Moving your share point development to azure

  • Published on
    09-Jan-2017

  • View
    322

  • Download
    2

Embed Size (px)

Transcript

PowerPoint Presentation

Moving your SharePoint Development to AzureMalin De SilvaSharePoint SpecialistExilesoft

malindesilva@live.com

About Me

Experienced with SharePoint 2007/ 2010/ 2013

Presenter at many meetups and conferences

A BIG Azure fan.

Lets Get to KnowSharePoint Developers?

Experienced with Azure?

Worked with Azure Virtual Machines?

SharePoint Development Experience on Azure?

AgendaIntroductionPlanning infrastructureAzure VMs for SharePointCapex vs OpexCost saving tipsQ and Amalindesilva@live.com

4

Running SharePoint on AzureHow much bandwidth required?Develop from ANYWHERECan scale up easily/ quicklyResources are not idle when VMs are stoppedNo concerns on local storagesUpdates automatically if allowedBackup and restore mechanisms

5

Our Team5 Members

Full Trust Solutions

1 SharePoint 2010 Development Environment

5 SharePoint 2013 Development Environments

1 QA Environment

6

Planning Infrastructure Developer Machines

7

Planning Infrastructure Developer Machines

developer1farmdeveloper1setupdeveloper2farmdeveloper2setup.developermember1developerowner1developertestuser1

8

DemonstrationCreating a Network and a Virtual Machine

9

Planning Infrastructure Test Environment

Same Domain ControllerDatabase Server for QASharePoint WFESharePoint App Server

10

Azure VMs for SharePointA series General PurposeBasic: 300 IOPSStandard: 500 IOPSD/ DS Series SSD + 60% fasterG Series Larger RAMsINSTANCECORESRAMDISK SIZEPRICEA010.75 GB20 GB$0.02/hrA111.75 GB70 GB$0.09/hrA223.5 GB135 GB$0.18/hrA347 GB285 GB$0.36/hrA4814 GB605 GB$0.72/hrA5214 GB135 GB$0.33/hrA6428 GB285 GB$0.66/hrA7856 GB605 GB$1.32/hr

11

Capex vs OpexVirtual MachineA1 (DC)A5 (Developer)A6 (Database)A3 (QA)No. of machines1513Cost per hour (USD)0.090.33 * 5 = 1.650.660.36 * 3 = 1.08Active hours per month22022022033Annual Cost (USD)237.643561742.4427.7Total Cost per Year (USD)6763.7 ~ 6,040 EUR

Assumptions: Each machine will stay started for 10 hours daily for 22 days a month. QA server will remain up every quarter for 10 days with 10 hours per day.We will keep creating full trust code through the year.

12

Cost Saving TipsAuto scaling or Automation

License mobility

Start with Windows Server installations

13

DemonstrationAuto scaling, Automating

SummaryPotentials on cloudBetter planning for VMsCost estimationsLicense mobilityAuto scaling and automating

Questions?