMPUTE (STANDARD TIME FOR THE OPERATION FOR DEFINED JOB OR OPERATION.)
TYPES OF ELEMENT
• A REPETITIVE ELEMENT – IS AN ELEMENT WHICH OCCURS IN EVERY WORK CYCLE OF THE JOB.
•
AN OCCASIONAL ELEMENT - DOES NOT OCCUR IN EACH WORK CYCLE OF THE JOB, BUT WHICH MAY OCCUR AT REGULAR OR IRREGULAR INTERVALS. E.G. MACHINE SETTING.
• A CONSTANT ELEMENT - THE BASIC TIME REMAINS CONSTANT WHENEVER IT IS PERFORMED. E.G. SWITCH THE MACHINE ON.
• A VARIABLE ELEMENT - IS AN ELEMENT FOR WHICH THE BASIC TIME VARIES IN RELATION TO SOME CHARACTERISTICS OF THE PRODUCT, EQUIPMENT OR PROCESS, E.G. DIMENSIONS, WEIGHT, QUALITY ETC. E.G. PUSH TROLLEY OF PARTS TO NEXT SHOP.
• MANUAL ELEMENT - IS AN ELEMENT PERFORMED BY A WORKER.
• MACHINE ELEMENT - IS AUTOMATICALLY PERFORMED BY A POWER-DRIVEN MACHINE (OR PROCESS).
• GOVERNING ELEMENT - OCCUPIES A LONGER TIME THAN ANY OF THE OTHER ELEMENTS WHICH ARE BEING PERFORMED CONCURRENTLY. E.G. BOIL KETTLE OF WATER, WHILE SETTING OUT TEAPOT AND CUPS.
• FOREIGN ELEMENT - IS OBSERVED DURING A STUDY WHICH, AFTER ANALYSIS, IS NOT FOUND TO BE NECESSARY PART OF THE JOB. E.G. DEGREASING A PART THAT HAS STILL TO BE MACHINED FURTHER.
TYPES OF ELEMENT
ALLOWANCES
• RELAXATION ALLOWANCES
• VARIABLE ALLOWANCES
• INTERFERENCE ALLOWANCES
• CONTINGENCY ALLOWANCES
• POLICY ALLOWANCES
Personal Allowance
Constant Fatigue
Allowance
Variable Fatigue
Allowance
Fatigue Allowance
Total Allowance
Normal Time
Standard Time
Policy Allowance
If applicable
ContingenceAllowance
RelaxationAllowance
VARIOUS ALLOWANCES TO BUILD STANDARD TIME
EXAMPLE ON HOW TO CALCULATE STANDARD TIME:
WORK MEASUREMENT
• STANDARD TIME IS USED IN:• COSTING THE LABOR COMPONENT OF
PRODUCTS
• TRACKING EMPLOYEE PERFORMANCE
• SCHEDULING & PLANNING REQUIRED RESOURCES
SETTING STANDARD TIMES• STEP 1: CHOOSE THE SPECIFIC JOB TO BE STUDIED
• STEP 2: TELL THE WORKER WHOSE JOB YOU WILL BE STUDYING
• STEP 3: BREAK THE JOB INTO EASILY RECOGNIZABLE UNITS
• STEP 4: CALCULATE THE NUMBER OF CYCLES YOU MUST OBSERVE
• STEP 5: TIME EACH ELEMENT, RECORD DATA & RATE THE
WORKER’S PERFORMANCE
• STEP 6: COMPUTE THE NORMAL TIME
• STEP 7: COMPUTE THE STANDARD TIME
EXAMPLE :-
WORK SAMPLING:-
WORK SAMPLING WAS ORIGINALLY DEVELOPED BY L.H.C. TIPPETT IN BRITAIN IN 1934 FOR THE BRITISH COTTON INDUSTRY RESEARCH BOARD.
DEFINATION:-
A TECHNIQUE IN WHICH A STATISTICALLY COMPETENT NUMBER OF INSTANTANEOUS OBSERVATIONS ARE TAKEN, OVER A PERIOD TIME, OF A GROUP OF MACHINES,PROCESSES OR WORKERS.
WORK SAMPLING HAS THREE MAIN APPLICATIONS:-
1) ACTIVITY AND DELAY SAMPLING:- TO MEASURE THE ACTIVITIES AND DELAYS OF WORKERS AND MACHINES.
2) PERFORMANCE SAMPLING:- TO MEASURE WORKING TIME AND NON WORKING TIME OF A PERSON ON A MANUAL WORK AND TO ESTABLISH A PERFORMANCE INDEX OR PERFORMANCE LEVEL FOR A PERSON DURING HIS WORKING TIME.
3) WORK MEASUREMENT:- UNDER CERTAIN CIRCUMSTANCES, TO MEASURE MANUAL TASK THAT IS TO ESTABLISHED A TIME STANDARD FOR AN OPERATION.
Job design – process by which managers decide individual job tasks and authority
Job redesign – process by which managers reconsider what employees are expected to do
The well-being of organizations and people relates to how well management designs jobs
WHAT IS JOB DESIGN
DEFINITION OF JOB DESIGN
Def: Job Design is the process of deciding on the content of a job in terms of its duties and responsibilities; on the methods to be used in carrying out the job, in terms of techniques, systems and procedures and on the relationships that should exist between the job holder and the superiors, subordinates and colleagues.
GOALS OF JOB DESIGN
1. Major Concern2. Purpose of Job Design3. Affect on Employee4. Impact
DESIGN FACTOR
• LAYOUT OF EQUIPMENT AND SEATING
• INSTRUMENT DISPLAY DESIGN
• COMPATIBILITY
• CONTROL DESIGN CHARACTERISTICS
ENVIRONMENTAL FACTORS
• TEMPERATURE AND HUMMIDITY
• VIBRATION
• NOISE
VISUAL ENVIRONMENT
• LIGHTING
• VENTILATION
• BEHAVIOURAL DIMENSIONS OF JOB DESIGN
• JOB ROTATION
• JOB ENLARGEMENT
• JOB ENRICHMENT
JOB ROTATION: JOB ENLARGEMENT:JOB ENRICHMENT:
• JOB ROTATION: REFERS TO THE MOVEMENT OF AN EMPLOYEE FROM ONE JOB TO ANOTHER.
• PLEASE NOTE: JOBS THEMSELVES ARE NOT ACTUALLY CHANGED, ONLY EMPLOYEES ARE ROTATED AMONG VARIOUS JOBS.
• JOB ENLARGEMENT• WHEN A JOB IS ENLARGED THE TASKS BEING PERFORMED ARE EITHER ENLARGED OR SEVERAL
SHORT TASKS ARE GIVEN TO ON WORKER, THUS THE SCOPE OF THE JOB IS INCREASED BECAUSE THERE ARE MANY TASKS TO BE PERFORMED BY THE SAME WORKER.
• JOB ENRICHMENT:• JOB ENRICHMENT AS IS CURRENTLY PRACTICED ALL OVER THE WORK IS A DIRECT OUTGROWTH
OF HERZBERG’S TWO FACTOR THEORY OF MOTIVATION.
APPROACHES TO JOB DESIGN
• ENGINEERING APPROACH:
• HUMAN APPROACH:
• JOB CHARACTERISTICS APPROACH:
ENGINEERING APPROACH:
• THE WORK OF EVERY WORKMAN IS FULLY PLANNED OUT BY THE MANAGEMENT AT LEAST ON DAY IN ADVANCE AND EACH MAN RECEIVES IN MOST CASES COMPLETE WRITTEN INSTRUCTIONS, DESCRIBING IN DETAIL THE TASK WHICH HE/SHE HAS TO ACCOMPLISH-FW TAYLOR.
• PROBLEM WITH THIS APPROACH: REPETITION-MECHANICAL PACING-NO END PRODUCT-LITTLE SOCAL INTERACTION-NO INPUT
HUMAN APPROACH:
• THE HUMAN RELATIONS APPROACH RECOGNIZED THE NEED TO DESIGN JOBS WHICH ARE INTERESTING AND REWARDING.
• HERZBERG’S RESEARCH POPULARIZED THE NOTION OF ENHANCING NEED SATISFACTION THROUGH WHAT IS CALLED JOB ENRICHMENT.
• FACTORS INVOLVED:
• MOTIVATORS LIKE ACHIEVEMENT, RECOGNITION, WORK ITSELF, RESPONSIBILITY, ADVANCEMENT AND GROWTH AND HYGIENIC FACTORS.
• ACCORDING TO HERZBERG. THE EMPLOYEE IS DISSATISFIED WITH THE JOB IF REQUIRED MAINTENANCE FACTORS TO THE REQUIRED DEGREE ARE NOT INTRODUCED INTO THE JOB.
JOB CHARACTERISTICS APPROACH
• THEORY BY HACKMAN AND OLDHAM STATES THAT EMPLOYEES WILL WORK HARD WHEN THEY ARE REWARDED FOR THE WORK THEY DO AND WHEN THE WORK GIVES THEM SATISFACTION.
• HENCE INTEGRATION OF MOTIVATION, SATISFACTION AND PERFORMANCE WITH JOB DESIGN.
• ACCORDING TO THIS APPROACH JOB CAN BE DESCRIBED IN TERMS OF FIVE CORE JOB DIMENSIONS:
1. SKILL VARIETY
2. TASK IDENTITY
3. TASK SIGNIFICANCE
4. AUTONOMY
5. FEEDBACK
JOB DESIGN PROCESS:
• JOB DESIGN PROCESS HAS TO START FROM WHAT ACTIVITY NEEDS TO BE DONE IN ORDER TO ACHIEVE ORGANIZATIONAL GOALS.
• IT REQUIRES USE OF TECHNIQUES LIKE WORK-STUDY, PROCESS PLANNING, ORGANIZATIONAL METHODS AND ORGANIZATIONAL ANALYSIS AND ALSO TECHNICAL ASPECTS
THANK YOU