  • TOM Hinton 3114 Victory Palm Dr.

    Edgewater Fl. 32141 US cell (321) 201-7313

    0BandPL@gmail.com

    OBJECTIVE:

    To obtain a permanent position in a growing company with advancement potential and an opportunity to

    put my experience to work. In the past 34 years I have acquired a wealth of knowledge that will benefit

    greatly any employer. I have an excellent track record of delivering projects on time and within budget.

    Please notice that while with DCK WW I went to problem jobs to get them back on track and compliant

    with specifications.

    My EMPLOYMENT

    6/15 to 4/16 TD Industries

    Construction Manager Special Projects, Ft. Worth Tx, Mechanical PM

    My duties include but are not limited to, all day to day mechanical trade work and adherence to

    schedules, review and approval of design documents and submittals, supervision of all phases of

    mechanical trades, ie. HVAC, chilled water piping, all duct and air handling equipment, Plumbing,

    Infrastructure, controls, TAB, grease hood ducting and testing. Full responsibility for all execution of such

    work including code compliance, testing and coordination with other trades, day to day operations of all

    field mechanical work and coordination and integration of these trades to facilitate needs and schedule,

    evaluation of design changes and scope mods as they pertain to these areas, also for all close out

    documentation and owner instructions as per our contract. Responsible for price checking MEP change

    orders from subcontractors and budget estimates for same. Most of our projects were on NAS JRB Ft. Worth

    and under USACE control. Had to use their QCS program for all QA/QC for all of my projects.

    12\14 to 6/15 Gallo and Associates

    Baha Mar Resort and Casino, Nassau, Bahamas, Senior MEP PM

    My duties included but were not limited to, review and approval of design documents, supervision of all

    phases of mechanical trades, ie. HVAC, chilled water piping, all duct and air handling equipment,

    Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full responsibility for all execution of

    such work including code compliance, testing and coordination with other trades, day to day operations of

    all field MEP work, quality control, coordination and integration of these contractors to fit the overall

    project needs. Also adherence to the schedule, evaluation of design changes and scope mods as they

    pertain to these areas and for all close out documentation, owner instructions and quality of the project

    as per our contract.

    6\14 to 12\14Layton/dck Pacific Hawaii JV

    Kapi'olani Medical Center Honolulu, Hi. MEP Coordinator/Supt My duties included but were not limited to, all day to day inspection of MEP trade work and adherence to

    schedules, review and approval of design documents, DFOWs and submittals, supervision of all phases of

    testing and documentation of mechanical trades. QA/QC of all HVAC, chilled water piping, all duct and air

    handling equipment, Plumbing, Electrical, Infrastructure, controls, TAB, grease hood ducting and Fire

    Sprinkler, including all initial, prep and follow up meetings. Full responsibility for all compliance of such work

    including code compliance, testing and coordination with other trades, day to day observation of all field

    MEP work, all site underground and drainage, compaction testing, asphalting the parking lot after such

    work was complete, and coordination and integration of these tasks to meet DCK's needs and schedule,

    evaluation of design changes and scope mods as they pertain to these areas, also for all documentation and

    reporting to third party inspector as per our contract. Responsible for checking MEP change orders from

    subcontractors and budget estimates for same. Also, was superintendent for the complete ground up build

    of the boiler/sterilizer building from underground until completion. This included all MEP, underground

    piping, reinforced concrete slab, block walls, roofing, windows and interior finishes.

  • 6/13 to 6/14 dck Pacific Guam,

    Guam Regional Medical Center, Dededo, Guam MEP QC

    My duties included but were not limited to, review and approval of submittals and DFOWs of MEP trades,

    QC of all phases of mechanical trades including all prep, initial and follow up meetings as they pertained to

    MEP, all lift plans that related to MEP, I was also associate QC for concrete, framing, interior finishes and

    infrastructure work, site and underground utilities including all testing and documentation to the owner, I

    helped hold the QC meetings for these with the other QA/QC member. I was QC in charge of HVAC, chilled

    water piping above and below ground, all duct and air handling equipment, Plumbing, Electrical,

    Infrastructure, controls, TAB, grease hood ducting and Fire Sprinkler. Full responsibility for all

    documentation of such work including code compliance, testing and coordination with other trades,

    coordination and integration of these contractors to DCK's needs and schedule, evaluation of design

    changes and scope mods as they pertain to these areas, also for all close out documentation and owner

    instructions as per our contract. Responsible for checking documentation for med gas installation and

    testing as well as reporting test results to owner.

    10/12 to 6/13Betenbow/dck St. Maarten NV JV

    A.U.C. St Maarten Senior MEP Coordinator

    DCK self-performed, by hiring local sub-contractors and laborers, all MEP, concrete and interior framing

    and finish work. There was also an extensive amount of infrastructure work like new underground

    drainage, new water lines, new small reverse osmosis water treatment plant and new septic system

    including new underground tanks and pumping station for the lower half of the campus. I was responsible

    for all installation and QC for these areas, and submittals of all trades. HVAC, chilled water piping, all

    duct and air handling equipment, Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full

    responsibility for all execution of such work including code compliance, testing and coordination, day to

    day operations of all field MEP work and coordination and integration of these operations to DCK's needs

    and schedule, evaluation of design changes and scope mods as they pertain to these areas, also for all

    close out documentation to owner and owner instructions as per our contract. Held weekly MEP meetings

    for all phases of this work.

    8/11 to 10/12dck Ttec JV MCAS Yuma MEP Engineer/ MEP Coordinator My duties included but were not limited to, review and approval of design documents, reviewing and approval of MEP contractor submittals such as HVAC equipment, ductwork, DDC controls, Chillers, boilers, etc. Also fire sprinkler piping, valves, pre-action systems as well as Dry Agent systems, plumbing pipe designs, fixtures backflow preventers and automated flush valves, also involved in low voltage and line voltage electrical equipment and large emergency generators, day to day operations of field MEP contractors and the integration of the contractors to dck Ttec needs and schedule, evaluation of CRs, design changes and scope modifications as it effects the contract costs. There was also extensive infrastructure work like pipe bursting, pump stations, new underground piping, new underground electrical piping, new sub station including slab and fence work. Had to comply with all NAVFAC safety and submittal requirements. Training: A.H.A. S.T.A.R.T Safety Health and Environmental Manual Construction Quality Management for Contractors Certified USACE OSHA 30 Hour JS-US007 Level 1 Antiterrorism Awareness Training 04/04 to 7/11 Climatic Refrigeration and A/C

    West Melbourne, Florida

    Project Manager/ Estimator

    My duties include but are not limited to, management of all phases of projects ranging from small DX systems

    to large chilled water systems including duct work, black iron and pre-insulated PVC piping and various types of

    insulation, estimating and buying out of these types of projects. Also, negotiation of change orders for both

    civilian and govt. projects and all related documentation involved in these. Manpower loading for both small

  • and large projects and matching people with their skill set as needed to facilitate the needs for a given project.

    Projects managed and estimated include NASA, US Air Force, state, county and large retail malls and shopping

    plazas. Also, was PM on two hospital jobs, the Palm Bay and Cape Canaveral hospitals, also 3 surgery centers,

    including all HVAC, C/W and H/W piping, DDC controls and all stainless steel med gas. piping and butt fusion

    welds. Responsible for all UL assemblies related to HVAC.

    09/98 to 04/04 City of Cocoa Beach Golf Course Cocoa

    Beach, Florida

    Assistant Golf Pro

    Greeting guests, managing the pro shop, teaching and staff management. Took

    time to play tournament golf to attempt to get my Senior PGA Tour card.

    04/96 to 06/98 Britt's A/C and Fire Sprinkler

    Titusville, Florida Project Manager/Estimator Managed and estimated commercial projects mainly for NASA and USAF for work at Cape Canaveral AFS and KSC. Responsibilities included but not limited to scheduling, manpower estimations, RFP documentation for several disciplines of mechanical contracting. ie. duct work, chilled water piping, fire sprinkler piping, plumbing piping as well as controls and subcontractors. 04/93 to 03/96 Coastal Mechanical Co. Inc. West Melbourne, Florida Sheet metal shop and Special Projects Manager/Estimator Initially held position as sheet metal shop manager. Responsibilities included but were not limited to, supplies & inventory, shipping/receiving, input of duct and fittings into Vulcan system along with scheduling deliveries to job sites and material procurement for those jobs. Assumed the additional position of Special Projects Div. Manager and estimated and ran smaller projects. Responsible for all aspects of these projects and design and layout throughout the project as well as warranty. 1978 THROUGH 1993 ESTIMATING EXPERIENCE UPON REQUEST EDUCATION

    Dekalb Community College Decatur, Georgia West

    Georgia College Carrollton, Georgia

    Carrier Engineering School Atlanta, Georgia

    Trane Engineering School Orlando Fl.

    U S A C E Q A / Q C C e r t i f i e d L . A . 2 0 1 2