39
Turnkey Compressed Natural Gas Station Construction Your Speaker: Jeff Ricketts Director of Construction Clean Energy Your Host: David Orton Senior Vice President, Global Business Development & Marketing IMW Industries

Turnkey CNG Station Construction

Embed Size (px)

Citation preview

Page 1: Turnkey CNG Station Construction

Turnkey Compressed Natural Gas Station Construction

Your Speaker:

Jeff Ricketts

Director of Construction

Clean Energy

Your Host:

David Orton

Senior Vice President, Global Business Development & Marketing

IMW Industries

Page 2: Turnkey CNG Station Construction

About IMW

IMW has been manufacturing industrial machinery since 1912, and has evolved to be a leading manufacturer of natural gas compression systems, serving all major markets Globally. Equipment is currently operating mid-east to North of the Arctic Circle.

• Quality Products & Leader in CNG Compression• Non-Lubricated Compression for Clean CNG

A variety of configurations for all applications

Page 3: Turnkey CNG Station Construction

A Clean Energy Company

IMW operates as a wholly owned subsidiary of Clean Energy Fuels Corp. (NASDAQ: CLNE). Clean Energy is the largest provider of natural gas fuel for transportation in North America and a global leader in the expanding natural gas vehicle market.

Clean Energy has operations in CNG and LNG vehicle fueling, construction and operation of CNG and LNG fueling stations, biomethane production, and compressor technology.

Page 4: Turnkey CNG Station Construction

Your Speaker

Jeff Ricketts

Director of Construction

Clean Energy

Page 5: Turnkey CNG Station Construction

TURNKEY COMPRESSED NATURAL GAS STATION

CONSTRUCTION

Page 6: Turnkey CNG Station Construction

6

How Does This…

Page 7: Turnkey CNG Station Construction

7

Become This?

Page 8: Turnkey CNG Station Construction

8

Page 9: Turnkey CNG Station Construction

9

Page 10: Turnkey CNG Station Construction

10

Page 12: Turnkey CNG Station Construction

12

Time Fill Line

Page 13: Turnkey CNG Station Construction

13

Natural Gas Supply

Page 14: Turnkey CNG Station Construction

14

Site Layout Plans

Page 15: Turnkey CNG Station Construction

15

Station Sizing

Page 16: Turnkey CNG Station Construction

16

Budget & Station Sizing

• COST CONSIDERATIONS

• Equipment Costs• Installation Costs

• Operational Expenses

Page 17: Turnkey CNG Station Construction

17

Equipment Considerations

Page 18: Turnkey CNG Station Construction

18

Examples of Codes

Page 19: Turnkey CNG Station Construction

19

Clearing The Site

Page 20: Turnkey CNG Station Construction

20

Compressor Compound

Page 21: Turnkey CNG Station Construction

21

Gas Main Trench

Page 22: Turnkey CNG Station Construction

22

Electrical Rough-In

PLACING ALL OF THE ELECTRICAL, CONTROL, AND COMMUNICATION WIRING CORRECTLY

Page 23: Turnkey CNG Station Construction

23

Underground Gas Piping

Page 24: Turnkey CNG Station Construction

24

Gas Lines Trench

• THE WHITE SAND IN THE FOREGROUND (SHADE SAND) ALERTS ANYONE DIGGING

Page 25: Turnkey CNG Station Construction

25

Canopy Columns & Fuel

Page 26: Turnkey CNG Station Construction

26

Erecting The Canopy

Page 27: Turnkey CNG Station Construction

27

Canopy & Steel Fascia

Page 28: Turnkey CNG Station Construction

28

Setting Equipment

MANY ASPECTS OF THE CONSTRUCTION PROCESS OCCUR AT THE SAME TIME

Page 29: Turnkey CNG Station Construction

29

Equipment Compound

Page 30: Turnkey CNG Station Construction

30

Priority Panel & Storage

Page 31: Turnkey CNG Station Construction

31

Priority Panel Interior

Page 32: Turnkey CNG Station Construction

32

Main Power Rough-In

Page 33: Turnkey CNG Station Construction

33

Electric Switch Gear & MCC

Page 34: Turnkey CNG Station Construction

34

Backfill & Grading

Page 35: Turnkey CNG Station Construction

35

Road & Entrance Way

Page 36: Turnkey CNG Station Construction

36

Completed Facility

Page 37: Turnkey CNG Station Construction

37

Station Readiness Checklist

THE COMPLETED SITE WILL REQUIRE A CHECK OF ALL THE EQUIPMENT AND CORRECT INSTALLATION

Page 38: Turnkey CNG Station Construction

Thank You.

www.cleaneenergyfuels.com

Page 39: Turnkey CNG Station Construction

Contact Us!

IMW Industries

43676 Progress Way

Chilliwack, BC,

Canada V2R 0C3

+1 604-795-9491

www.imw.ca

Questions?

[email protected]

[email protected]