25
Soci Fondatori: Laboratorio Accreditato: Con il Finanziamento: BANDI EDILIZIA 2015 HORIZON 2020 PER L’EDILIZIA Faenza, 13 Novembre 2014

Bandi 2015 per l'Edilizia

Embed Size (px)

Citation preview

Page 1: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI EDILIZIA 2015

HORIZON 2020 PER L’EDILIZIAFaenza, 13 Novembre 2014

Page 2: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI 2015 IN AMBITO «EFFICIENZA ENERGETICA DI EDIFICI E MATERIALI DA COSTRUZIONE»

Dove si collocano?

2° PILLAR - Competitive Industries 5. Leadership in enabling and industrial

technologies (LEITs) ii. Nanotechnologies, Advanced Materials, Biotechnology and Advanced Manufacturing and Processing

Call for EeB – Energy-efficient BuildingsH2020 – EeB – 2014/2015

o EeB 5 – 2015: Innovative design tools for refurbishment at building and district level

o EeB 6 – 2015: Integrated solutions of thermal energy storage for building applications

o EeB 7 – 2015: New tools and methodologies to reduce the gap between predicted and actual energy performances at the level of buildings and blocks of buildings

o EeB 8 – 2015: Integrated approach to retrofitting of residential buildingsCall for Nanotechnologies, Advanced Materials and Production - Exploiting the cross-sector potential of Nanotechnologies and Advanced materials to drive

competitiveness and sustainabilityo NMP 25 – 2014/2015: Accelerating the uptake of

nanotechnologies, advanced materials or advanced manufacturing and processing technologies by SMEs

3° PILLAR - Societal Challenge 10. Secure, clean and efficient

energyCall – Energy Efficiency

A – Buildings and consumers o EE 2 – 2015: Buildings design for new

highly energy performing buildings

Page 3: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

ENERGY EFFICIENCY OF BUILDINGS“VISION” DELLA COMMISSIONE EUROPEA NEI BANDI

CertiMaC, Membro ECTP (European Construction Technology Platform), ha partecipatoil 21/10/2014 a Bruxelles all’Infoday della CE ove stata presentata la Vision generaledelle call in ambito Energy Efficiency of Buildings:

SOSTENERE IL RIAVVIO DEL SETTORE ECONOMICO DELLE COSTRUZIONI:

o Uso di tecnologie innovative, affidabili ed economicamente vantaggiose

o Creazione di un’Industria delle Costruzioni High-Tech: aumentarne la Competitività

SETTORE DELLE COSTRUZIONI PIÙ ECO-COMPATIBILE E COMPETITIVO:

o Riduzione radicale dei consumi energetici (50%) e delle emissioni di CO2 (90%) peredifici di nuova costruzione e quelli ristrutturati

o Generazione minore di scarti/rifiuti e minimizzazione di «embodied energy» deiprincipali materiali

R&I PER INTEGRARE E DIMOSTRARE TECNOLOGIE INNOVATIVE IN:

o Materiali e componenti per risparmio energetico e creazione di energia,distribuzione e accumulo di calore, sistemi, uso di fonti energetiche rinnovabili,sistemi di gestione efficiente di edifici, strumenti di simulazione e previsione.

Page 4: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

ENERGY EFFICIENCY OF BUILDINGSVERSO IL 2020

AREE CHIAVE DI RICERCA

Tecnologie per accelerare il rinnovamento degli edifici

Assicurare performance energetiche durante tutto il ciclo di

vita dell’edificio

Edifici interattivi e sostenibili integrati a livello diquartiere e di città

Page 5: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

ENERGY EFFICIENCY OF BUILDINGSVERSO IL 2020

LA VISION GENERALE

Sviluppare un’economia efficiente e sostenibile dal punto di vista energetico

L’efficienza energetica è già oggi un Modello economico

L’innovazione deve andare oltre i Regolamenti e Leggi attuali, partendo da:

MATERIALI:

a seguire, negli EDIFICI:

sino ai QUARTIERI:

Page 6: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

ENERGY EFFICIENCY OF BUILDINGSVERSO IL 2020

IL NUOVO QUADRO POLITICO EUROPEO

Strategia europea di Energy Efficiency Communication: ruolo chiave del settore costruzioni,

Approccio di Circular Economy: approccio Life Cycle e di gestione degli scarti/rifiuti,

Da «20-20-20» a «40-27-30»? Obiettivi % che l’Europa si è posta per il 2030 rispetto a riduzione delle emissioni di gas serra, fonti rinnovabili ed efficienza energetica.

QUALI CONCLUSIONI SULLE AZIONI AD OGGI SVOLTE NEL QUADRO EUROPEO DELL’EFFICIENZA ENERGETICA DEGLI EDIFICI?

La nuova Vision sta diventando sempre più «visibile», i finanziamenti e i bandi EeBcontribuiscono a rafforzare il collegamento tra soluzioni innovative e il mercato

Positive energy buildings: un successo oltre quanto in vigore per legge

Page 7: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

ENERGY EFFICIENCY OF BUILDINGSVERSO IL 2020

SU COSA È NECESSARIO CONTINUARE A CONCENTRARE GLI SFORZI?

Aumento dei tassi di riqualificazione

Forza-lavoro più competente

Contributo agli obiettivi europei generali di riduzione di CO2

Miglioramento della qualità di vita dei cittadini

Page 8: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI HORIZON 2020

Seguono brevi estratti di alcune call ritenute rappresentative in ambito efficienzaenergetica degli edifici.

Per la versione completa si rimanda al testo integrale (in lingua inglese), disponibilepresso il portale online della commissione europea, raggiungibile al seguenteindirizzo:

http://ec.europa.eu/research/participants/portal/desktop/en/opportunities/h2020/index.html

Il portale è costantemente aggiornato.

Su CORDIS (sezione progetti e risultati) è invece possibile trovare l’archivio deiprogetti assegnatari di finanziamenti passati a partire dal 1990, da cui è possibileavere un inquadramento più ampio sul tema.

http://cordis.europa.eu

Page 9: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

Le call EeB Energy Efficiency of Buildings 2015 hanno scadenza 04/02/2015

EeB-05-2015 - IA: Azione di Innovazione

Topic: Innovative design tools for refurbishing of buildings at district level

Specific challenge: The development of sustainable solutions for refurbishment of buildings and

their proper integration at district level requires major innovations in the design tools,

construction methods and management practices, including socio-economic aspects and

innovative financing instruments.

Buildings should no longer be renovated individually, but as part of a global energy system,

where their interactions with their environment can be predicted and simulated, as well as

taking into account interactions with inhabitants and customers.

Scope: Research activities should be focused on design at buildings and district level, taking into

account the adjacent systems such as district heating/cooling and other interactions with the

neighborhood, giving priority to local renewable resources.

Page 10: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-05-2015

Expected impact:

More effective refurbishment at building and district level.

Optimised design of integrated energy-efficient buildings, considering the different physical

dimensions in an holistic way (energy, comfort, air quality, acoustics etc.), enabling actors to take

validated and quantified choices for the refurbishment at building and district level on the basis

of quantified performance objectives with compliance with regulation and user-oriented

comfort expectations and constraints .

TRL atteso: 5-7.

Significativa partecipazione di PMI con capacità interna di R&S.

Indicazioni Comissione sul contributo richiesto: tra 4 e 7 milioni di euro

Page 11: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-06-2015 - RIA: Azione di Ricerca & Innovazione

Topic: Integrated solutions of thermal energy storage for building applications

Specific challenge: Storage plays a pivotal role in synchronising energy demand and supply, both

on a short and long term (seasonal) basis. Transformation of our existing building stock towards

very low energy buildings and nearly zero energy and Plus-energy buildings requires effective

integration and full use of the potential yield of renewable energy. Thermal storage is a key

priority

Scope: Proposals should address advanced solutions required to reduce thermal losses, reduce

pressure drops, and improve heat exchange in and between storage material and heat carrier.

These storage solutions should be enabled by material innovations that are safe and

environmentally friendly.

Small scale demonstration of the technical (with compactness as a crucial boundary condition)

and economic feasibility of such storage systems at the level of components and systems in

relation to space heating and cooling and/or domestic hot water systems of a single building are

expected.

Page 12: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-06-2015

Expected impact:

• Provide advanced thermal energy storage solutions.

• Demonstrate solutions that have a stable long term performance in multi-cyclic seasonal useof at least 20 years.

• Solutions should demonstrate a potential to reduce the net energy consumption of abuilding by at least 15% and a have return-on-investment period below 10 years.

TRL atteso: 4-6.

Indicazioni Comissione sul contributo richiesto: tra 3 e 6 milioni di euro

Page 13: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-07-2015 – IA: Azione di Innovazione

Topic: New tools and methodologies to reduce the gap between predicted and actual energy performances at the level of buildings and blocks of buildings

Specific challenge: The monitoring of real energy use in energy-efficient buildings frequentlyshows major differences with respect to the predicted performance. This is even worse if a setof interacting buildings is considered. It is therefore important to capture the real complexitiesof the energy performance of the actual buildings and districts. In addition, effectivemethodologies for the correct understanding of user behaviour need to be addressed.

Scope: At building level, the research focus is on developing methodologies and tools to monitorand assess actual building energy performance, considering relevant factors such as userbehaviour, complex energy systems performance and weather forecast, and to be able to predictaccurately building energy loads and consumption along the whole lifecycle.

At the level of a block of buildings, the focus will be on real time optimisation of energy demand and supply using intelligent energy management systems with the objective of reducing the difference between peak power demand and minimum night time demand.

Cost-effective and interoperable solutions should be demonstrated for a block of buildingsconsisting of at least 3 different buildings in real life operating conditions. Autonomous powersystems at district level could be considered.

Page 14: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-07-2015

Expected impact:

• Significant reduction in the difference between real and predicted energy behaviour in a building or a block of buildings, after the demonstration of the viability of the new tools and methods for measuring and analysing real building energy performance.

• The gap is narrowed down to a value consistent with energy performance contracts.

• Provide solutions with a high replication potential.

TRL atteso: 5-7.

Significativa partecipazione di PMI con capacità interna di R&S.

Indicazioni Comissione sul contributo richiesto: tra 4 e 7 milioni di euro

Page 15: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-08-2015 – IA: Azione di Innovazione

Topic: Integrated approach to retrofitting of residential buildings

Specific challenge: deep rehabilitation of residential buildings (including buildings of historicvalue) while lowering the costs of refurbishment. Nowadays at the scale of Europe, fossil energyis mainly used in residential buildings for two usages which are space heating and Domestic HotWater production. Such a large building stock needs innovative, efficient and cost-effectiveretrofitting solutions to meet the planned net-zero energy standards.

Scope: Systemic approaches need to be developed which integrate the most promising cost-effective technologies and materials. The solutions could include, for example, combination ofrenewable energy sources at building level; exploitation of heat recovery for water and air aswell as ICT, enabling to adapt the system to the end-user behaviour without losing control of theglobal efficiency of the system.

The district scale, as well as the interactions between the buildings and the thermal andelectrical energy networks (i.e. impact on the energy demand) should be taken into account.

The approach should be based on a methodology incorporating modelling, simulation, virtualreality, with the aim of identifying the optimal cost-effective solutions. Standardisation issues tofacilitate integration of system components should be addressed

Page 16: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EEB-20152° PILLAR: INDUSTRIAL LEADERSHIP

EeB-08-2015

Expected impact:

• Demonstrate innovative retrofitting solutions as real cases approaching net zero energy standards.

• Reduction of at least 60% in energy consumption compared to the values before renovation while ensuring affordability.

• Demonstrate a high replicability potential.

• Return on investment should be below 7 years in the case of deep retrofitting.

• Advent of a new generation of skilled workers and SME contractors in the construction sector aware of the need of a systemic approach towards energy efficiency should be promoted through the proposed activities.

TRL atteso: 5-7.

Significativa partecipazione di PMI con capacità interna di R&S.

Indicazioni Comissione sul contributo richiesto: tra 4 e 7 milioni di euro

Page 17: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EE-2015SC: SECURE, CLEAN AND EFFICIENT ENERGY

H2020-EE-2015-1-PPP

EE-02-2015 - IA - Azione di Innovazione

Topic: Buildings design for new highly energy performing buildings

Specific Challenge: By the end of 2020 (2018 for buildings occupied and owned by publicauthorities), all new buildings should comply with the Energy Performance of Buildings Directiveobligations and thus meet 'nearly zero-energy' performance levels using innovative, cost-optimaltechnologies with integration of renewable energy sources on site or nearby.

Scope: Projects should focus on development and demonstration of solutions which significantlyreduce the cost of new buildings with at least 'nearly zero-energy' performance levels, whilstaccelerating significantly the speed with which these buildings and their systems are taken up bythe market.

The focus should lie on solutions for appropriate indoor air quality and comfort, design adaptedto local climate and site, passive solutions (reducing the need for technical building systemswhich consume energy) or active solutions (covering a high share of the energy demand withrenewable energies), building energy management systems (where appropriate), highly efficientHeating, Ventilation and Air-Conditioning

Page 18: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

BANDI H2020-EE-2015SC: SECURE, CLEAN AND EFFICIENT ENERGY

EE-02-2015

Expected Impact:

Significant increase of the share of 'nearly zero-energy' buildings with the aim of 100% market uptake by the end of 2020.

Costs reductions of at least 15% compared to current situation, with additional benefits in terms of energy reduction.

TRL atteso: 5-7.

Indicazioni Comissione sul contributo richiesto: tra 3 e 5 milioni di euro

Page 19: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

SME INSTRUMENT – STRUMENTO PER LE PMI

H2020-SMEINST-1-2015

NMP-25-2015-1 – SME Instrument

Topic: Accelerating the uptake of nanotechnologies, advanced materials or advanced manufacturing and processing technologies by SMEs

Deadline Date: 16-12-2015 17:00:00 (Brussels local time)

Intermediate deadlines(s): 18-03-2015 17:00:00 (Brussels local time)

17-06-2015 17:00:00 (Brussels local time)

17-09-2015 17:00:00 (Brussels local time)

Specific challenge: Research results should be taken up by industry, harvesting the hithertountapped potential of nanotechnologies, advanced materials and advanced manufacturing andprocessing technologies. The goal is to create added value by creatively combining existingresearch results with other necessary elements,[1] to transfer results across sectors whereapplicable, to accelerate innovation and eventually create profit or other benefits. The researchshould bring the technology and production to industrial readiness and maturity forcommercialisation after the project. FASI 1,2,3

Page 20: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

TRA LE NOVITA’ DI HORIZON: L’IMPORTANZA DEL BUSINESS PLAN

IMPATTI e ricaduta sul mercato dei prodotti/soluzioni sviluppati all’interno di un progetto hanno importanza fondamentale in Horizon

Molti progetti presentati nei primi mesi di call erano mancanti di un solido e convincente BUSINESS PLAN.

La Commissione non mette a disposizione un format generale di BP, ma ne precisa gliaspetti salienti:

Come i risultati finali contribuiranno alla strategia di crescita dei partner,

Aree chiave di applicazione dei risultati conseguiti,

Modalità di gestione della Proprietà Intellettuale nel consorzio,

Partner coinvolti nelle attività di Sfruttamento (Exploitation),

Dimensione geografica ed economica del mercato di sbocco,

Business Model: strategia di marketing e principali clienti,

Proiezioni finanziarie,

Piano dei rischi.

Page 21: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

CON CHE RUOLO PARTECIPARE AI BANDI? ALCUNE IPOTESI…

• Sviluppo di prodotti/soluzioni innovative e costruzione di un progetto

• Partner in proposte sviluppate da altri ApplicantAziende produttrici di materiali e soluzioni

di energy efficiency per l’edilizia

• Coinvolgimento tramite di imprese associate che partecipino come partner

• Attività di disseminazione, comunicazione, awareness raising e di formazione attraverso proprie agenzie di formazione

Associazioni di categoria e datoriali

• Messa a disposizione di edifici per Demonstration, possibilità di vedersi finanziate le spese di restauro e loro messa in efficienza energetica,

• Attività di awareness raising sul target finale cittadini e abitanti degli edificiProvince/Comuni

•Stakeholder che assicurano la massima diffusione dei risultati di progetto

•Attività di supporto al market uptake delle soluzioni sviluppate

•Workshop formativi e informativi su target imprese di settore e lavoratori

Associazioni «Umbrella» (livello regionale e nazionale, es. ANCE)

• Rapporti con costruttori e/o Municipalità che apportino demostration building nella proposta. Lavori di progettazione in subcontracting a tali building owner

• Destinatari di formazione ad hoc su tecniche di retrofit, Nzeb ecc.

Liberi professionisti e/o Studi al servizio del settore edilizia (es. Architetti)

• Messa a disposizione di edifici per Demonstration, possibilità di vedersi finanziate le spese di costruzione/restauro con soluzioni innovative di efficienza energetica

Costruttori

Page 22: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

COMPETENZE SPECIALISTICHE DI CertiMaCIN ENERGY EFFICIENCY OF BUILDINGS

CERTIMAC MISSIONOrganismo di Ricerca, Certificazionee Prove sui Materiali, opera dal 1993 nella Filiera delle Costruzioni.

Know-how specialistico, network scientifico e strumentazioni all’avanguardia

a supporto di chi vuole Innovare in Edilizia

Soci Fondatori

Altri partner scientifici

CertiMaC è Laboratorio Accreditato della Rete Alta TecnologiaEmilia-Romagna - Piattaforma Costruzioni.

Nell’ambito del Tecnopolo di Ravenna, CertiMaC è il lead partnerdella Divisione per l’Innovazione sui Materiali da Costruzione:MITAI - Materiali Innovativi e Tecnologie per ApplicazioniIndustriali.

Page 23: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

COMPETENZE SPECIALISTICHE DI CertiMaCIN ENERGY EFFICIENCY OF BUILDINGS

Sistemi di retrofit energetico integrato multi-prestazionale: antisismico e adenergia quasi zero

Ingegnerizzazione di soluzioni multistrato per l’involucro ad alto poteretermoisolante e ottimizzazione del comportamento termo-igrometrico

Integrazione energie rinnovabili negli interventi di qualificazione

Ottimizzazione impianti geotermici a bassa entalpia attraverso l’accuratavalutazione termica del sito e dei materiali del sottosuolo

Progettazione integrata per il Deep Retrofit in ottica nZEB

Sviluppo di materiali innovativi per l’involucro edilizio:

- ad alto potere termoisolante

- resistenti alle sollecitazioni meccaniche

- resistenti alle sollecitazioni atmosferiche

- sostenibili

Page 24: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

COMPETENZE SPECIALISTICHE DI CertiMaCNEI PROGETTI EUROPEI EeB, EE, SME INSTRUMENT

Pre-valutazione dell’innovatività di idee/soluzioni + upgrade/sviluppo strategico per matching coi bandi

Sviluppo + scrittura progetto (in lingua), predisposizione strategica formulario e WP

Definizione migliore struttura di partnership (chi, da dove, che fa cosa) per soddisfare criteri di valutazione, operativi ed economici

Ideazione/sviluppo parti progettuali per innovazione, test e certificazione materiali

Progettazione attività di Management, Formazione, Awareness raising…

Submission della proposta

Gestione relazioni/comunicazioni con Partner, Commissione e referenti NCP

Coordinamento scientifico progetti approvati

Supporto al Project Management per imprese/organizzazioni con ridotta operational capacity

Partner consolidati in Italia: ENEA, CNR-ISTEC, Centuria, INRIM, CTI, UniBO, UniPD, UniURB… e Rete di partner scientifici europei: Università Limoges, CTMNC, ZMRK, TCKI, SWEA, FCTA, ANATOLIKI, IRENA, ISR, CEA, …

Networking europeo: Membro di ECTP – European Construction Technology Platform

Comunicateci il vostro interesse ad aderire a progetti!

Page 25: Bandi 2015 per l'Edilizia

Soci

Fondatori:

Laboratorio

Accreditato:

Con il

Finanziamento:

I NOSTRI CONTATTI

GRAZIE PER L’ATTENZIONE

Siamo a disposizione per domande, approfondimenti, incontri one-to-one per partecipazione a bandi EeB ed EE, ai seguenti indirizzi:

Dott.ssa Elena Casiraghi – Europrogettazione e Networking

[email protected], [email protected]

e

Ing. Luca Laghi – Responsabile Tecnico e Capo Unità R&S

[email protected], [email protected]

Visitate il nostro sito: www.certimac.it