This seminar will provide an overview of the new ESTRACK ground station at Santa Maria, Azores, and its first operational usage for the ATV launch in March. Santa Maria station was established to support the Ariane 5 launch of ATV that took place in March this year.
Citation preview
Page 1
2008-08-15 OPS-G Forum
Boris Smeds OPS-GSY
The new ESTRACK Santa Maria Ground station for support of
Ariane 5 launch of ATV.
Head of Systems and Project Support Section
Page 2
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
The Santa Maria Station is presented by:
Part 1 Boris Smeds OPS-GSY
Overview of requirements and technical implementation Specific differences compared to a conventional satellite
ground station Lessons learned, unexpected problems and how they
were solved
Part 2 Gerhard Billig OPS-ONV
Test and validation Operational concept, preparations and launch operation
Page 3
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Requirements Receive telemetry data from Ariane 5 during the launch of ATV and send to
Kourou in real time.
Cover the passes over the Atlantic region.
Santa Maria Azores
Page 4
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Time scale of actual implementation. April 2006: Site Inspection
June 2006: SoW for antenna and related equipment. ITT
September 2006: PDR for antenna, TM system and power plant
November 2006: CDR for antenna and TM system
March 2007: Start of Factory Acceptance Tests
April 2007: Shelter and TM equipment installation at Santa Maria
July 2007: Commissioning of Powerplant
October 2007: Start of antenna commissioning at Santa Maria
December 2007 / January 2008: Antenna fully validated for AR5
Page 5
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Station system overview
Inmarsat
ISDN
Groundstation
Ariane-5 TM Kit
CSG/Kourou
Antenna
S-b
and
Program Track
VoiceInterface
TM ReceiverFrame sync,
Timestamping
AntennaControl Unit
Voice
Pointing(DO)
S-band
Decommutation,CVI Extraction
TM
CVI
Ground commsInterface
AntennaPointing
Telephone
Servo
LNA
Down-Converter
Tracking RX(Dual Frequency)
S-band S-band
Auto Track
Timing
Frequencyand
Time
Test signal
S-band
Page 6
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
X-band option
To allow reception of Earth observation satellites in the 8025-8400 MHz band the antenna is equipped with a dual feed and dichroic sub-reflector.
Page 7
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Major differences compared to satellite RF-links
Dual frequency transmission. One antenna on each side of the spinning launcher
Telemetry modulation: frequency shift (not CCSDS) , no remnant carrier. 1 Mbps
No Kepler orbit during launcher propulsion phase. Continuous position updates that may have large errors.
High angular velocity due to close distance ( 180 km , 7 km/s)
Communication using HDLC protocol
ISDN and Inmarsat satellite link to Kourou
Page 8
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Existing concrete platform
Page 9
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Equipment shelter and Telemetry kit
Reuse existing design of TM-kit developed for Ariane tracking network by Carlo Gavazzi Space
Page 10
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Calibration tower
Guests on existing tower at Pico Alto
Page 11
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Antenna supplied by Indra Espacio. Assembly at factory. Partly new design. 5.5 m dish, Carbon fibre
Page 12
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Antenna installed at Santa Maria
X-Y mount (no singularity at zenith)
Inmarsat antenna
Radio link to calibration tower
Page 13
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Murphy’s law
If anything can go wrong, it will.
Page 14
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Filters required to reject UMTS ( mobile phone )
Filters supplied from US company.
Delayed delivery due to ITAR
Receive band
Page 15
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems, wrong paint.
Glossy paint was used on the reflector. Feed cover burnt when pointing to the sun during G/T tests.
Repainting of reflector required
Page 16
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems, autotrack patterns
Error in computer simulation of antenna pattern for the autotrack feed. Actual pattern gave larger angular offset than expected.
Original feed design
Page 17
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems, autotrack patterns
Computer simulation
Page 18
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Antenna tracking pattern measured
Error signal
Page 19
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
New feed New feed design solved the issue.
4 lateral dipoles closer together. Sum signal generated by combining signals from the lateral dipoles.
Page 20
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Antenna tracking pattern new feed
Error signal
Page 21
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems, bad cables
RF cables after Low noise amplifier with 60 dB gain with damaged screen. ( Cut through at manufacturing and covered so not visible )
Caused the receive system to self oscillate at 2.2 GHz.
Leaking cable
Page 22
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems. RFI from microwave link
Microwave links at Azores used the same frequencies as foreseen for Ariane 5.
Local coordination possible. Microwave links could move to other frequencies.
Page 23
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Unexpected problems. Broken RF cables.
Cables from antenna are passing over a cable chain that is bent up to 180 degree each pass.
Selected coax cables had solid centre conductor not suitable for repeated bending.
Cables replaced , first temporary with RG223 available on site.
After AR5 support replaced to RG214 High Flex cables.
Page 24
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Servo system not optimised
Large pointing errors when tracking moving targets.
Servo system software corrected
Page 25
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Rough climate conditions.
Rust
Replace bolts with better quality, and repaint
Page 26
Boris Smeds OPS-GSY 2008-08-15 OPS-G Forum
Useful tool for maintenance