INTRODUCTION

Richa customizes structural steel system for heavy construction and offers design,engineering and construction solution from concept to completion

Richa adopts innovative concepts in engineering and strives to go beyond the realm of conventional construction with its team of leading engineers, designers with world class manufacturing and efficient project handling for heavy project construction.

RICHA INDUSTRIES LIMITED

Page 3: Multi Storey Steel Structures

OVERVIEW

India’s Leading Turnkey Metal Building & Steel Construction Company

Over 300 Steel Buildings executed across India for various applications.

Acknowledged for Quality, Safety and Timely Execution of Projects

Net worth in excess of Rs. 100 cr

One of the major leader in Pre-Engineered steel construction/off-shore manufacturing industry.

Some of the most prestigious industrial and commercial projects engineered and delivered. Timely delivery, Timely completion of projects & Countrywide support of project management services for your projects

Most diverse steel building solution portfolio in India.

RICHA INDUSTRIES LIMITED

Page 4: Multi Storey Steel Structures

RICHA INDUSTRIES LIMITED

A leading Construction & Engineering company operational in Pre-Engineered Building, Structural Steel, Turnkey solutions and Textile

sectors.

WIPRO

MADHU SILICA

RICHA CORPORATE

OFFICE

Page 5: Multi Storey Steel Structures

WHY RICHA INDUSTRIES ?

Started its PEB division in 2008, Richa Industries has created an exclusive niche for itself in the PEB industry with the excellent support of its well qualified and experienced team.

Richa is committed to Design, Manufacture and Install Pre-Engineered Steel Buildings, which are 100% custom built and designed in accordance with sound principle of Engineering using Computer aided designing.

We offer hi-tech solutions to our customers by utilizing MBS (Metal Building Software), Staad Pro (3D Structural analysis and design software) and Tekla (Model-based software) with highest precision to meet the structural requirements of the Pre-Engineered Steel Building Systems.

Richa deputes qualified experienced safety inspectors to ensure complete project safety and provide good after sales service to its customers.

The company has presence in more than 120 cities across India with Sales office in more than 8 cities enriched with government as well as private clients.

An ISO 9001:2008 certified company, Richa Industries is listed at Bombay Stock Exchange.

Page 6: Multi Storey Steel Structures

USPs RICHAINDUSTRIES

Richa is the only company

offering galvanized Flange brace angles,Sag rods and Gutter

Straps

Richa provides galvanized (275 GSM) Secondary members

which enhance the life of Purlins and provide

maintenance free solutions

Richa offers galvanized Anchor

bolts (36 dia)

Page 7: Multi Storey Steel Structures

MANAGEMENT TEAM

Mr. Sushil Gupta (Chairman)An IIT engineer by profession, Mr. Gupta holds a B. Tech. (Mechanical) and M. Tech. (Applied Mechanics) degree from IIT- Delhi. With an experience of more than 25 years in the industry, is a “Father Figure” of Richa Industries. Mr. Sushil Gupta serves as Chairman and Managing Director of Richa Industries Ltd. His core area of focus remains on R&D, cost effectiveness and new developments.

Dr. Sandeep Gupta (Jt.MD)Dr. Sandeep Gupta is a Doctor of Philosophy in Management. He has accomplished his MBA from University of Bhartiya Vidyapeeth, Pune. He initiated Richa’s backward integration journey from textiles into Pre Engineered Buildings and further into Turnkey Solutions and going up-stream into structural steel.

Mr. Manish Gupta (Director)Mr. Manish Gupta is the Director of the Company. Striving towards economic, environmental and social progression of the organization and the society on the whole, Mr. Manish Gupta firmly believes in the principles of respect, rigor and involvement. Mr. Gupta is the leading light in textile development and innovation insuring quality at all levels of operations.

RICHA INDUSTRIES LIMITED

Page 8: Multi Storey Steel Structures

SOLUTIONS FOR HIGH RISE APPLICATIONS

Richa Steel structure is an ideal solution for High Rise applications as today in urban Infrastructure there is a space crunch and such buildings are an appropriate solution to this problem and are cost effective too due to optimized use of steel.

Steel Buildings can be built as per architectural design for optimized energy requirement, such as Natural cooling, solar gains & natural day light

These buildings incorporate a high level of services which can be easily interfaced within our system: Air conditioning system ducts, flooring, electric power plants for essential facilities , fire protection system and all other Mechanical and electrical services easily designed in our Structural system

RICHA INDUSTRIES LIMITED

Page 9: Multi Storey Steel Structures

BENEFITS OF USINGSTEEL STRUCTURES

Beter ROI due to speedy construction of superstructure Lighter in weight due to use of High strength steel, hence lighter foundations required Internal dry wall partition system and acoustic proofing helps to keep structure lighter

along with quick erection time Provision for all MEP and other services offsite planning Large span are possible in reception, lobby, function halls, food court etc Architectural aesthetics and energy efficient views Modern amenities provision and efficient work space Customized solution to each and every need

RICHA INDUSTRIES LIMITED

Page 10: Multi Storey Steel Structures

ADVANTAGES OFRICHA STRUCTURAL

STEEL SYSTEM Steel buildings are manufactured using automated equipment in-house

Better quality control as manufacturing takes place under controlled quality system in plant

Flexibility in selection of member section or can be made from built up

Mass Production resulting in cost control and highest degree of quality

Excellent accuracy of product dimension within close tolerance as per code requirement

Just-In-Time Logical Delivery

Faster erection at site

Easy to fabricate in any shape for any application

High load bearing strength and excellent ductile properties

Cost effective

Eco-friendly

Page 11: Multi Storey Steel Structures

MULTISTOREY BUILDINGS

Cost Comparison - High Rise Buildings

Lowest Construction CostLow Rise Medium Rise High Rise

Small Grid8.6 m X 8.6 m

Concrete Concrete Steel

Mid Range Grid11 m X 11 m

Concrete Steel Steel

Long Span Grid15 X 7.5 m

Steel Steel Steel

Cost effective solution for medium rise buildings of grid size 11X11 More cost effective solutions for medium or high rise buildings of grid size

more than 11m

RICHA INDUSTRIES LIMITED

Page 12: Multi Storey Steel Structures

MULTISTOREY BUILDINGS

Cost Comparison - High Rise Buildings

Construction cost with 11m x 11m Grid Structure will be cheaper than one built in concrete Medium and Longer spans in steel will be more cost effective

RICHA INDUSTRIES LIMITED

Page 13: Multi Storey Steel Structures

MULTISTOREY BUILDINGS

Cost Comparison - High Rise Buildings

Earlier revenue generation (Warm Shell @ Rs 250 per sq ft per month calculated on built area) Reduction in financing cost (approx. at 13%) Earlier return on investment Faster speed to market (game changer and need of hour)

Key Benefits of Early Completion of ProjectPre - Construction and Construction Periods

Concrete Framed Building Months

Steel Framed Building Months

Total Months 32 22

Earlier Revenue GenerationBuilt Area – Sq Ft. Rent

INR/ SqFt / Month

Steel Framed Building Months

Earlier RevenueINR Cr.

533,998 250 6 133

RICHA INDUSTRIES LIMITED

Page 14: Multi Storey Steel Structures

PROCESS OF MANUFACTURINGSTEEL STRUCTURES

RICHA INDUSTRIES LIMITED

Page 15: Multi Storey Steel Structures

FABRICATION

Structural steel members are fabricated by precisely cutting, sharing, punching, drilling, fitting and welding in order to produce the configurations detailed in the shop drawings. Each member is labeled with a piece mark, length, and job number for identification.

Page 16: Multi Storey Steel Structures

LABELLING

Once fabricated, each finished structural steel member is labeled. In this case the fabricator labels each steel member with its piece mark, sequence number, and the last two digits of the job number. Richa uses specific labeling practices. In the image, the label color is yellow to differentiate it from previous labels. Labeling of the steel pieces is crucial because it helps identify members on the job site.

RICHA INDUSTRIES LIMITED

Page 17: Multi Storey Steel Structures

STORAGE

After fabrication, finished structural steel members are stored in the storage yard. The yard is properly organized and it makes easier to transport steel to the site in phased manner. Steel structures are stored according to erection sequence. Sequences define areas of the frame and are used to organize their delivery and erection. The practice of planning and storing by sequence improves the efficiency of loading, delivery, offloading and erection.

RICHA INDUSTRIES LIMITED

Page 18: Multi Storey Steel Structures

ANCHOR BOLT PLAN

One of the first drawings prepared by the detailer is the Anchor Bolt Plan. This plan guides the foundation subcontractor in the placement of anchor bolts. It contains horizontal and vertical information for placement of anchor rods, as well as dimensions and elevations of leveling plates (if used).d).

RICHA INDUSTRIES LIMITED

Page 19: Multi Storey Steel Structures

ANCHOR BOLT SURVEY

Before the erection process started, anchor bolts and leveling plates are surveyed to check if they are correctly positioned. If anchor rods are improperly located, they are corrected by the foundation subcontractor before the erection process may start. The surveyor uses a total station to determine the horizontal and vertical location of each leveling plate and anchor bolts.

RICHA INDUSTRIES LIMITED

Page 20: Multi Storey Steel Structures

tekla crane.mp4

ERECTION PROCESS

An animation of the steel structure erection process sequence wise

RICHA INDUSTRIES LIMITED

Page 21: Multi Storey Steel Structures

ERECTION TEAMThe Erection Team consists of One Project Manager, One Foreman, 3-4 Iron workers for hooking steel, three to four iron workers connecting steel and a crane operator.

RICHA INDUSTRIES LIMITED

Page 22: Multi Storey Steel Structures

CRANES

Cranes are selected on the basis of cost, availability, speed, reach and capacity. There are many configurations and sizes of cranes available.

CRAWLER CRANE

TYER MOUNTED CRANE

TOWER CRANE

RICHA INDUSTRIES LIMITED

Page 23: Multi Storey Steel Structures

UNLOADING & SHAKEOUT

Upon delivery to the job site, fabricated steel unloads and places on wood or steel blocking. The blocking allows for chokers to be attached to each member for subsequent hoisting and erection. Shakeout of structural steel takes place after unloading. Shakeout is the process of sorting the steel pieces on the site so that they can be efficiently erected, and involves organizing and spacing each structural steel piece.

RICHA INDUSTRIES LIMITED

Page 24: Multi Storey Steel Structures

ERECTION DRAWING

This is the erection drawing of floor framing for a project. The numbers one and two inside the red hexagons on each side of the red line indicates the sequence number for each part of the structure. The piece marks on the drawing matches those on the beams, girders and columns and are used to locate and orient each member during erection.

RICHA INDUSTRIES LIMITED

Page 25: Multi Storey Steel Structures

ERECTIONSEQUENCE

1. ERECT COLUMN

2. INSTALL BEAMS AND GIRDERS

3. PLUMB STRUCTURES

4. COMPLETE ALL CONNECTIONS (TIGHTEN) INCLUDING BRACING

5. GROUT COLUMN BASE PLATES

RICHA INDUSTRIES LIMITED

Page 26: Multi Storey Steel Structures

FIRST COLUMN

This is the first column being hoisted into position. Using ladders, iron workers temporarily bolted the column. Prior to erection, the erector must consider column stability in accordance with safety standards and the AISC Code of Standard Practice.

RICHA INDUSTRIES LIMITED

Page 27: Multi Storey Steel Structures

SEQUENCE COLUMN

RICHA INDUSTRIES LIMITED

Page 28: Multi Storey Steel Structures

BEAMS

Main girders are hoisted after the columns. Beams are then hoisted and connected to the girders.

RICHA INDUSTRIES LIMITED

Page 29: Multi Storey Steel Structures

PRILIMINARY BOLTING

The connector uses pins to align the holes between structural steel members being connected. Then several bolts are placed and temporarily tightened with spud wrench. At least two bolts per connection are used to temporarily fasten each connection.

RICHA INDUSTRIES LIMITED

Page 30: Multi Storey Steel Structures

HAND SIGNALS

Teamwork and communication are important when erecting steel. Iron workers use hand signals to communicate with the crane operator.

RICHA INDUSTRIES LIMITED

Page 31: Multi Storey Steel Structures

PLUMBING

Turnbuckles are a common part of the bracing system. A turnbuckle is a device that usually consists of a link with screw threads at both ends that is turned to bring the ends closer together. Using several turnbuckles connected to the temporary bracing, the steel frame is shifted until it is vertically aligned.

RICHA INDUSTRIES LIMITED

Page 32: Multi Storey Steel Structures

METAL DECKING

This is a view (right 1st image) of the welding used to fasten metal deck to the structure.

RICHA INDUSTRIES LIMITED

Page 33: Multi Storey Steel Structures

PERIMETER SAFETY CABLES

On multi-storey structures, perimeter safety cables are installed at the interior and exterior perimeters of floors and openings as soon as the metal decking has been installed.

RICHA INDUSTRIES LIMITED

Page 34: Multi Storey Steel Structures

SHEAR STUDS

This is a view of the welded studs. Shear studs are tested to ensure that they are correctly welded to the structural steel members in compliance with the bend test of the AWS D 1.1 Structural Welding Code.

RICHA INDUSTRIES LIMITED

Page 35: Multi Storey Steel Structures

TEMPORARY BRACING

Temporary bracing is used to provide temporary lateral stability to the structure and to plumb up the frame. The temporary bracing is removed once the structural steel frame is secured.

RICHA INDUSTRIES LIMITED

Page 36: Multi Storey Steel Structures

FINAL BOLT UP

After a section of the structural frame is assembled and vertically aligned, iron worker permanently fastens the structural steel members with additional bolts. Tension controlled black bolts of SS 8.8 grade are widely used. Final bolt-up is performed using a torque wrench. The wrench stops automatically when the bolt shears at a tension control groove indicating that the required tension is reached.

RICHA INDUSTRIES LIMITED

Page 37: Multi Storey Steel Structures

SLABS

Floor slabs are poured after the structural steel frame is secured to the vertical masonry shafts. After reinforcing steel and concrete is placed, the slab is leveled and finished.

RICHA INDUSTRIES LIMITED

Page 38: Multi Storey Steel Structures

DETAILS OF BRICK WALL FACADE

RICHA INDUSTRIES LIMITED

Page 39: Multi Storey Steel Structures

LANDMARK MULTISTOREY PROJECTSBY

RICHA INDUSTRIES LIMITED

RICHA INDUSTRIES LIMITED

Page 40: Multi Storey Steel Structures

MULTISTOREY PROJECTS

RICHA CORPORATE OFFICE

Richa Corporate Office Multistorey Steel Structure building in FaridabadClear Height: Approx. 29.5 Meters

Total Area: Covered area is approx. 642 sqm & Super build-up area is approx 1800 sqm.

Ground + 6 Mezzanine floors

Multistorey Steel Structural building executed by Richa Industries Limited

Speedy construction with in two months

Page 41: Multi Storey Steel Structures

MULTISTOREY PROJECTS

MADHU SILICA Manufacturer of one of the tallest Multistorey Steel Structure building

in Gujarat and IndiaClear Height: Approx. 36 Meters

Total Area: Approx. 19000 Sq. mt.

Load: 150 MT each floor

Ground + 6 floors

Speedy Constrution in less than 10 months

Type: Silica Processing Plant

Page 42: Multi Storey Steel Structures

MULTISTOREY PROJECTS

WIPRO

Clear Height: Approx. Hig bay - 47 Meters; Low bay - 34 Meters

Total Area: Approx. 2605 Sq. mt.

Live Load: Maximum 10 KN

Machine with maximum load: 97 MT each floor

Ground +7 floors

Type: Wipro Fatty Acid Manufacturing Plant

Manufacturer of India's tallest Multistorey Steel Structure building in Haridwar till date

Page 43: Multi Storey Steel Structures

MULTISTOREY PROJECTS

WIPRO

Clear Height: Approx. 14.2 Meters

Total Area: Approx. 1956 Sq. mt.

Live Load: Approx. 100 Kg/m2 (first 3 floors); 500 Kg/m2 (4th Floor)

Ground + 4 floors, Mezzanine

Type: Manufacturing Unit Utility Building,

Wipro Multistorey Steel Structure building in Haridwar

Page 44: Multi Storey Steel Structures

MULTISTOREY BUILDING ENGINEERING

DETAILSCOLUMNS & BEAM CONNECTIONS COLUMNS & BEAM BRACING

TYPICAL STAIRCASE DETAILS

Page 45: Multi Storey Steel Structures

MULTISTOREY BUILDING

WITH FACADE Methods of Fire Protection – Gypsum Boards

Page 46: Multi Storey Steel Structures

MULTISTOREY BUILDING

WITH FACADE Methods of Fire Protection – Vermiculite Cementitious Spray

Page 47: Multi Storey Steel Structures

Methods Fire Protection – Intumecent Paints

MULTISTOREY BUILDING

WITH FACADE

Page 48: Multi Storey Steel Structures

Services through Beams

MULTISTOREY BUILDING

WITH FACADE

Page 49: Multi Storey Steel Structures

MULTISTOREY BUILDING

WITH FACADE Erection Methodology – High Rise Buildings

Page 50: Multi Storey Steel Structures

AWARDS & RECOGNITION

Richa Industries is the first Indian PEB Public Listed company to receive the internationally recognized OHSAS 18001:2007 Certification by IRQS

Richa Industries has received Second Runner up award in the "Emerging India Awards" at London in 2008 organized by ICICI Bank & CNBC TV 18

Certificate of achievement "Innovation in Structural Engineering" presented to Richa Industries in recognition of the achievement as a Nominee in the 2013 BE INSPIRED AWARDS by Bentley

The Second Annual Inc. India 500 awards presented to Richa Industries in recognition of exemplary growth and sustainable success

Richa Industries has been awarded as "Best Promising Pre-Engineering Steel Building Manufacturer from India" by Indian Achievers Podium in their 10th All India Excellence Award & 6th Realty award

RICHA INDUSTRIES LIMITED

Page 51: Multi Storey Steel Structures

CONTACT US

CORPORATE CUM REGISTERED OFFICE :

Plot No 29, DLF Industrial Area, PH-IIFaridabad -121003, Haryana

Ph: +91-129-4009262 Fax: +91-129-4133969Email : [email protected]

MANUFACTURING PLANT : 8th Km Stone, Ram Nagar Road ,

Distt Udham Singh Nagar, NH-121, Kashipur-244713,

Uttarakhand Ph: +91-9547-223073

Email : [email protected]

For all latest updates, follow us on http://www.richa.in

http://richaindustries.wordpress.com/https://www.facebook.com/richaindustries

https://www.linkedin.com/company/richa-industries-ltd

Thank you for your valuable time !

RICHA INDUSTRIES LIMITED