7

FF OHB (Persiaran Tujuan SS18)

Embed Size (px)

Citation preview

Page 1: FF OHB (Persiaran Tujuan SS18)
Page 2: FF OHB (Persiaran Tujuan SS18)

Persiaran Tujuan

Page 3: FF OHB (Persiaran Tujuan SS18)

Location: Persiaran Tujuan, SS18

Size: 10’ x 100’ (2 Sided)

Traffic: 250,000 Motorists / day

Availability: Immediate

Rental: RM 170,000 p.a.

Production: RM 20,000

Lighting: RM 36,000 p.a.

persiaran tujuan

overhead bridge

Page 4: FF OHB (Persiaran Tujuan SS18)

site locationPersiaran Tujuan

Berhampiran SMKSU, SS18

Page 5: FF OHB (Persiaran Tujuan SS18)

General Reminders• All sites are subjected to availability on a first come first serve basis upon receive of

media booking

• Inclusive Agency Commission 15% (unless otherwise arranged)

• Available Period: Enquire

• Validity of offer – One Month from date of received

• All visuals are subjected to local council approval

• Media rental is subject to 6% GST which is payable by advertiser.

• Production cost quoted is based on basic design and does not include special effects/protrusions. Additional cost shall apply for such design.

• Bahasa Malaysia is compulsory and must not be smaller than other languages. All creative are subject to formal authority approval.

unipoles

Page 6: FF OHB (Persiaran Tujuan SS18)

[email protected]

+60122955516james wong

Page 7: FF OHB (Persiaran Tujuan SS18)

[email protected]

+60122955516james wong