© Kensa Engineering Ltd 2011 1 Introduction to Kensa Heat Pumps The Only UK Manufacturer of a Complete Range of Ground Source Heat Pumps

An Installers Guide to GSHP

Embed Size (px)

DESCRIPTION

An Installers Guide to Ground Source Heat Pumps. Delivered by Kensa, in association with Plumbcenter.

Citation preview

Page 1: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

1

Introduction to Kensa Heat Pumps

The Only UK Manufacturer of a Complete Range of Ground

Source Heat Pumps

Page 2: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

2

Introduction to Kensa

UK Manufacturer of Heat pumpsProduction facility in CornwallCommercial office in ExeterOver 2500 Kensa units in ServiceOver 11 years production expertiseOver 15000 Slinkies installedISO 9001 ApprovedFull MCS accreditationIndustry Award Winners 2008/2009

Page 3: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Kensa Engineering Ltd

3

UK Designers and Manufacturers of Heat Pumps

Page 4: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Product RangeMarket OverviewQualify the OpportunityRHI OverviewMCSProjectInstallationPricingMarketingNew for 2012Summary

Content

Page 5: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Smallest appliance on the market.Simplest-to-install appliance.Remote commissioning. Designed for UK properties. Unique DHW control system.Complete product offeringCan be installed in external shelters.Full MCS compliance for product and installation. Very Linear pricing structure

No Immersion heaters inside

Product Strengths of Kensa

Page 6: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Compact Range

6

Page 7: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

7

Kensa manufacture the largest single phase GSHP on the market.

On the UK Grid, a number of properties have single phase electricity only and the cost to upgrade to 3 phase can be extortionate.

Importing manufacturers can only supply up to 11 – 12kW.

Kensa manufacture product for the UK market, supplying units as large as 24kW single phase.

Product Designed for the UK

Page 8: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

High Temperature Range

8

Page 9: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Plantroom Range

9

Page 10: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Kensa’s Complete Product Range

10

Kensa compact heat pump single and twin

compressor, plantroom heat pumps, slinkies, antifreeze, manifolds,

expansion vessels, buffer vessels, and

cylinders.

Page 11: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

The Opportunity – Market Projections

11

UK Renewable Heat Supply Curve, published in July 2009 with Renewable Energy Strategy:

– 1,220,000 GSHP installations by 2020.

Committee for Climate Change – December 2010:

– 7,000,000 heat pump installations by 2030 (1 in 4 UK homes).

Page 12: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Market Opportunity

Residential Private Sector

Residential Social Sector

Industrial / Commercial Sector

Retrofit Retrofit Retrofit

New Build New BuildNew Build

Sectors Currently Installing Ground Source Heat Pumps

Page 13: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

13

Current Position - BSRIA

Tables extracted from the BSRIA World

Renewable Report published in

November 2010

Page 14: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

14

Oil Prices

Oil has risen by 60%+ in the last 2yrs

Page 15: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

LPG has risen by the same %Oil at 65p/litre and 85% efficiency equates to 7.5pkW/hrLPG at 50p/l and 85% efficiency equates to 8.2pkW/hr Oil being StolenServicing costs & response maintenanceReplacement costsRecession

15

Oil Boilers

Page 16: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

David BroomTechnical Sales

16

RHI Overview

Page 17: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

The Opportunity - RHI

17

Incentives are necessary to ensure Government meets its legally-binding 2020 targets.– 15% energy consumption from renewable’s– 12% heat from renewable’s– Current figure is 1.4% - Lowest figure in Europe besides

Malta and Luxemburg.

Feed-in Tariffs for electricity generating technologies launched April 2010.– Solar PV - 15 fold increase in installation volumes during first

two quarters over prior year.

RHI will provide 12% rate of return.

Page 18: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

18

The Renewable Heat Incentive

£860m of funding allocated for next four years.

- £120m of funding allocated to all renewable technologies under Low Carbon Buildings Programme (2004- 2010).

Two Phases of implementation

- Phase 1 - Commercial- Phase 2 - Domestic.

All qualifying installations from July 15th 2009 will retrospectively qualify for the funding stream.

Page 19: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

19

The RHI Phase 1 Tariffs - Commercial

Eligible Project Types:

Public Buildings Commercial Installation

Schools Industrial Processes

Hospitals Holiday Lets

Library’s B&B’s

Village Halls Hotels

Community Centre Swimming Pools (commercial)

Offices Communal Heating

Page 20: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

20

The RHI Phase 1 Tariffs - Commercial

Fixed Tariffs - Inflation Linked Quarterly Payments for 20 years Payments based on metered output Bi-vailent systems accepted.

www.ofgem.gov.uk/e-serve/RHI/Pages/RHI.aspx

Page 21: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Assumptions1000m² commercial PropertyEnergy use 72000kWh / yearOil Running cost 7.5p/kWhHeat Pump Running cost 3p/kWh

21

Oil VS GSHP Commercial Example

Oil GSHP

Supply & Install cost £11,000 £38,450

Running cost £5,600 £2,160

Life time cost (25 years) £151,000 £92,450

Annual RHI payment @4.5p/kWh 0.00 £3,240

Total RHI Payment 20 years 0.00 £64,800

Total life time cost £151,000 £27,650

Page 22: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

22

The RHI – So what about the domestic sector?

The RHPP £1250 One off Payment Apply for voucher via Energy Savings Trust website Submit voucher with commissioning certificate to claim Closing date - Install completed by 31st March 2012 Will qualify for the RHI Tariff A sample of projects will be monitored to evaluate performance.

Who can apply? Off Gas Only Primary Residence Must have basic energy efficiency measures in place. Microgeneration Certification Scheme approved Product Microgeneration Certification Scheme approved Installation

Page 23: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

RHI Domestic Tariff

23

Tariff payments to start October 2012Installations back to July 15th 2009 will qualifyFinal consultation due to be released Nov/Dec 2011Tariffs confirmed April 2012 - 5p/kWh?Energy measurement - Metered/SAP/DeemedEligibilityMCS

Page 24: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

MCS Accreditation

John Barker-Brown

24

Page 25: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

25

What is MCS?

The MCS (Microgeneration Certification Scheme) certificates microgeneration

technologies used to produce electricity and heat from renewable sources.

The MCS is also linked to financial incentives which include the Renewable Heat Incentive.

It is designed to provide a level of protection and assurance to consumers as well as a sign of quality

MCS Accreditation

Page 26: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

26

MIS 3005 – Heat Pumps

Requirements for contractors undertaking the supply, design, installation, set to work

commissioning and handover of microgeneration heat pump systems

MCS Accreditation

Page 27: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

27

Why do I need MCS Accreditation for my project?

For GSHPs, both the technology and the installer must be MCS certificated to be eligible for grants and incentives; In this rapidly growing industry,

installers and products that carry the MCS Mark are likely to be seen as the preferred option in the

market place.

MCS is linked The Renewable Heat Incentive and also the Green Deal.

Page 28: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

28

How do I obtain MCS accreditation?

Accreditation is via a certification body such as Corgi, Napit, BRE, etc.

You will need to demonstrate:-

1)An appropriate Quality Management System, which conforms to the MCS requirements (MIS001)

2)Details of competence in sizing, installing and commissioning heat pump systems, including site visit.

3)Membership of a consumer code, such as REAL

Page 29: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

29

MIS 3005 v3 – Heat Pumps

Requirement Comment

Heat Loss Calculations Room by room losses by BS EN 12381 or equivalent

Heat Pump Sizing 100% sizing

DHW Sizing to BS6700

Emitter Design Including a room by room performance assessment for the heat emitters (star rating) and how this can be improved

Ground Heat Exchanger Design Using appropriate software or charts within MIS 3005

System Performance Running hours and costs based on kW/h per year.

Commissioning

Page 30: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Requirement Comment

Heat Loss Calculations Room by room losses by BS EN 12381 or equivalent

Heat Pump Sizing 100% sizing

DHW Sizing to BS6700

Emitter Design Including a room by room performance assessment for the heat emitters (star rating) and how this can be improved

Ground Heat Exchanger Design Using appropriate software or charts within MIS 3005

System Performance Running hours and costs based on kW/h per year.

Commissioning

30

How Can Kensa Help?

Page 31: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

31

The Kensa MCS Umbrella Scheme

Kensa are an accredited MCS installer and manufacture MCS accredited products.

Providing installers a FREE of charge commissioning with a Kensa Technical Support Specialist based in the Kensa

Commercial Office.

This level of support through the installation, provides the installer and the client with MCS accreditation for the installation.

Eligible for RHI and Grant Funding

Page 32: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

32

Project Qualification

How do we identify a feasible GSHP project?

Built 1990 or later

Located off the mains gas grid

Has underfloor heating

Has oversized radiators

Is quite well insulated

Has sufficient land to lay slinkies/ground arrays

Does the client have the budget?

Page 33: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Sizing a new build project is EASY.

1. Kensa will size the unit based on 40w per M².

2.Send plans and SAP report to Plumbcenter.

33

Sizing – New Build

Page 34: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

34

Sizing – New Build

Internal area – Ground Floor

Total Internal area = 260m2

Heat load =

260m² x 40W p/m² (0.4) (If New Build)

=10400W

=10.4Kw

Page 35: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

EXAMPLE PROJECT

Domestic Retrofit

35

The Sizing and Pricing Process

Page 36: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

260sq/m house currently heated by oilPost 1990 and could benefit from additional insulationBoiler Replacement dueHas radiators and TRV’sPerhaps UFH in placesPressurised heating & DHW systemPlans

36

Project Opportunity

Page 37: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

37

Internal area – Ground Floor

Total Internal Floor Area = 260m2

Sizing – Retrofit

Heat load =

260m² x 60W p/m² (0.6) (If retrofit)

=15600W

=15.6Kw

Page 38: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Ideal sizing using SAP – Line 39!

SAP Report - Line 39a (January Heat Transfer Coefficient)

Project Location is ExeterHeat Loss Coefficient x Temperature

Difference -3°C (Min) to 21°C (Max) = 24°C rise

602.23 x 24 = 14453W

Page 39: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Typically will have radiators sized for 75°MWTHeat pump will supply water at 55/60°CRadiators will need measuring to make sure they are adequately sizedMultiply radiator output by factor of 0.8Some radiators may need changingMicrobore can cause flow issuesOpportunity for client to turn boiler down this winter to test process

39

Existing system

Page 40: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Isolate the oil lineDrain down and disconnect the boiler and fluePower flush pipeworkRemove S plan systemInstall 3 port diverter valve (DHW)Reconnect the existing pipeworkConnect the ground array pipeworkOrganise oil disposal

40

Existing plumbing

Page 41: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Space Heating and DHW Provided by GSHP with Underfloor Heating and Radiators

Page 42: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

17kW H/Temp heat pump £10.40KCylinder £1KInternal work an materials £1.6K

42

Internal Costing

Page 43: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

SELECTION AND SIZING OF GROUND

ARRAYS

43

Ground Arrays and Boreholes

Page 44: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

44

Slinky ground arrays

Page 45: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

45

Ground Array - Sizing

Heat pump size 17KW high temperature unitExample 50m slinky = 5Kw output Establish number of Slinkies (4)Spaced 5m apart 4 x 50 x 5 =1000m²Re-Charging – High water table - Soakaways

Page 46: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

46

Installation Costs

Trenching by ground workersBack filling by ground workers8/12hrs per trench to dig/backfillPlumber connects tails to manifold and pressures testsPressure testing prior to backfilling

Page 47: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

17kW H/Temp heat pump £10.40KCylinder £1KInternal work £1.6KGround arrays / peripherals £4KTrench Installation £3KManifold/pressure test £1KTotal £21K

47

Final Costing

Page 48: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

48

Boreholes Sizing

Page 49: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

49

Borehole Sizing

Insufficient ground 4 arraysDrilling – Specialist area60-100m deep6/8mtr separation20metres borehole depth = 1kWProbe and grouting from Driller£35/45 L/m Budget pricing3 x 100mtr required 12K

Page 50: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

17kW Hi/Temp Heat Pump £10.40KCylinder £1KInternal work £1.6K

Boreholes/ peripherals £12KTrench Installation £3KManifold/pressure test £1K

Total £29K

50

Final Costing

Page 51: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Existing Running cost– Oil at 65p/l Efficiency 85% = 7.5p/kWh

30,195kW x 7.5p/kWh + £150 Service Charge = £2,414.00

51

Cost Savings – Example

• =£2414

Page 52: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Heat Pump running cost- Electricity at 12p/unit- Efficiency of 250% - = 4.8p/kWh

30,195kWh x 4.8p/kWh = £1449.00

Cost saving. Oil less Heat pump running cost

£2414.00 - £1449.00 = £965.00

52

Cost Savings – Example

Page 53: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

53

Cost Savings – Example Today

RHI Payment30,195kWh x 5.0p/kWh = £1509Paid for 23 Years.

Total Annual benefit (£965 + £1509)

= £2474.00

Page 54: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Annual saving = £2,474Installation Cost = £21,000ROI = 11%

Payback in 8 Years.

Boreholes increase = £29,000ROI = 8%Payback in 12 yearsOil boiler change = £4K +

54

Return On Investment

Page 55: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

55

Project Responsibilities

Responsibility Project Member

Obtain plans and key project details from the client and pass to Plumbcenter

Installer

Initial sizing and quotation Kensa

Quote to the Installer Plumbcenter

Supply of heat pump Kensa

Project Survey (Heat loss calcs) Installer or Tonos

Installation of Heat Pump and Pipework Installer

Digging of trenches for slinkies/ground arrays Ground worker

Drilling of borehole Ground Source SW

Page 56: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

56

Project Handling – How will we work together?

Enquiry made to Plumbcenter from installer

Kensa contacts installer directly to discuss project

Plumb Center quote installer

Installer places order with Plumb Center

Installer deals directly with Kensa during installation and commissioning

Page 57: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

57

Installer Training

One Day Hands-On Training for installersTraining held at the manufacturing facility in TruroCourses run throughout the summer months – March to September.Ideal for the Installer prior to the first install

Page 58: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Case Studies, Referrals, Installations MapKensa WebsiteAwardsTarget Projects

58

Marketing

Page 59: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

59

A Map of Kensa Installations

Over 2500 installations

Wide range of project sectors supplied including domestic, commercial, education, leisure, medical and hotels.

Library of case studies

Very satisfied customers prepared to act as referrals

Page 60: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

60

www.kensaengineering.com

Page 61: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Awards

Ashden Awards‘2008 UK Business of the Year’

2009 Housing Excellence Awards‘Product of the Year’

2009 Corgi Awards ‘Green Manufacturer of the Year

61

2011 Ethical Consumer ‘Best Buy’ – Ground source heat pump.

Page 62: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

62

“‘By far the most helpful company from a technical point of view. Kensa's understanding of our needs have been excellent and they communicate ideas and new products regularly with us.”

****“Great supplier - realistic and well designed product that is made for the UK Market.”

****“We have been installing Kensa heat pumps for some time and have always had an exceptional level of service

from a very knowledgeable team.”

Kensa Engineering recently secured the prestigious Green Manufacturer of the Year Award at the Corgi Awards 2009. Kensa achieved the highest average score, beating 20 other manufacturers including Worcester Bosch, Nibe, Vaillant, Baxi, and Viessmann.

Green Manufacturer of the Year 2009

Page 63: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

63

Kensa Rated #1 Manufacturer

In July 2011, Kensa were rated the “best buy” in The Guardian, based on a report carried out by EthicalConsumer.org

Page 64: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

64

Target Projects

Domestic or Commercial New Build

Waterside Developments

Commercial Projects such as schools, offices, retail outlets etc.

Barn conversions

Holiday lets, holiday parks especially with swimming pools

Retrofit properties off the gas grid, well insulated with land

Page 65: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

25kW High Temperature unitTwo Hybrid Single phase heat pumpsNew controls packageHeat MetersThe Ssssshhhooo

65

New for 2012

Page 66: An Installers Guide to GSHP

© Kensa Engineering Ltd 2011

Niche market products Integration solutions – wood burningExperienceExpertiseDelivered the largest social housing project 300 units and growingCase HistorySpecialist – RNLIEasy to deal with

66

Summary