Automated MES and DCS Excursion Management Collection System for Real-
Time Excursion Resolution Stephen Britton
New England Controls Senior Business Intelligence Engineer
Booth 3453
• Excursions become the dreaded “D” word
• Lot release delays
• Investigations are costly
• Proceeding at risk – No knowledge of immediate impact
What is the impact of an Excursion?
Current Excursion Detection Practices
Details from systems are read and written – Might have more details than needed – Might be missing the important details
Current Resolution Practices
Supervisor Manufacturing Review Hours or Days later
Quality Review
Days or Weeks Later
Review by Exception
Real-Time Collection and Resolution • Electronic collection of Excursion at the time
of the occurrence
• Quality is represented on floor to witness
• Manufacturing and Quality to Review and Resolve the Excursion at soonest convenience – Initial Impact Assessment – Correct Classification
Excursion Management Architecture
MES Database
DCS DatabaseExcursion Management Web Server
Client Machine
Read and Update Excursions
Process Violation
DCS Alarm Triggered
Excursion Resolution Process Severity / Criticality
– Manufacturing Assigned – QA Assigned
Severity Initial Manu MS QA
0 X X O X
1 X X O N/A
2 X X X N/A
3 X X O X
Owner Severity
Unknown 0
Manu 1
MS 2
QA 3
Initial review
– Operator Context
Manufacturing Review • Performed by Supervisor or Senior
Associate
• Real-Time equivalent to post batch Manufacturing Review
Types of Automated Excursions EBR Excursions
– Process Based – Free form
DCS Automation Excursions – Alarms – Process Based
Excursions from MES
• Process Violation – Proceeding with Risk – Known Severity
• Workflow violation
• Free form comments
MATERIAL_SCAN:1
Is scanned Container Valid? NO
FAIL_MESSAGE:1
Proceed at Risk?
YES
YES
START
END
Scanned material barcode Lot Code does not match expected Lot.
EBR Excursion Collection
Collect All Details – Batch / Order – Operator Comment – Step / Operational Context – Text from Step – Severity
Excursions from Automation
• Excursion Monitoring Module
• Process Violation
• Recipe Changes – Manual Parameter Changes – Step Changes
And….
Excursions from Automation: Alarms
Relevant Alarms only – Activated when Unit is in use
Acronym Process Impact Deviation?
N-KCP Unlikely No
KCP Probably Yes
CCP Yes Yes
Non-Key Controlled Parameter Key Controlled Parameter
Critical Controlled Parameter
Automated Excursion Creation 1) Interface periodic check for new items
2) New Excursions sent to message processing queue
3) Interface Code Processes Queued Messages
4) Requests sent to Web API
Benefits of Excursion Management
• Quicker Lot Release
• Quality Information at time of Deviation
• Real-Time Release by Exception