28
ESOC OPS-ONV Page 1 Santa Maria Groundstation Validation and Support to Ariane-5 ATV OPS-G Forum Gerhard Billig 15 July 2008

OPS Forum SMA Validation PtI 15.08.2008

Embed Size (px)

DESCRIPTION

This seminar will provide an overview of the new ESTRACK ground station at Santa Maria, Azores, and its first operational usage for the ATV launch in March. Santa Maria station was established to support the Ariane 5 launch of ATV that took place in March this year.

Citation preview

Page 1: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 1

Santa Maria Groundstation

Validation and Support to Ariane-5 ATV

OPS-G Forum

Gerhard Billig

15 July 2008

Page 2: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 2

Agenda

1. Groundstation Validation2. Infrastructure3. Operational Setup and Preparations4. Launch Operations5. Outlook

- Upgrade of Perth groundstation- Support to other Launcher families

Page 3: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 3

Groundstation Validation- Internally Tested Subsystems -

• Tracking Tests with Caltower / Satellites• Dedicated Autotrack Tests

• Monitoring and Control• TM reception and processing

Page 4: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 4

Autotrack Validation

• Angular velocity of launcher (as seen from the groundstation) was much higher than that of satellites

• Autotrack (dual frequency) was mandatory and primary mode of tracking

• Aircraft was chosen as carrier for transmitters• Trajectory was down-scaled to meet aircraft constraints:

• Height: ≈ 1200m

• Speed: ≈ 200km/h• Placement of antennas and power connection was difficult

Page 5: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 5

Track of Ariane-5 over SMA• 1st pass:

Min Slant Range: ≈ 180km at elevation 48°

• 2nd pass: Min Slant Range: 1100 km at elevation 10°

Page 6: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 6

Actual Flightpath

Page 7: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 7

Page 8: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 8

Antenna positioning in aircraft

Page 9: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 9

Equipment Installation

Page 10: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 10

Page 11: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 11

SMA Infrastructure Development: Original View

Page 12: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 12

Finalised Installation at SMA

Page 13: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 13

Page 14: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 14

Page 15: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 15

Inauguration

Page 16: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 16

Operations Preparations and

Launch Support

Page 17: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 17

Requirements for Launch Support from SMA

• Tracking: Dual-frequency AutotrackDO-Programtrack

• TM Reception and Storage• TM Extraction and Forward to CSG• Event Detection and Forward• Voice Communications

Comms

Acores

Voice

S-band

CSG/Kourou

TM Receiver

Voice

TM (CVI)

Pointing (DO)

Antenna Control

Page 18: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 18

Ariane-5 ATV: Mission Overview

Page 19: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 19

Ariane-5 ATV Tracking Network - Drivers -

• Mission Duration: 1.5 Orbits (0.5 orbits for GTO)• Long Cruise Phases complicate accurate orbit prediction

(Ariane inertial platform sensors)

• Inclusion of Radars at Europe resolved predication accuracy problems

• ISS was used as tracking target to exercise network-wide tracking campaigns

Page 20: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 20

Santa Maria Groundstation: Schedule for Operations

• March 2007: Meeting with CNES/CSG• May 2007: Operational Training with CNES• October 2007: Operations KoM with CNES at SMA

Start of Operational Preparations• November 2007: Stand-Alone Tests• January 2008: Operational Qualification with CNES• February 2008: Mission Readiness Tests (internal)• 9th March 2008: Launch of Ariane-5 ATV

Page 21: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 21

Page 22: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 22

Page 23: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 23

Page 24: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 24

Page 25: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 25

Page 26: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 26

Page 27: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 27

Outlook: Upgrade of Perth groundstation

-90

-60

-30

0

30

60

90

-180 -150 -120 -90 -60 -30 0 30 60 90 120 150 180

Ariane 5-ECA+Fregat

Soyuz+Fregat

CAR

NAN

KSH

PERT

REDUAUS

ACO

BAT

KRUBAN

TRI

KRN

-90

-60

-30

0

30

60

90

-180 -150 -120 -90 -60 -30 0 30 60 90 120 150 180

AR5 SSO

1500_sso

1200_sso

700_sso500_sso300_sso

PARE

MIG

PERT

SPIT

WAL

BER

STH

ANT

KRU

MASUOKI

DONG

KER

REF ELV

Page 28: OPS Forum SMA Validation PtI 15.08.2008

ESOC OPS-ONV

Page 28

Outlook: Support to other Launcher Families

• Vega SSO launch trajectory

• Vega Maiden Launch

• Soyuz