25
PREPAID ENERGYMETER- ELECTRICITY BILLING BY M. SAMATHA( 12D21A0231 ) EEE IV YEAR SRIDEVI WOMEN’S ENGINEERING COLLEGE 1

prepaid energymeter

Embed Size (px)

Citation preview

PREPAID ENERGYMETER-ELECTRICITY BILLING

PREPAID ENERGYMETER-ELECTRICITY BILLINGBYM. SAMATHA( 12D21A0231 )EEE IV YEARSRIDEVI WOMENS ENGINEERING COLLEGE1

1

TOPICS:Electricity BillingTraditional Energy meterBacklogs in traditional systemNew improvements made by prepaid systemPrepaid energy meter systemWorking of a prepaid energy meterDo there exist any problems.?Conclusion

2

2

ELECTRICITY BILLINGCost incurred for the consumption of power.3

4Electricity billing

It is the billing of a electricity according to energy consumed.It is measured in units using a energy meter which may be a conventional type or a radical one. Generally in India we follow 3 Part Tariff system,

Total charges=fixed cost +semi fixed cost + variable cost =(a + b*KW +c*KWh )ais a constant charge made each billing period.bis the unit charge in Rs per kW of metered maximum demand in KW during billing periodc is the unit charge for energy in Rs per kWh of energy consumed

TRADITIONAL ENERGYMETERElectromechanical meterconsists of an aluminum disc positioned between two electromagnets, one of whose coil is connected to the load and is the current coil and the coil of another electromagnet is connected to the supply voltage. The interaction of the fluxes between the two coils is responsible for providing a torque to the disc, which starts rotating, with the revolutions proportional to the load current. The counter records the number of revolutions and displays them, which indicates the energy consumed.

5

Electronic metersconsists of current and voltage sensors which sense the amount of current and voltage consumed and this analog signal is sampled and digitized using ADCs. The digital signals are then processed using a DSP or a Microcontroller, which then displays the amount of energy consumed on a LCD or a LED display.

Even though after replacement of digital meters has not changed the system.A person from the electricity department go to one and every house and reads the wattage consumed and gives a printed slip of electricity bill.

It is not even get eneded here, for the payment consumer has to stand in a line at the municipal offices for hours.6

BACKLOGS IN TRADITIONAL SYSTEMTime consuming process.Errors introduced at every stage are fond of errors with electro-mechanical meters, human errors while noting down the meter reading, and errors while processing the paid bills and the due bills. No control of usage from the consumers side.It is a headache for the government to collect debts due electricity usage from every customer. Problem of power thefts leading to unbalanced billing causes loss of economy. Even people feel it burden to stand in a queue every month for the payment of bill.

7

NEW IMPROVEMENTS MADE BY PREPAID SYSTEMPay before useKeep customers on supplyRecover money owed (debt)No need to chase paymentsNo further actions such as disconnectionsLoad and demand side managementShow true cost of consumption and money leftReduce waste conserve energyNo billing errorsReduces deployment of manpower for taking meter readings.Cost efficient and can reduce problems associated with billing like No bill production, No bill distribution.

8

PREPAID ENERGYMETER SYSTEMBasically like in a mobile phone recharging, the consumer buys a recharge card and gets some energy units in return of the balance amount. The balance amount will keep reducing for every unit of energy consumed and once zero, the power supply would be automatically cut off. The amount deducted for every unit of energy consumed can be controlled by the distribution unit according to the peak hours.

Uses energy meters which get recharged using a card or a key or a code bought from the vendor.9

Two types:Using a token code to rechargeUsing a card reads a barcode to recharge10

11

WORKING OF a PREPAID ENERGYMETERUser pays for the P unit of electricity and go for consumptionAs the consumption increases, units left for usage decreases that follows the money.When the units left reach to a particular threshold value, the meter gives a warning message to the consumer to get recharge soon.If it exceeds the limit and the balance money reach zero, the relay circuit triggers and the power cut at the user.It sends a message to recharge the electricity balance.12

WORKING OF A PREPAID ENERGYMETER

MICRO CONTROLLER (AT89S52) GSM16X2 LCD DISPLAYRELAYENERGY METER LOAD

AC TO DC CONVERTER 5V230/9T/F1-PH 230V

13

COMPONENTS:Microcontroller AT89S52/5116x2 LCD displayGSM MODEMRelayLED RESET switch

14

MICROCONTROLLER

In this system AT89S52/51 microcontroller is used.256 bytes of internal memory.4.0v to 5.5v operating range.32 programmable I/O lines.AT89S52 is a low-power, high performance 8-bit microcontroller.Controller receives the commands from GSM modem and activates relays as per the command. And send the feedback SMS to operator through GSM modem.Controller connects the load to the main supply by operating relays contacts.

RAM

ROM

I/O Port

TimerSerial COM PortMicrocontroller

CPU

A single chip

15

Liquid Cristal DisplayInterface with either 4-bit or 8-bit microprocessor.16x2 displayWhich displays the amount of power consumed

16

GSM MODEM

GSM means Global system for Mobile communication. GSM transfer the instruction to main circuit from operator and vice versa. The frequency range specified for GSM is 1,850 to 1,990 MHz A GSM modem is a specialized type of modem which accepts a SIM card, and operates over a subscription to a mobile operator, just like a mobile phone.When a GSM modem is connected to a computer, this allows the computer to use the GSM modem to communicate over the mobile network.

17

RELAYSRelay is an electrical switch that opens and closes under the control of another electrical circuit.The phase of main supply is connected to relays.OFF condition relay contacts are in open, under ON condition contacts are in closed position.Means it connects the phase to the load in ON state only . Input supply required to operate relay is 8-12v .The output phase connected to relay range is 7 amp 250v.It gives the sound while contacts are closing and opening.

18

AUXILARY COMPONENTS Led lights are used to know the circuit status ,means power in the circuit is present or not. Reset switch is used for restart the controller tasks from the beginning when ever it is struck. Crystal oscillator is used to generate the proper voltage to relays in controller.(means generating clock pulses).

19

DO THERE EXIST ANY PROBLEMS ?Above average costs for your electricity;The best energy deals on the market aren't available to prepayment meter customers;They can be inconvenient because you have to go out to 'top up' keys and smartcards;If you can't reach a shop to top up your meter your energy can be switched off;Older meters need to have their prices updated manually after price rises or falls, which can take months. This means you could be left paying old rates and owing a lump sum or paying too much.

20

ADVANTAGES :Advantages of prepayment meters include:

Helping customers to manage their debt and energy usagePreventing large, unexpected bills.Power consumptionReduction in power theftsEconomical method to the government to collect bill payment as it is a prepaid type( i.e. reduces the financial risks)Better customer service.Improve operational efficiencies

21

22

CONCLUSION

We can reduce the manual efforts to collect the readings from the energy meter which is a cost effective solution.It is user friendly process where prepaid payment pay before use works just as a mobile recharge we do daily, can make use of power in an efficient way.23

ANY QUERIES???? JUST PUT FORWARD24

THANK YOU

25