Page 1 2008-08-15 OPS-G Forum Boris Smeds OPS-GSY The new ESTRACK Santa Maria Ground station for support of Ariane 5 launch of ATV. Head of Systems and Project Support Section

OPS Forum SMA Validation PtII 15.08.2008

Embed Size (px)

DESCRIPTION

This seminar will provide an overview of the new ESTRACK ground station at Santa Maria, Azores, and its first operational usage for the ATV launch in March. Santa Maria station was established to support the Ariane 5 launch of ATV that took place in March this year.

Citation preview

Page 1: OPS Forum SMA Validation PtII 15.08.2008

Page 1

2008-08-15 OPS-G Forum

Boris Smeds OPS-GSY

The new ESTRACK Santa Maria Ground station for support of

Ariane 5 launch of ATV.

Head of Systems and Project Support Section

Page 2: OPS Forum SMA Validation PtII 15.08.2008

Page 2

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

The Santa Maria Station is presented by:

Part 1 Boris Smeds OPS-GSY

Overview of requirements and technical implementation Specific differences compared to a conventional satellite

ground station Lessons learned, unexpected problems and how they

were solved

Part 2 Gerhard Billig OPS-ONV

Test and validation Operational concept, preparations and launch operation

Page 3: OPS Forum SMA Validation PtII 15.08.2008

Page 3

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Requirements Receive telemetry data from Ariane 5 during the launch of ATV and send to

Kourou in real time.

Cover the passes over the Atlantic region.

Santa Maria Azores

Page 4: OPS Forum SMA Validation PtII 15.08.2008

Page 4

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Time scale of actual implementation. April 2006: Site Inspection

June 2006: SoW for antenna and related equipment. ITT

September 2006: PDR for antenna, TM system and power plant

November 2006: CDR for antenna and TM system

March 2007: Start of Factory Acceptance Tests

April 2007: Shelter and TM equipment installation at Santa Maria

July 2007: Commissioning of Powerplant

October 2007: Start of antenna commissioning at Santa Maria

December 2007 / January 2008: Antenna fully validated for AR5

Page 5: OPS Forum SMA Validation PtII 15.08.2008

Page 5

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Station system overview

Inmarsat

ISDN

Groundstation

Ariane-5 TM Kit

CSG/Kourou

Antenna

S-b

and

Program Track

VoiceInterface

TM ReceiverFrame sync,

Timestamping

AntennaControl Unit

Voice

Pointing(DO)

S-band

Decommutation,CVI Extraction

TM

CVI

Ground commsInterface

AntennaPointing

Telephone

Servo

LNA

Down-Converter

Tracking RX(Dual Frequency)

S-band S-band

Auto Track

Timing

Frequencyand

Time

Test signal

S-band

Page 6: OPS Forum SMA Validation PtII 15.08.2008

Page 6

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

X-band option

To allow reception of Earth observation satellites in the 8025-8400 MHz band the antenna is equipped with a dual feed and dichroic sub-reflector.

Page 7: OPS Forum SMA Validation PtII 15.08.2008

Page 7

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Major differences compared to satellite RF-links

Dual frequency transmission. One antenna on each side of the spinning launcher

Telemetry modulation: frequency shift (not CCSDS) , no remnant carrier. 1 Mbps

No Kepler orbit during launcher propulsion phase. Continuous position updates that may have large errors.

High angular velocity due to close distance ( 180 km , 7 km/s)

Communication using HDLC protocol

ISDN and Inmarsat satellite link to Kourou

Page 8: OPS Forum SMA Validation PtII 15.08.2008

Page 8

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Existing concrete platform

Page 9: OPS Forum SMA Validation PtII 15.08.2008

Page 9

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Equipment shelter and Telemetry kit

Reuse existing design of TM-kit developed for Ariane tracking network by Carlo Gavazzi Space

Page 10: OPS Forum SMA Validation PtII 15.08.2008

Page 10

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Calibration tower

Guests on existing tower at Pico Alto

Page 11: OPS Forum SMA Validation PtII 15.08.2008

Page 11

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Antenna supplied by Indra Espacio. Assembly at factory. Partly new design. 5.5 m dish, Carbon fibre

Page 12: OPS Forum SMA Validation PtII 15.08.2008

Page 12

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Antenna installed at Santa Maria

X-Y mount (no singularity at zenith)

Inmarsat antenna

Radio link to calibration tower

Page 13: OPS Forum SMA Validation PtII 15.08.2008

Page 13

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Murphy’s law

If anything can go wrong, it will.

Page 14: OPS Forum SMA Validation PtII 15.08.2008

Page 14

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Filters required to reject UMTS ( mobile phone )

Filters supplied from US company.

Delayed delivery due to ITAR

Receive band

Page 15: OPS Forum SMA Validation PtII 15.08.2008

Page 15

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems, wrong paint.

Glossy paint was used on the reflector. Feed cover burnt when pointing to the sun during G/T tests.

Repainting of reflector required

Page 16: OPS Forum SMA Validation PtII 15.08.2008

Page 16

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems, autotrack patterns

Error in computer simulation of antenna pattern for the autotrack feed. Actual pattern gave larger angular offset than expected.

Original feed design

Page 17: OPS Forum SMA Validation PtII 15.08.2008

Page 17

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems, autotrack patterns

Computer simulation

Page 18: OPS Forum SMA Validation PtII 15.08.2008

Page 18

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Antenna tracking pattern measured

Error signal

Page 19: OPS Forum SMA Validation PtII 15.08.2008

Page 19

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

New feed New feed design solved the issue.

4 lateral dipoles closer together. Sum signal generated by combining signals from the lateral dipoles.

Page 20: OPS Forum SMA Validation PtII 15.08.2008

Page 20

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Antenna tracking pattern new feed

Error signal

Page 21: OPS Forum SMA Validation PtII 15.08.2008

Page 21

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems, bad cables

RF cables after Low noise amplifier with 60 dB gain with damaged screen. ( Cut through at manufacturing and covered so not visible )

Caused the receive system to self oscillate at 2.2 GHz.

Leaking cable

Page 22: OPS Forum SMA Validation PtII 15.08.2008

Page 22

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems. RFI from microwave link

Microwave links at Azores used the same frequencies as foreseen for Ariane 5.

Local coordination possible. Microwave links could move to other frequencies.

Page 23: OPS Forum SMA Validation PtII 15.08.2008

Page 23

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Unexpected problems. Broken RF cables.

Cables from antenna are passing over a cable chain that is bent up to 180 degree each pass.

Selected coax cables had solid centre conductor not suitable for repeated bending.

Cables replaced , first temporary with RG223 available on site.

After AR5 support replaced to RG214 High Flex cables.

Page 24: OPS Forum SMA Validation PtII 15.08.2008

Page 24

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Servo system not optimised

Large pointing errors when tracking moving targets.

Servo system software corrected

Page 25: OPS Forum SMA Validation PtII 15.08.2008

Page 25

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Rough climate conditions.

Rust

Replace bolts with better quality, and repaint

Page 26: OPS Forum SMA Validation PtII 15.08.2008

Page 26

Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum

Useful tool for maintenance