County and Local Transportation Infrastructure Needs North Dakota Transportation Coalition October 27, 2014 Denver Tolliver Director: Upper Great Plains Transportation Institute

County and Local Transportation Infrastructure Needs

  • Upload
    ugpti

  • View
    166

  • Download
    1

Embed Size (px)

DESCRIPTION

UGPTI Director Denver Tolliver provided an update on the Institute’s studies to the North Dakota Transportation Coalition. The updated included an overview of several studies underway, a summary of results and remaining tasks and their timeline for completion.

Citation preview

Page 1: County and Local Transportation Infrastructure Needs

County and Local Transportation

Infrastructure Needs

North Dakota Transportation Coalition

October 27, 2014

Denver Tolliver

Director: Upper Great Plains Transportation Institute

Page 2: County and Local Transportation Infrastructure Needs

Contents

• Overview of studies

– Roads and bridges

– 4-county study

– Regional railroad study

• Overview of approach

• Summary of results

• Remaining tasks and timeline

Page 3: County and Local Transportation Infrastructure Needs

Background

• Third study for legislature and governor

• Requested to present to interim committees:

– Economic Impact

– Energy Development and Transmission

– Budget Section

• Periodic updates for NDDOT

Page 4: County and Local Transportation Infrastructure Needs

pg. 4

Key Factors in County Road Study

Oil and Gas Agriculture

Number of wells Cultivated acres

Well locations Crop mix

Production rate/curve Yield

Inputs/outputs Crop densitiesGathering pipeline

Elevator network

Page 5: County and Local Transportation Infrastructure Needs

Key Factors in Road Study (cont.)

Slide 5

Traffic Road

Truck trips Surface type

Truck axles/weights Width & design

ESALs Age & condition

Avg. Daily Traffic Soil

Page 6: County and Local Transportation Infrastructure Needs

Infrastructure Data Collection

• Goal: build a consistent county database across state

• Traffic counts and vehicle classifications

• Road geometry [width]

• Road structure [layers, depths, support]

• Current road condition

• Road jurisdiction/ownership

• Bridge attributes

Page 7: County and Local Transportation Infrastructure Needs

2013

Slide 8

Page 8: County and Local Transportation Infrastructure Needs

Pavement Data Collection

• Condition Data Collection– Collect data with NDDOT pathway van

– 5,600 miles of paved county roads

– Will not collect short segments

– Van will provide consistent pavement distress and ride information

– Collection in July, August, Sep. 2013

Objective – collect pavement distress, ride , strength and geometric information on paved county roads to determine remaining life and projected construction costs

Slide 9

Page 9: County and Local Transportation Infrastructure Needs

Pavement Data Collection• Non-Destructive Testing - verify prior estimates on subgrade

strength

– Falling Weight Deflectometer (FWD) and Ground Penetrating Radar (GPR)

– Western ND – all pavements not recently improved

– Eastern ND – selected based on agricultural production facilities and other major traffic generators

– FWD will be done first and GPR will be done on the sites thumped with FWD

Slide 10

Page 10: County and Local Transportation Infrastructure Needs

Data Collection: County Survey

• Aggregate (gravel) costs

• Gravel production techniques

• Placement costs

• Transportation costs from pit to roads

• Dust suppressant usage/costs

• Stabilization usage/costs

• Intermediate practices

– Stabilization armor coat

– Double chip seal/armor coat

– Others

Slide 11

Page 11: County and Local Transportation Infrastructure Needs

Model Components

UGPTI County and Township Road

Infrastructure Needs

12

• 20 year forecasts for agricultural and oil production

• Ag forecasts specific to township and crop

– Reflect county yields and yield forecasts

– Changing crop mix

• Oil forecasts

– Specific to spacing unit

– Reflect filling in over time

– All inputs and outputs

• Baseline traffic

Page 12: County and Local Transportation Infrastructure Needs

Drilling Related Truck Movements

Page 13: County and Local Transportation Infrastructure Needs

Agricultural Analysis

Crop production

Elevator & plant demands

Known

Known

Truck trips and routesPredict

Segment specific trafficEstimate

Data: crop production (NASS), elevator volumes (NDPSC), in-state processors (survey), road network (NDDOT-GIS Hub), local road data (2008 survey)

Slide 14

Page 14: County and Local Transportation Infrastructure Needs

Crop Production and Location

Slide 15

Page 15: County and Local Transportation Infrastructure Needs

Wheat Movements

Slide 16

Page 16: County and Local Transportation Infrastructure Needs

Gravel Road Analysis• Life-cycle cost analysis - practices

– Graveling and blading

• Normal levels (e.g. regraveling every 5 years, blade once per month)

• Increased levels (e.g. regraveling every 3-4 years, blade twice per month)

• High levels (e.g. regraveling every 2-3 years, blade once per week)

• Usage of dust suppressant on impacted roads

Slide 17

Page 17: County and Local Transportation Infrastructure Needs

Paved Road Analysis Process

• AASHTO 1993 Design Guide

• Predict year & type of improvement

• Improvement threshold based on pavement condition

• Year of improvement based on:

– Existing structural capacity

– Existing condition

– Forecasted ESALs (Equiv. Single Axle Loads)

Slide 18

Page 18: County and Local Transportation Infrastructure Needs

Paved Road Improvements/Maint.

• Improvement type– Overlay

– Sliver widening

– Reconstruction

– Mine & blend

• Normal maintenance– Chip seals

– Crack sealing and patching

– Other

Slide 19

Page 19: County and Local Transportation Infrastructure Needs

County Bridge Analysis

• Current NBI (County and Township)

– Identified structurally deficient and functionally obsolete bridges

– Estimate replacement unit cost from recent ND bridge projects

– Survey counties for biennial maintenance cost

– Forecast replacement of deficient and obsolete bridge

Slide 20

Page 20: County and Local Transportation Infrastructure Needs

County and Township Bridges

• 37% are 50 years or older

• Over 20% are structurally deficient; others are functionally obsolete

• 490 bridges with capital improvement needs; almost all immediate

• $329 million of needs ($251 million for replacement)

Slide 21

Page 21: County and Local Transportation Infrastructure Needs

Status of County Bridges

Slide 22

Status (2013) Number Percentage

Not Deficient 1,729 70.11%

Structurally Deficient 552 22.39%

Functionally Obsolete 185 7.5%

Total Bridges 2,466 100%

Page 22: County and Local Transportation Infrastructure Needs

Projected Bridge Improvements

Slide 23

Treatment Number Subtotal

Deck Rehabilitation 4 99

Rehab. & Widening 95

Bridge Replacement 110390

Culvert Replacement 280

Page 23: County and Local Transportation Infrastructure Needs

County and Township Roads

• Paved road improvement needs:

– Resurfacing

– Widening

– Reconstruction

– Preservation/ maintenance

• Unpaved road needs

– Accelerated maintenance (graveling and blading)

Slide 24

Page 24: County and Local Transportation Infrastructure Needs

County Road Investment Needs by Surface Type ($2014 Million)

Slide 25

Biennium Gravel Paved Total

2015-2016 $606.40 $395.00 $1,001.40

2017-2018 $547.60 $345.60 $893.20

2019-2020 $547.60 $305.33 $852.93

2015-2034 $5,456.60 $2,744.15 $8,200.75

Page 25: County and Local Transportation Infrastructure Needs

County Road Investment Needs by Region ($2014 Million)

Slide 26

Biennium East West

2015-2016 46% 54%

2017-2018 52% 48%

2019-2020 45% 55%

2021-2022 44% 56%

2015-2034 49% 51%

Page 26: County and Local Transportation Infrastructure Needs

Regional Railroad Infrastructure

• 1,200+ miles

• Inherited from Class I railroads

• Mostly light weight rails: age 100+ years

• Important to agriculture and energy

• Accumulated investment needs

Slide 27

Page 27: County and Local Transportation Infrastructure Needs

Rail Weights (lb/yd) ND Regional Railroads

Slide 28

67%

29%

4%

< = 90

100-115

132 >

Page 28: County and Local Transportation Infrastructure Needs

Rail Weights: U.S. Class I Railroads

Slide 29

3%

27%

61%

9%

< 90

100-129

130-139

140+

Page 29: County and Local Transportation Infrastructure Needs

Next Steps/Timeline

• Comments on county road study

• 4-county study

• Regional railroad study

• Expected reports to legislature

Slide 30