38
HORSESHOE PARK CONCEPTUAL HORSESHOE PARK CONCEPTUAL MASTER PLAN MASTER PLAN HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVAL MASTER PLAN APPROVAL

Horseshoe Park Master Plan - Cosumnes CSD

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Horseshoe Park Master Plan - Cosumnes CSD

HORSESHOE PARK CONCEPTUAL HORSESHOE PARK CONCEPTUAL MASTER PLANMASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Page 2: Horseshoe Park Master Plan - Cosumnes CSD

Horseshoe park (9.1 acres) is located in phase one of Laguna Ridge Development on Denali Circle

Nearby Parks include Storybook Woods 1.8 acres and Island Park 2.3 acres.

PARK LOCATION

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

ISLAND PARK2.3 ACRES

STORYBOOK WOODS PARK1.8 ACRES

HORSESHOE PARK9.1 ACRES

Whitelock Parkway

Big H

orn Blvd

Page 3: Horseshoe Park Master Plan - Cosumnes CSD

Located adjacent drainage channel Connected to trail system

SITE ANALYSIS

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

Park Site

School Site

Drainage Channel

Trail

Page 4: Horseshoe Park Master Plan - Cosumnes CSD

CITY/CSD MASTER PLAN DESIGN PRINCIPLES

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

HORSESHOE PARK (9.1 ACRE) IS DEFINED AS NEIGHBORHOOD PARK (3-10 ACRES)

A NEIGHBORHOOD PARK TYPICALLY INCLUDES THE FOLLOWING AMENITIES:

PLAYGROUND TARGETED FOR AGES 2-5 AND 5-12 SOME SHADED PLAY ELEMENTS W/SWINGS SMALL WATER PLAY AREA/ OTHER SPECIAL AMENITY NON- PROGRAMMED SPORTS FIELD/OPEN SPACE SPORT COURT (1 or 2 Small) PICNIC AREA W/SHELTER LOOP TRAIL RESTROOM - DEPENDS ON AMENITY LIMITED PARKING - 10 SPACES OR SIZED TO AMENITY BENCHES, LANDSCAPINGADA COMPLIANT AMENITIES

LIGHTING – SECURITY LIGHTING ONLY LAND USE 85% ACTIVE 15% PASSIVE

Page 5: Horseshoe Park Master Plan - Cosumnes CSD

22 PARTICIPANTS

POWERPOINT PRESENTATION (Avail on Website)

PARTICIPANTS WORKED IN GROUPS

4 CONCEPTUAL PLANS

4 RESIDENTS PROVIDED COMMENTS VIA E-MAIL

October 15th Community Meeting #1

HORSESHOE PARK HORSESHOE PARK COMMUNITY OUTREACHCOMMUNITY OUTREACH

Page 6: Horseshoe Park Master Plan - Cosumnes CSD

October 15th Community Meeting #1

4 Group Plans

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

Page 7: Horseshoe Park Master Plan - Cosumnes CSD

All groups included playgrounds, picnic areas with shade All groups included playgrounds, picnic areas with shade structures, horseshoe courts, a small parking lot and jogging structures, horseshoe courts, a small parking lot and jogging trails. trails.

(3) Tennis Courts (3) Tennis Courts (3) Adult Fitness(3) Adult Fitness (3) Quiet area w/ native/butterfly/butterfly type display garden (3) Quiet area w/ native/butterfly/butterfly type display garden (2) Water Play(2) Water Play (2) Restroom(2) Restroom (2) Half Court Basketball Court(2) Half Court Basketball Court (2) Non-programmed ball field(2) Non-programmed ball field (2) Skate Elements(2) Skate Elements (1) Volleyball Court(1) Volleyball Court (1) Non- programmed multi-purpose field (1) Non- programmed multi-purpose field

DESIGN RECAP – TOP ELEMENTS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Page 8: Horseshoe Park Master Plan - Cosumnes CSD

Shade is very important – over play structures, large picnic structures, Shade is very important – over play structures, large picnic structures, lots of large treeslots of large trees

Include sculptures/artwork to compliment “horseshoe/western” theme Include sculptures/artwork to compliment “horseshoe/western” theme

Keep it a neighborhood park – no programmed fields or sport league Keep it a neighborhood park – no programmed fields or sport league activities, limit parking/restroom facilitiesactivities, limit parking/restroom facilities

Concerned about traffic on Denali – ask City to consider adding Traffic Concerned about traffic on Denali – ask City to consider adding Traffic CalmingCalming

Do not locate Basketball Courts near homesDo not locate Basketball Courts near homes

Make sure there is connection to existing trails, provide Decomposed Make sure there is connection to existing trails, provide Decomposed Granite with mile markersGranite with mile markers

Provide therapeutic play opportunities for Children with Disabilities Provide therapeutic play opportunities for Children with Disabilities

DESIGN RECAP – General Comments

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Page 9: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

NOVEMBER 19TH MEETING

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

PICNIC/PLAY AREA

Page 10: Horseshoe Park Master Plan - Cosumnes CSD

PLAY AREAS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

SEPARATE 2-5 and 5-12 PLAY AREAS

CENTRAL AND SAFE LOCATION

SMALL WATER PLAY AREA

COMBINATION OF RESILIENT SURFACING AND WOOD FIBER

PLAYGROUND ADJACENT TO PICNIC AREA, SHADE STRUCTURE, TABLES AND BENCHES

HORSESHOE/ WESTERN THEME PAVING PATTERNS RUSTIC POST AND RAIL FENCE SHADE STRUCTURES WESTERN THEMED PLAY PIECES

Page 11: Horseshoe Park Master Plan - Cosumnes CSD

WESTERN/ HORSESHOE THEME

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Western Themed Poured in Place paving

Horse play sculpture Post & Rail Fence around Play Area

Western Themed Play Equipment

Page 12: Horseshoe Park Master Plan - Cosumnes CSD

2- 5 PLAY AREA

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Some portions of play area covered w/ shade sails

Team See-Saw

Springer ToysTown Train Station

Page 13: Horseshoe Park Master Plan - Cosumnes CSD

5- 12 PLAY AREA

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Quad Pod SpinnerLarge Play structure

SupernovaClimbing Boulder

Page 14: Horseshoe Park Master Plan - Cosumnes CSD

SENSORY PLAY AREAS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Musical Instruments

Hanging Pod

Accessible Tactile Panels

Page 15: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

WATER PLAY

Page 16: Horseshoe Park Master Plan - Cosumnes CSD

WATER PLAY AREA

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

WESTERN STAR DESIGN

SMALL & LOW FLOW FEATURES

SURROUNDED BY SEATWALL

USER ACTIVATED FEATURES

ZERO DEPTH NON-SLIP SURFACE

Small Water Features

Page 17: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

PICNIC AREA

Page 18: Horseshoe Park Master Plan - Cosumnes CSD

PICNIC AREA

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Secondary Shade Structure

Large Western Themed Shade Structure

Oversized Sculptural/Seating Western Theme

Small 2 Stall Restroom

Page 19: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

NATURE GARDEN AREA

Page 20: Horseshoe Park Master Plan - Cosumnes CSD

NATURE GARDEN AREA

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Animal Sculptures signify habitat landscapes

Native/ Drought Tolerant Garden

Dry Creek & storm water runoff retention

Outdoor musical instruments

Page 21: Horseshoe Park Master Plan - Cosumnes CSD

SPORTS COURTS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

TENNIS COURT

HORSESHOE COURTS

HALF COURT BASKETBALL

Page 22: Horseshoe Park Master Plan - Cosumnes CSD

SPORTS COURTS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Mounds & planting for visual and noise buffer

Half –courtNo lighting

(2) Tennis CourtsFenced w windscreenNo lights

4 Horseshoe Courts w/ separate shade structure & benches

Page 23: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

TRAILS AND ADULT FITNESS

Page 24: Horseshoe Park Master Plan - Cosumnes CSD

TRAILS & ADULT FITNESS

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Outdoor fitness equipment Fitness equipment located along trails

Connections made to existing trail system

Decomposed Granite Paths circumnavigate Entire park site – maximum distance .4 miles

Page 25: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKCOMMUNITY OUTREACHCOMMUNITY OUTREACH

NON-PROGRAMMED OPEN SPACE

Page 26: Horseshoe Park Master Plan - Cosumnes CSD

NON –PROGRAMMED OPEN SPACE

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Non programmed multi-purpose field for soccer, baseball, Frisbee, flying a kite etc. Approx 200 x 200

Small Arched Backstop Benches No Dug Outs or Bleachers

Page 27: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPTUAL MASTER PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

ENTRY PLAZA & PARKING LOT

Page 28: Horseshoe Park Master Plan - Cosumnes CSD

ENTRY PLAZA & PARKING LOT

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

10 Space Parking Lot

Decorative Paving atEntry Plaza

Large Western Themed Park sign

Benches

Page 29: Horseshoe Park Master Plan - Cosumnes CSD

LANDSCAPING

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

LARGE CANOPY SHADE TREES

SHRUBS AND GROUNDCOVERS – LOW GROWING, DROUGHT TOLERANT, LOW MAINTENANCE

PLANTS WITH SEASONAL COLOR TO COMPLIMENT THE PLAYGROUND AND SHADE STRUCTURE

PLANTS WITH TEXTURE, COLOR AND SEASONAL INTEREST

GRASS MOUNDING

Page 30: Horseshoe Park Master Plan - Cosumnes CSD

November 19th Meeting

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

MOST OF THE 23 PARTICIPANTS SUPPORTED THE PLAN AS PRESENTED

SOME RESIDENTS WERE CONCERNED THAT THE BASKETBALL COURTS WERE LOCATED TOO CLOSE TO THEIR HOUSES

STAFF RESPONDED THAT THE COURTS COULD BE MOVED TO THE SOUTH OF THE PARK WHERE THERE WERE NO HOUSES FACING ON TO THE PARK

Page 31: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPT PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

Basketball Court Location

Revised Basketball Court Location

Move backstop to North slightly

DG trail connector

New Basketball Court Location

Page 32: Horseshoe Park Master Plan - Cosumnes CSD

November 19th Meeting

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

ONE RESIDENT WANTED THE RESTROOM AND/OR THE WATER PLAY REMOVED

STAFF RESPONDED Restroom is small, w/ two stalls and is self locking after hours. No history of problems at similar installations at other parks Restroom is needed as a convenience for parents of small children using the water play. CSD master plan guidelines allow for small restroom. Attendees at previous Laguna Ridge meetings were told this park would have a water play amenity.

Page 33: Horseshoe Park Master Plan - Cosumnes CSD

November 19th Meeting

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

SAME RESIDENT REQUESTED THAT PLAY AREA BE MOVED TO THE SOUTH WEST OF PARK AWAY FROM DIRUSSO CIRCLE

STAFF RESPONDED Play area is over 200 feet from houses. Play area is located so there is some visibility from surrounding streets Relocating play area would require rearrangement /elimination of other amenities.

200 ft

Page 34: Horseshoe Park Master Plan - Cosumnes CSD

November 19th Meeting

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL

A MAJORITY OF THE 22 ATTENDEES SUPPORTED MOVING THE BASKETBALL COURT

MOST ATTENDEES SUPPORTED RETAINING THE RESTOOM AND WATER PLAY

MOST ATTENDEES SUPPORTED KEEPING THE PLAY AREA IN THE PRESENT LOCATION

CONCEPTUAL MASTER PLAN WAS PLACED UP ON WEBSITE FOR FURTHER COMMUNITY INPUT (Through Dec 8th)

CSD RECEIVED A TOTAL OF 5 EMAIL COMMENTS 4 OF WHICH REQUESTED REMOVAL OF THE RESTROOM AND/OR WATER PLAY

STAFF RECOMMENDS KEEPING RESTROOM, WATER PLAY AND PLAY AREA IN PRESENT LOCATION AND MOVING BASKETBALL COURT

Page 35: Horseshoe Park Master Plan - Cosumnes CSD

FUNDING

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

Park Development in Laguna Ridge is entirely funded by the City administered Supplemental Park Fee program –No CSD funds required.

City reimburses CSD staff time to prepare plans and specifications and provide construction support for each park project.

Construction budget is $2.7 million

Park maintenance entirely funded by City CFD. CSD is paid by City to maintain the park.

Laguna Ridge parks are jointly owned by the City and the CSD.

Page 36: Horseshoe Park Master Plan - Cosumnes CSD

NEXT STEPS – HORSESHOE PARK

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

Construction Drawings – January 2014 to Fall 2014

Project Out to Bid – Winter 2014

Construction – Spring 2015 to Fall 2015

Park Open – Late Fall 2015

Page 37: Horseshoe Park Master Plan - Cosumnes CSD

NEXT STEPS – HORSESHOE PARK

HORSESHOE PARK HORSESHOE PARK MASTER PLAN APPROVALMASTER PLAN APPROVAL

Construction Drawings – January 2014 to Fall 2014

Project Out to Bid – Winter 2014-15

Construction – Spring 2015 to Fall 2015

Park Open – Late Fall 2015

Page 38: Horseshoe Park Master Plan - Cosumnes CSD

CONCEPT PLAN

HORSESHOE PARKHORSESHOE PARKMASTER PLAN APPROVALMASTER PLAN APPROVAL