Automation Testing

  • View
    593

  • Download
    1

Embed Size (px)

DESCRIPTION

Automation Testing Using Fiddler and Visual Studio 2010 Introduction to Automation Testing Recording Steps with Fiddler Use Recorded Steps in Visual Studio 2010 Load Test ---------------------------------------------------------------------- Created By: Yana Altunyan Reviewed by: Vladimir Soghoyan Ogma Applications

Text of Automation Testing

  • 1. Automation Testing Using Fiddler and Visual Studio 2010 Created By: Yana Altunyan Reviewed by: Vladimir Soghoyan Ogma Applications
  • 2. Overview Introduction to Automation Testing Recording Steps with Fiddler Use Recorded Steps in Visual Studio 2010 Ogma Applications 2 9/18/2012
  • 3. Introduction to Automation Testing An automation software testing tool is able to playback pre-recorded and predefined actions. Once automation tests are created they can easily be repeated and they can be extended to perform tasks impossible with manual testing. Ogma Applications 3 9/18/2012
  • 4. Introduction to Automation Testing Automation Testing means using an automation tool to execute your test cases. Automation does not require Human intervention. Automation increases speed of test execution. Ogma Applications 4 9/18/2012
  • 5. Recording Steps with Fiddler Fiddler is an HTTP debugging proxy server application. It captures HTTP(S) traffic and logs it for the user to review. Ogma Applications 5 9/18/2012
  • 6. Recording Steps with Fiddler Fiddler records all steps to be automated Ogma Applications 6 9/18/2012
  • 7. Recording Steps with Fiddler Export your Recorded Sections Ogma Applications 7 9/18/2012
  • 8. Use Recorded Steps in Visual Studio 2010 Microsoft Visual Studio is an integrated development environment (IDE) from Microsoft. It can be used for testing. There is an Automation testing possibility in Visual Studio. Ogma Applications 8 9/18/2012
  • 9. Use Recorded Steps in Visual Studio 2010 Run Recorded steps in Visual Studio 2010 Ogma Applications 9 9/18/2012
  • 10. Use Recorded Steps in Visual Studio 2010 Results: Ogma Applications 10 9/18/2012
  • 11. Use Recorded Steps in Visual Studio 2010 Load testing is performed to determine a systems behavior under both normal and anticipated peak load conditions. Recorded steps can be used for Load testing Ogma Applications 11 9/18/2012
  • 12. Use Recorded Steps in Visual Studio 2010 Load test using Recorded steps Ogma Applications 12 9/18/2012