A presentation by Theodore L. Grabarz, AIA, ASLA Sustainability Director, City of Bridgeport.Bridgeport Harbor and Riverfront RecaptureLegal and Land Use Training Workshop.City of Bridgeport Sustainability ProgramBGREEN to Be the Future.

Citation preview

Page 1: Bgreen the future  6 4-11 compatibility mode

Bridgeport Harbor and Riverfront Recapture Legal and Land Use Training WorkshopCity of Bridgeport Sustainability Program

BGREEN to Be the FutureTheodore L. Grabarz, AIA, ASLA Sustainability Director, City of Bridgeport.

6/6/2011 1

Page 2: Bgreen the future  6 4-11 compatibility mode

1. Focus on Sustainability – For Future Generations

2. Focus on Carbon Balance – Public Sector Low – Private . ocus o C bo ce ub c Sec o ow v eSector High Steering the Ship Not Driving the Ship

3. Focus on Building the Demand Signal (Economic Driver) for Sustainability in Private Sector Proof of Concept Projects. . Sustainability in Private Sector- Proof of Concept Projects and institute sustainability in our best practices and offer incentives to expand in private sector (zoning and density bonuses/partner on public sector solar programs etc) andbonuses/partner on public sector solar programs etc) and with our private sector affiliates BRBC etc.

4. Focus on Funding – When dollars are scarce focus on the seemingly little things and stick with it build partnershipsseemingly little things and stick with it –build partnerships

5. Focus on Marketing – Spreading the word, developing behavioral investment in residents (what is in it for them daily– reduction in particulates, parks access, etc, through on the ground connections.

6. Focus on Access and the Environment – Wise Use and Human

6/6/2011 2

Ecology because ultimately it comes down to Human Health

Page 3: Bgreen the future  6 4-11 compatibility mode

Sustainability = Responsibility. .

. “Meeting the needs of the present, without compromising the ability of future generations to meet their own needs”.

(Intergovernmental Panel on Climate Ch Ri Di J 1992)

6/6/2011 3

Change, Rio Di Janero,1992)

Page 4: Bgreen the future  6 4-11 compatibility mode

The New Currency or Medium of ExchangeN t l R Hi t i ll t l. . Natural Resources - Historically natural resources have been a factor of production like soil, water, air or oil or their analogs-soil nutrients, storm-water CO2 or carbon etcwater, CO2, or carbon, etc.

Now- They are more and more considered to be “capital assets”, or things that we use to make other things , use to generate wealth, to increase our productivity and thus have value unto themselves as factor multipliers. (green infrastructure).

They are the new medium of exchange or currencyof ours and future generations largely defined byEnergy in different forms. Specifically as carbon

6/6/2011 4

credits, renewable energy credits etc.

Page 5: Bgreen the future  6 4-11 compatibility mode

Enhanced of Life for Future Generations

Mayor Finch Mission StatementM i B id t F d A Vi i f. .

Sustainability DefinedSustainability Defined

Moving Bridgeport Forward: A Vision for our CommunityWe are committed to making Bridgeport the cleanest, greenest, safest, most affordable city with schools and neighborhoods that improve every year by:•Developing innovative approaches to improving the

“Meeting the needs of the present without “Meeting the needs of the present without compromisingcompromising the ability of future generations tothe ability of future generations to

Developing innovative approaches to improving the quality of our education system •Making our streets and citizens safer •Expanding economic development •Building more workforce housing •Supporting a healthier lifestylecompromisingcompromising the ability of future generations to the ability of future generations to

meet their own needs”. meet their own needs”.

(Intergovernmental Panel on Climate Change, (Intergovernmental Panel on Climate Change,

•Supporting a healthier lifestyle •Revitalizing our neighborhoods •Providing more local jobs and small business opportunities •Protecting our environment and greening our city

Rio Di Janero,1992)Rio Di Janero,1992)Protecting our environment and greening our city

•Creating a leaner, more efficient government •Accessing 21st Century technology and infrastructure

6/6/2011 5

•Supporting the Arts •Ensuring a vibrant, diverse community Reducing property taxes

Page 6: Bgreen the future  6 4-11 compatibility mode

2008 - Mayors Executive Order1. Brownfield's redevelopment (XX % cleaned up and on tax roles by 2020).

2. Energy Audit all City Buildings (Reduction of XX by 2020).

3. Energy Improvement District (By 2020, 40% electricity from renewable resources)

4. City Open Space and Tree Canopy Assessment (Increase tree canopy by XX% or xxxx trees by4. City Open Space and Tree Canopy Assessment (Increase tree canopy by XX% or xxxx trees by 2020).

5. Increased Recycling (Diversion rate, 15% by 2010)

6. Stormwater Management through Low Impact Techniques

7. Green Building Standards (All City of Bridgeport construction, LEEDS Silver certified).

8. Green Jobs Initiative (Create xx jobs by 2020).

9 Purchase of Hybrid or Alternative Fuel Vehicles (Red ce f el cons mption b 15% b 2020). .

Starting with the Mayors Executive Order (2008) which targets a number of Starting with the Mayors Executive Order (2008) which targets a number of reductions ultimately dealing with energy and the reduction of greenhouse gas reductions ultimately dealing with energy and the reduction of greenhouse gas

9. Purchase of Hybrid or Alternative Fuel Vehicles (Reduce fuel consumption by 15% by 2020).

6/6/2011 6

emissions , there are five key concepts that this program focuses on, and is easy to emissions , there are five key concepts that this program focuses on, and is easy to describe describe and valueand value in the public and private sector: in the public and private sector:

Page 7: Bgreen the future  6 4-11 compatibility mode

2009 - Planning Efforts http://www.rpa.org/bgreen/g•Conceptual Development of Sustainability Issues and TBL (Triple Bottom Line) Prioritization. . •Social – Environmental –Economic all in one

14 elements that shape our14 elements that shape our communities

•First TBL Assessment in Connecticut

•Creating a Sustainability Mindset-Evaluating interactions-Going beyond historically recognized impacts-Opportunities for

h i /b d i i i i i

6/6/2011 7

strengthening/broadening initiatives

Page 8: Bgreen the future  6 4-11 compatibility mode

Five Key Conceptsy p

1. Reduced toxicity and pollution release . . leading to reduced potential impact on

human health and the environment. (non-toxic office, cleaning and construction supplies).

2. Reduced waste generation through increased recycled content. (recycling and green procurement).

3. Reduced non-renewable energy consumption. (conservation and behavioral changes -turn the lights off!)turn the lights off!)

4. Reduction of the depletion of natural resources. (water saving devices, green infrastructure).

6/6/2011 8

( g , g )

5. Support for sustainable manufacture/local purchasing. (organic food locally grown food hubs).

Page 9: Bgreen the future  6 4-11 compatibility mode

S t i bilit Ti li 2011Sustainability Timeline 2011Jan                   Feb                 Mar               Apr              May       Jun       Jul              Aug         Sep     Oct Nov  Dec

6/6/2011 9

Page 10: Bgreen the future  6 4-11 compatibility mode

Organizational Framework

The Mayor Bill Finch

FrameworkTed Grabarz

City of BridgeportSustainability Director

for Implementation

Andrew Nunn, CAO/Paul

Timpanelli BRBC

. . City of Bridgeport DepartmentsDeb Caviness, Alanna Kabel

Lisa Miro-Conservation CorpsSabine Kuzko-Housing/Com Dev

John Cottell-Public FacilitiesPaul Catino-Public Facilities

Bernd Tardy-PurchasingEd Lavernoich-OPED

Community Advisory Board

Jeff LeichtmanSustainability

Consultant

David Kooris/Evelyn Lee Regional Planning

Association

Ed Lavernoich OPEDAlex McGoldrick-CG

Lisa TrachtenburgAijaz SyedMike Nidoh

Fernanda OliveraArt Harris

Steve HladunJohn Tristine

Resource Committee

G

J

Working Group Working Group Working Group Working Group Working Group

Green Energy/Green

Buildings CommitteeBill Leahy

Tom McCarthy

Green Space, Recycling and

Water Resources Committee

Greg DanchoDick Tiani

Green Business, Jobs and

Purchasing Committee

Susan DavisAnne Robinson

Greenfields and Green Wheels

CommitteeBarbara MillerRon Kilcoyne

Green Marketing and Education

CommitteeChanti Haynes

6/6/2011 10

Page 11: Bgreen the future  6 4-11 compatibility mode

Potential S stainabilit Economic ImpactPotential Sustainability Economic ImpactSupply

P i 1. .

Demand

Price-1

Price-2

Gov’t

Subsidy

Quantity

Each of these key areas has three sectors: government, households and business, of which government is by far the smallest in terms of impact and indeed in terms of environmental footprint as well. Therefore this program focuses on leading the way with government, showing the solutions h b id d b i i h h ld d l i l b i ithat can be provided by government, to inspire households and ultimately businesses to invest.

11

As the Mayor likes to say, the business of government is to steer the ship not drive the ship.

Page 12: Bgreen the future  6 4-11 compatibility mode

Public versus Private Sector Involvement P

1. Concept 1. Concept Supply

P i 1

10

Publi

2. Public 2. Public InvestmentInvestment Demand

Price-1

Price-2

Gov’t

Subsidy20c

Sec

3. Outreach 3. Outreach Event Event

Quantity

30

ctor

4. PILOT4. PILOT40

Invol

5004

veme

03 02 0105

12

04nt

Private Sector Involvement

03 02 0105

Page 13: Bgreen the future  6 4-11 compatibility mode

Bridgeport Energy Economic Impact. . Impact

Group # Accounts Annual kWh Summer Peak kW

Winter Peak kW Summer kWh Winter kWh

Commercial 5,122 355,449,216 98,672 101,919 40,289,295 67,737,718 Industrial 235 56,329,128 19,931 20,302 6,975,064 12,698,814Industrial 235 56,329,128 19,931 20,302 6,975,064 12,698,814

Residential 53,361 283,307,125 2,718 3,212 81,453,872 155,453,872 Bridgeport Total 58,718 695,085,469 121,321 125,433 128,718,231 235,890,404

6/6/2011 13

Page 14: Bgreen the future  6 4-11 compatibility mode

Creating that Demand Signal to the Private Sector -Process Solutions

1. Regulatory–New Planning and Zoning Regulations

. . a. PILOP Ordinance: (Payment in Lieu of Parking): Example: 100 parking spaces otherwise required x $17K per space in structured parking= $1.7M. Developer pays an annual fee into Trust Fund for sustainability instead at Y per space (0.1 x $17k +-) and parks in public space. Reduces cost of development and facilitates more permeable surfaces on site.

b. LEEDS Bonuses: Green Building Design: A building designed to meet LEED (see below for definition) Silver or equivalent shall receive a development bonus of 0.5 FAR. A building designed to meet LEED Gold or equivalent shall receive a development bonus of 0.625 FAR. A building designed to meet LEED Platinum or equivalent shall receive a development bonus of 0.75 FAR.

c. New Public Open Space: A portion of a zoning lot that is developed as a public open space having frontage on a public street or public pedestrian way, beyond those areas required by the zone development standards (excepting that new waterfront access required within the DVD-W shall remain eligible), shall result in one square foot of additional development for each one square foot of public open space.

d. Stormwater Regulations Water Quality, Water Quantity, Channel Protection, and Flood Control Requirements- One acre permeable surface = $30K savings at WPCA Preference for water management through infiltration

14

WPCA. Preference for water management through infiltration.

Page 15: Bgreen the future  6 4-11 compatibility mode

Creating that Demand Signal to the Private Sector -Resource Solutions

2. Operations and Maintenance –Environmental Enhancement

. . a. Commercial Recycling: Example: Estimate 1000 tons commercial recycling generated downtown. Costs business owners $59.00/ton to remove. City will take away for free and gain $5/ton bonus + add to the total to meet our minimum commitment. Business saves the cost of recycling tonnage removal.

Energy Conservation

b. Energy Performance Contracting: Used for City and School buildings and will be offered to businesses as well. Audit/Upgrade/Payback. Through Savings

Alternative Energy

c. Solar Photo-Voltaic: Solar roof top and vacant land leasing for city buildings and schools and businesses with Power Purchase Agreement.

d. Energy Improvement District: Bonding Authority off of City Budget to fund alternative energy as well as conservation strategies for government, businesses and homeowners including energy aggregation services providing lower cost electricity to consumers, businesses and government with a significant renewable component.

6/6/2011 15

Page 16: Bgreen the future  6 4-11 compatibility mode

Strategic Communication gThe last part of my Sustainability Program is Green Marketing and Education. A singular difference in my program though is that marketing to me isn’t about sales, its about strategic communication, conveying ideas through action, actions as I’ve described to facilitate changes i b h i i iin behavior in our consumers, our constituents, our society writ large

Savings up to 693 KwH / year x 34000 g p yHH = 23,562, 000 KwH per year (or 23 cents x 23,562, 000 = $5, 419,260.00 ) That’s almost 8% of residential use!

0100200 Home Energy Audit

Clean energy

Solar energy

6/6/2011 16

Home Energy AuditRain barrels/ garden

B Green Program

Request Recycling Bin

Total Households Visited

Page 17: Bgreen the future  6 4-11 compatibility mode

Energy StewardshipEnergy Conservation

1. Energy Performance Contracting-Reducing Energy Use in our Buildings.

2. Energy Due Diligence- Reducing Energy Use by Other Systems, GPS in Vehicles etc.

3. Consolidation- Reducing Energy Use by selling off g gy y gBuildings.

4. Transit First Policy- Encouraging mass transit use as well as multi-modal options, walking, biking, etc. 6/6/2011 17

Page 18: Bgreen the future  6 4-11 compatibility mode

Energy StewardshipAlternative Energy Enhancement

Energy Stewardship

1. Energy Improvement District –Bonding Authority and Ability to direct own energy resources.

2. Biomass Program- Alternative Energy Production from Sewage Sludge.

3. Solar Photo Voltaic Options- Developer directed solar options on vacant land and roof tops. p p

4. Green Energy Park at the Seaside fi

6/6/2011 18

Park Landfill- Alternative Energy development on a brown-field.

Page 19: Bgreen the future  6 4-11 compatibility mode

E I t Di t i tEnergy Improvement District 1. Provides an energy overlay of City for:

2.  Bonding Authority and Ability to direct own energy resources to inspire economic development through long term stability of energy prices

1. EID established and approved by Council.Council.

2. Board established and approved by Council.

3. Bylaws created.y4. Operational budget and organizational

chart created.5. Project Management RFQ out.

6/6/2011 19

Page 20: Bgreen the future  6 4-11 compatibility mode

El t i l A tiElectrical Aggregation

1 Ci i i RFP f i1. City is putting an RFP for aggregation services to be able to lock in electrical rates for a variety of service types including: seniors veterans smallincluding: seniors, veterans, small and disadvantaged businesses.

2 Through locking in rates it will2. Through locking in rates it will minimize spikes due to supply shocks, seasonal fluctuations etc.

S Wi t

6/6/2011 20

Group # Accounts Annual kWh Summer Peak kW

Winter Peak kW Summer kWh Winter kWh

Commercial 5,122 355,449,216 98,672 101,919 40,289,295 67,737,718 Industrial 235 56,329,128 19,931 20,302 6,975,064 12,698,814

Residential 53,361 283,307,125 2,718 3,212 81,453,872 155,453,872 Bridgeport Total 58,718 695,085,469 121,321 125,433 128,718,231 235,890,404

Page 21: Bgreen the future  6 4-11 compatibility mode

Biomass Program Feasibility Alternative Energy Production from Sewage Sludge

g y

Sludge.1. Stearns and Wheler retained to perform study

on viability of generating clean energy from sludge. On track for completion October 1, 2010.

2. Yale graduate students from Industrial Ecology program have already provided basis of concepts.

BIOMASS PROCESS FLOW CITY OF BRIDGEPORT

Solid Waste

WPCA

UI

RESCO

Domestic Wastewater

Electric Power to 

Treated Effluent To 

Sikorsky  Unused Parking Areas 

Potential Staging Area for

Sludge Generation

Sludge Processing:  Heat to dry it ( f b i ) h

Clean Water Generation

Resco

6/6/2011 21Additional Resource Input

Potential  Staging Area for Biomass  

Wood ChipsSolid Food Waste

Waste Heat  to sludge 

(prepare for combustion) or heat to digest it (produces usable biogas) [potential RESCO Site]

Dried Sludge or Gas to Resco

Page 22: Bgreen the future  6 4-11 compatibility mode

Solar Photo Voltaic Options-Solar Photo Voltaic OptionsDeveloper directed solar leasing on city and school roof tops.

1. RFQ solicited 12 firms2. Main Street Power selected from

Boulder, CO3. Focusing on 20 city buildings and

schools, 3.2 Mw of clean energy. 4. Will provide power 4 cents below

current retail. 5. Starting with municipal

t d ff i t thgovernment and offering to the private sector.

6/6/2011 22

Page 23: Bgreen the future  6 4-11 compatibility mode

Green Energy Park at the Seaside Park Landfill-Alternative Energy development on a brown-field.

11. RFQ Issued and 4 respondents. 2. Subsequent to selection process Turtle

Energy/Tychon Construction selected as developer with Photo Voltaic design.developer with Photo Voltaic design.

3. Stewardship Permit finalized with DEP. 4. In Agreement Negotiation phase.

6/6/2011 23

Page 24: Bgreen the future  6 4-11 compatibility mode

Energy Performance 8.01

4 935.28

5 05

9.24

6.00

7.00

8.00

9.00

10.00

qFt

Cost per Squarefoot per Facility

gyContracting-

1 RFQ l d i 14 fi b i i

3.38

2.18

4.37

2.68

3.31

0.00

0.54

2.07

2.782.50

2.73

1.87

3.122.64

2.07

4.55

0.31

1.92

2.94

2.34

3.75

3.08

4.57

2.45

4.93

1.80

2.87

3.71

2.85

0.890.64

5.05

0.00

1.00

2.00

3.00

4.00

5.00

Cost

/S

1. RFQ process resulted in 14 firms submitting for the work on performing energy upgrades to 3,000,000 square feet of city buildings and schools.

290.7

173.9

202.8192.4

202.1

362.0

200.0

250.0

300.0

350.0

400.0

TU/S

qFT

2. Three firms selected for RFP, awaiting results September 9, 2010

102.5119.1

133.6

94.7

143.4

0.0

27.0

98.2

121.8

94.2100.3

70.6

136.4

89.3

68.9

144.2

4.9

64.4

40.6

66.4

112.0119.0

98.2

76.4

109.8

132.7

93.4

43.3

20.3

0.0

50.0

100.0

150.0

kBT

Facilities

6/6/2011 24

Page 25: Bgreen the future  6 4-11 compatibility mode

Environmental StewardshipEnvironmental ConservationEnvironmental Conservation

Conservation Commission Establishment – As an advisory body to the Planning and Zoning Commission a Conservationbody to the Planning and Zoning Commission, a Conservation Commission would be a key stakeholder in the identification of biota within the City, make recommendations for the Plan of Conservation and Development and be the primary advocate for the natural resources within the City.

Stormwater Authority- To manage our stormwater as a resource.

Parks Biodiversity Assessment- An assessment of the natural resource attributes in existence in the City.

6/6/2011 25

Page 26: Bgreen the future  6 4-11 compatibility mode

Environmental StewardshipEnvironmental Enhancement

1. Recycling –

2. Green Infrastructure –

High Impact Areas-Focus for an engineered solution will be accelerated. Low Impact Areas- For more residential neighborhoods a focus will be on so called Low Impact Development or reducing impermeable surfaces

3 Green-scaper Training-3. Green-scaper Training-

4. Tree Canopy Enhancement -

6/6/2011 26

6. Brownfield’s to Bright-fields-

7. Community Gardens –

Page 27: Bgreen the future  6 4-11 compatibility mode

Recycling Enhancement -

1. Recycling Rewards Program to begin with Recycle Bank thebegin with Recycle Bank the week of School Opening.

2. 5200 households in East Sid /E E d b dSide/East End to be targeted.

3. Goal is to triple City’s recycling rate in order to y gincrease diversion rate and thus save money

Total Residential Recycling

10001500200025003000

Total Residential Recycling

Total Residential R li

6/6/2011 270

5001000

0 2 4 6

Recycling

Page 28: Bgreen the future  6 4-11 compatibility mode

G T i iGreenscaper Training

1 Developed a1. Developed a program between Rutgers University, UCONNUniversity, UCONN and EPA to train the next generation of landscapers in Low pImpact Development.

2. Attendance exceeded all expectations-50+

6/6/2011 28

Page 29: Bgreen the future  6 4-11 compatibility mode

Solid Waste and Recycling WorkshopSolid Waste and Recycling Workshop“Turning Garbage into Gold”

1. WORKSHOP on Recycling and Community Economic Development sponsored by City of Bridgeport Sustainability Program Be Green 2020, US Environmental Protection Agency-New England and the Institute of Local Self Reliance (ILSR)

Neil Seldman, ILSR, Washington DCBest economic development practices with regard to recycling and composting

Terry McDonald, St. Vincent De Paul, Eugene, OregonRepair and resale enterprises

Ted Reiff, The Reuse People, Oakland, CaliforniaNetwork of deconstruction companiesAndy Bozzuto, Johns Refuse Company, New Haven, ConnecticutRecycling and Composting operations

29

John Gundling, Integrated Green, Inc., Bridgeport, ConnecticutConstruction and Demolition Recycling Enterprise

Page 30: Bgreen the future  6 4-11 compatibility mode

Complete StreetsComplete Streets Program

1. City formed working group January 2010.

2. Developed consensus from2. Developed consensus from stakeholders on Park Avenue and Railroad Avenue.

3. Completed Assessments from pboth GBRPA and OPED.

4. Tying in regional bike trail along with pedestrian, bike, intermodal, tree cover enhancement and permeable surfaces and bio-

l f t t h

6/6/2011 30

swales for storm water recharge.5. 5. Implementation Fall 2010.

Page 31: Bgreen the future  6 4-11 compatibility mode

Consolidation Program 1. To save energy and utilities, increase1. To save energy and utilities, increase operating efficiencies and return buildings to tax rolls.

Health Department

Public Facilities Complex1. Seaview Avenue Facility to Public Facilities Complex Moved 20082 Environmental Health2. Environmental Health and Housing Code – Moved 7/19/10.3. Vital Statistics and

Mc Levy Hall

BOECity Hall Annex

Registrar of Voters – Move October 1, 20104. Probate Court- Move March 1 2011

6/6/2011 31

March 1, 20115. Public Facilities/Parks-2012-Remediation on-going.

Page 32: Bgreen the future  6 4-11 compatibility mode

Energy Strategy gy gyfor City of Bridgeport

800

1000

1200

1400

1600

ns (MtCO2e

)1. Green House Gas Inventory

0

200

400

600

rnum

 Museu

mck Rock Sr. C

tr.

City Hall

City Hall A

nnex

Eisenh

ower

Fire ‐EO

CEngine

 10 New

 Engine 10

 Old

Fire Engine 12

Fire Engine 15

Fire Engine 16

Fire Engine 3/4

Fire Engine 6

re Engine 7/11

e Headq

uarters

Health

/Welfare

Klein Bu

ilding 1

ry ‐Black Ro

ckary ‐Burroughs

rary ‐New

field

ary ‐N

orth End

Old M

ill Green

McLevy Hall

PAL

demy New

field

al She

lter New

mal She

lter Old

Comm. Servies

ce ‐ES Precinct

‐Headq

uarters

e ‐W

S Precinct

b Fac Bu

ildings

a Taylor Cen

ter

ransfer Statio

nWhe

eler Cen

ter

GHG Emisio

completed 2008

2. Energy Strategy

Bar

Blac C

Fire E

Fire

F Fir

Fire H K

Libra

Libra

Libr

Libra

Library ‐O

Police ‐A

cad

Police ‐A

nima

Police ‐A

nim

Police ‐C

Polic

Police ‐

Police

Pub

Ralpho

la Tr W

Facility

Completed 2010

6/6/2011 32

Page 33: Bgreen the future  6 4-11 compatibility mode

CLG Truck Conversions 1 Retrofit of 4 snow1. Retrofit of 4 - snow

plow trucks from Diesel to Liquified Natural Gas.Natural Gas.

2. Grant provided through ARRA funds.

3. Target completion date g p11/1/10

6/6/2011 33

Page 34: Bgreen the future  6 4-11 compatibility mode

Seaside Village gGreen Infrastructure

1. Developing a replicable model through The Yale Urban Design Workshop for green infrastructure, Low Impact Development components as an alternative to engineered structure.

2 Utili i hi t i S id2. Utilizing historic Seaside Village with Relative 0.00’ that is subject to constant flooding as test case

6/6/2011 34

flooding as test case.

Page 35: Bgreen the future  6 4-11 compatibility mode

AIA Sustainability Design Assessment Team y g1. September 13-15, 2010.

Charge is to find ways to link the various neighborhoods together sustainably.

ildi d2. Building on ULI Study that created NRZ’s as well as Plan of Conservation andConservation and Development, this inclusive planning effort will seek to bring thewill seek to bring the NRZ’s one step further.

6/6/2011 35

Page 36: Bgreen the future  6 4-11 compatibility mode

Parks Master Plan

1. Parks Master Plan for the City of Bridgeport to establish a vision for the Park City for the nextestablish a vision for the Park City for the next 100 years.

2. RFQ issued, 14 respondents interviewed.2. RFQ issued, 14 respondents interviewed.3. Five -5- firms selected for RFP.

1.

2.

3.

4. 5.

6.

7.8.7A.

9.

10.

11.12.

13.

14.

15.

17.

18.19.

20.

21.

25.

28.

29.

23.

26.

30.

27.

31.

33. 32.

16.

22.

24. 28 A.

21 A.21 B.

18 A.

10 A.

6/6/2011 36

35.34.

36.

37.

38.

39.

40.

Page 37: Bgreen the future  6 4-11 compatibility mode

Parks- Pleasure Beach Master Plan – Passive and Active Recreation Enhancements

1. RFQ advertised.2. 14 landscape

architecture firms have submitted for design

3 P i t b i3. Preparing to begin selection process.

6/6/2011 37

Page 38: Bgreen the future  6 4-11 compatibility mode

Parks- Pleasure Beach Facilities Refurbishment

1. RFQ advertised.

2. 13 professional architecture firms have submitted for design services. g

3. Qualifications review and 6 firms selected for interviews.

6/6/2011 38

Page 39: Bgreen the future  6 4-11 compatibility mode

Parks Physical Implementation y p

Pocket Park

Pequannock Pocket Park –1. Design Completed – June

2010 Pocket Park Design –Knowlton and Grand Street

20102. Construction- Fall 2010

City Hall Annex Pocket ParkCity Hall Annex Pocket Park

1. Design Competition- Fall 2010

6/6/2011 39

Page 40: Bgreen the future  6 4-11 compatibility mode

Tree Canopy

1 Ad t T P

pyEnhancement -

1. Adopt a Tree Program -Over 200 trees planted to date by City Forces.

2. Ground Works program with xx trees planted and corporate donationscorporate donations obtained.

3. Contractor Based Program – To start in Fall, Goal 2012 trees by 2012.

6/6/2011 40

Page 41: Bgreen the future  6 4-11 compatibility mode

Pequannock River qWatershed Enhancement Program

1. Developing a regional L.I.D.1. Developing a regional L.I.D. solution (Monroe, Trumbull and Bridgeport) to the problems of water quality and enhanced recreation.

2. Consultant selected, Fuss and O’Neil.

3. Save the Sound performing Outreach.4. Project underway.

6/6/2011 41

Page 42: Bgreen the future  6 4-11 compatibility mode

Commercial 250

DSSD MSW + 0 Recycling Tonnage

Recycling PILOT 50

100

150

200

MSW Tonnage

02005 2006 2007 2008 2009 2010 2011

1. Currently very little recycling occurs within the business segment.

2. City will begin commercial recycling PILOT in association with Trevz Corporation this FallTrevz Corporation this Fall. 3. If successful, this will be expanded to DSSD thereby increasing City recycling satisfaction of its CRRA y gcommitment and saving businesses money. 6/6/2011 42

Page 43: Bgreen the future  6 4-11 compatibility mode

Green Procurement 1. Green Procurement - The City adopted a green procurement or environmentally preferredgreen procurement or environmentally preferredpurchasing policy January 2010 to purchase 40% green office supplies in next FY.

2. Promotes the practice of environmental sustainability and prudent use of resources to minimize the City’s purchasing practices from having an adverse impact on the environment andhaving an adverse impact on the environment and the health of its employees and residents.

3. FY09 spent $854K on office supplies of which approximately $460K was on paperapproximately $460K was on paper.

6/6/2011 43

Page 44: Bgreen the future  6 4-11 compatibility mode

Transportation Initiatives - Hertz pand Zip Car 1. The City of Bridgeport is looking

for ways to reduce the cost of its fleet.fleet.

2. This could involve options such as Zip Car and/or Hertz Rent a Car ride sharing.

3 Th Cit h 392 l t d hi l3. The City has 392 plated vehicles costing $495k per year to own and operate.

4. Finding ways to understand actual g yusage and partnering with business /universities can result in real $ and environmental savings.

6/6/2011 44

Page 45: Bgreen the future  6 4-11 compatibility mode

Urban FarmingAs part of the Sustainability Program effort there has been discussion on expanding the community gardens throughout the City and perhaps expand the possibility ofUrban Farming

ProblemsNo systematic/standard method for legal recognition of gardens on City propertyCity often gets stuck with unexpected and unbudgeted-for utility

throughout the City and perhaps expand the possibility of “urban farming” where urban farmers might purchase city land in order to commercially grow vegetables to be available to urban and other residents close to where they are grown

y g p g ybills Unaddressed potential liability in several formsNo defined operation/performance measuresNo process for clear indication of neighborhood support/commitmentGoalsProvide reasonable support for a Community Garden program as directed by a Mayoral administrationEstablish a formal process to gauge neighborhood/support commitmentEstablish formal process for legal recognition of gardens on City propertypropertyEnsure that responsibility for utilities is clearly definedAddress City liability issues as fully as possibleHold tenants/licensees accountable for some level of results/performanceRecommendationsCreate a Community Gardens Policy Statement for FinchCreate a Community Gardens Policy Statement for Finch Administration Establish a standardized petition for neighborhoods to circulate related to an organization’s request to establish a community gardenCreate simple guidelines for performance measuresC t t d di d d t ti f l

45

Create standardized documentation for leases, access agreements, and reportingOutline a step by step process for appropriate City agencies to review requests and seek necessary approvals for leases

Page 46: Bgreen the future  6 4-11 compatibility mode

Fuel Cell TechnologyFuel Cell Technology

Uniting three potential users without crossing a public ROW would all these three organizations:

id i h iBridgeport Housing AuthorityAquaculture SchoolCaptains Cove Marina

Bridgeport Housing Authority Aquaculture School

To participate in a clean energy solution of fuel cell technology

q

technology.

Currently being studied by CT Center for Advanced

6/6/2011 46

TechnologyCaptains Cove Marina

Page 47: Bgreen the future  6 4-11 compatibility mode

GPS Technology for a Common O ti Pi tOperating Picture GPS System- Through the use of a GPS System we have been able to track, reduce our use of fuel and better manage our fleet. Since January 2008 the City has g y yundertaken the installation of GPS units in 91 of its approximately 500 passenger vehicles in the City of Bridgeport’s municipal fleet. This has provided the added benefit of increasing situational awareness which facilitates the safety of personnel and the real timewhich facilitates the safety of personnel and the real-time ability to re-deploy forces as necessary to conduct other missions. A reduction of 4% of the fleet usage of fuel or 3,081 gallons is directly attributable to the use of GPS. Most notably one department was down 24% from 8,072 gallons in FY08 to 6,165 in FY09, a savings of 1,907 gallons. With 409 vehicles to go, and an average cost of $500/unit, the expectation is that if 100 vehicles could be outfitted per year and an average savings of fueloutfitted per year and an average savings of fuel representing 14% (24-4/2+4) 55,724-53,380=2,344 gallons saved for 91 vehicles or 2344/91= 26 gallons per year saved per vehicle. Assume 14% or 7801 gallons saved /191 vehicles = 41 gallons per

i 41 $3/ i

6/6/2011 47

vehicle saved per year. 41 gallons x $3/gallon gasoline x 191 vehicles = $23,493.00/$500/unit= 47 units purchased with savings in gasoline usage for next 100 vehicles.

Page 48: Bgreen the future  6 4-11 compatibility mode

Composting p g

1. The ability to utilize food waste and yard waste both from residences andyard waste both from residences and businesses is a potential untapped market. This product could be used for everything from fertilizer to bio-f l F bi f l j i ifuel. For bio-fuel a major positive factor is the lack of a feed-in commodity cost like there is for ethanol from corn.

2000

4000

6000

Leaves and Yard Waste

Leaves and Yard

2. The trend within the City as the graph shows is an increasing amount f d t th t i ll t d

0

2000

0 2 4 6

Wasteof yard waste that is collected every year.

6/6/2011 48

Page 49: Bgreen the future  6 4-11 compatibility mode

Theodore L. Grabarz, AIA, ASLAS t i bilit Di tSustainability DirectorCity of BridgeportDeputy Director of Public Facilities203 576 [email protected]

Questions?2011 A New Beginning2011 - A New Beginning

6/6/2011 49