13
A Power Point Presentation on Vocational Training AT DEPARTMENT OF MECHANICAL POORNIMA COLLEGE OF ENGINEERING ISI-6, RIICO INSTITUTIONAL AREA , SITAPURA, JAIPUR Submitted By: Bhupesh Jangid (PCE2/ME/13/059) Submitted To: Mr. Yogesh Mishra “Carriage Workshop (NWR), Ajmer”

Railwaycarriage ajmer

Embed Size (px)

Citation preview

Page 1: Railwaycarriage ajmer

A Power Point Presentation on

Vocational Training AT

DEPARTMENT OF MECHANICAL POORNIMA COLLEGE OF ENGINEERING

ISI-6, RIICO INSTITUTIONAL AREA , SITAPURA, JAIPUR

Submitted By:Bhupesh Jangid(PCE2/ME/13/059)

Submitted To:Mr. Yogesh Mishra

“Carriage Workshop (NWR), Ajmer”

Page 2: Railwaycarriage ajmer

INDIAN RAILWAY HISTORY

It is one of the world's largest railway networks comprising 115,000 km (71,000 mi) of track over a route of 65,808 km (41,826 mi) and 7,112 stations.

The country's first railway, built by the Great Indian Peninsula Railway (GIPR), opened in 1853, between Bombay and Thane.

The core of the pressure for building Railways In India came from London. In 1848, there was not a single kilometer of railway line in India.

Page 3: Railwaycarriage ajmer

Carriage Workshop NWR ,Ajmer• It is founded in 1884 by the

Central Railway Workshop (1876).

• Repairing and Manufacturing of Steam engines and Carriages of Rajputana-Malwa Railway.

• After 2000 It works on IOH and POH of Carriages.

• Also POH of Heritage on Wheels and POW,RROW.

• IMS Certified. QMS-9001:2008 EMS-14001:2004 OHSAS18001:2007

Page 4: Railwaycarriage ajmer

BTC (Basic Training Center)

Bogie

Braking System

Machine Shop Coach

Page 5: Railwaycarriage ajmer

BOGIEFor IOH of Bogie Dismantle of Bogie BMBC

POH (periodic overhauling):- For ICF coaches every 18 Months.IOH (Intermediate Overhauling):-For ICF Bogies Every 9 Months.Each part sent to Repair or Change after Dismantle of Bogie.Shot Blasting is done on Springs and other Dismantles.Manufacturer:-ICF Chennai ,RCF Kapurthala

Final Outgoing

Weight:-6tonne

Page 6: Railwaycarriage ajmer

Braking System (Twin Line Braking System)

Compressor(loco)10 kg/cm2

Feed Pipe(6kg/cm2)

Dia. 25 mm

Auxiliary Reservoir300 litter Cylinder

Distributor Valve

To BMBC(bogie Mounted brake cylinder)

Brake Pipe(5kg/cm2)

Control Reservoir

Page 7: Railwaycarriage ajmer

Spring SectionAfter dismantle Shot Blasting Machine Magno flux Machine

DEFECTS

Page 8: Railwaycarriage ajmer

BEARING SECTION

Double Roller Self Aligned Bearing.Venders:- NBC,SKF BearingsNo.of Rollers:-30Per Bearing Grease:-1.75kg NBC bearing

Dismantled Bearings

Hydrojet Cleaning

Inspection and Testing

HeatingAssembly

Page 9: Railwaycarriage ajmer

Machine Shop(Wheel and Axle)Wheel Turning Machine Wheel Pressing Machine Axle Turning Machine

Final OutgoingUltrasonic Testing of Axle

Nominal Dia. of wheel:-915mm, If Dia.<837mm then rejectedPressing Load for wheel pressing:-85 to 110 tonneAxle Journal Dia. :- AC-152mm,Non-AC-145.Material:-Forged Cast Steel

Page 10: Railwaycarriage ajmer

COACHRoof sheet and trough floor: –Austenitic (304)Other members:- Ferritic (409M)Under-frame –Corten steel

Buffer and Bio Toilet

Coach Shell Coupling of Coach

Page 11: Railwaycarriage ajmer

AIR CONDITIONING SYSTEMRMPU(Roof Mounted Package Unit)Under Slung Type

CopeLand Scroll Type CompressorPer Unit Capacity:-7 TonnePer Coach Unit :-2Refrigerant:R22,R134A,Recently R407CAir Circulation :-75% Inside,25% outsideCurrent supply:-440v ,7.5 amp.Refrigerant Quantity:2.75kg

V-Type Twin Cylinder CompressorUnder slung Items:- Compressor , Condensor ,Control PanelUsed before 1996Pipe Length:-25 m

Page 12: Railwaycarriage ajmer

PAINT SHOPPU Paint Process:-

Prepared Shell Putty Operation Putty Rub Down

Masking Painting Shop Drying Oven

Epoxy- Epoxy- Polyurethane system:-Paint life:-2 POHMore durable.More Gloss & Colour retention. More resistance to salty atmosphere.More resistance to ultra-violet rays.

Page 13: Railwaycarriage ajmer

Thank You……..Any Queries…….