24
Page 1 of 24 POST APPLIED FOR - Any Mechanical / Oil & Gas/ Energy/ Power /Operations and maintenance, WWTP project or industry Mechanical Engineer/Supervisor QA/QC Engineer/Supervisor NDT supervisor Operations and maintenance, Piping Fabrication, Construction, waste water plane, steel structure, Mechanical , Piping Materials or Plumbing Superintendant , supervisor or Engineer CERTIFICATIONS Saudi ARAMCO SAP no: 70008511 As Piping QA/QC Inspector Saudi vitrified clay pipe company LTD Training conducted by Quality control department (EN ISO 9001:2000) ASNT Level II – Radiographic Test(RT) ASNT Level II – Magnetic Particle Test(MPT) ASNT Level II – Dye Penetrant Test(DPT) OPITO Approved Basic offshore Induction and Emergency Training (BOSIET) Conducted by YKK in Atyrau Kazakhstan. EDUCATIONAL QUALIFICATIONS Diploma in Mechanical Engineering BTEB, Bangladesh KEY SKILL KEY SKILLS: Piping & Welding Inspection, Punch list and Hydro-Test coordinator , maintenance engineer, mechanical engineer, steel structural engineer, Radiographic Interpretation KAZI NAZMUL HAQUE Isolux Corsan Bangladesh Ltd. QA/QC Mechanical Engineer E-mail:[email protected] MOBILE: 008801913257553, 008801844000797 (COMP. MOBILE)

Kazi nazmul cv with all attachments

Embed Size (px)

Citation preview

Page 1: Kazi nazmul cv with all attachments

Page 1 of 24

POST APPLIED FOR -

Any Mechanical / Oil & Gas/ Energy/ Power /Operations and maintenance,

WWTP project or industry

Mechanical Engineer/Supervisor

QA/QC Engineer/Supervisor

NDT supervisor

Operations and maintenance, Piping Fabrication, Construction,

waste water plane, steel structure, Mechanical , Piping Materials or

Plumbing Superintendant , supervisor or Engineer

CERTIFICATIONS

Saudi ARAMCO SAP no: 70008511 As Piping QA/QC Inspector Saudi vitrified clay

pipe company LTD Training conducted by Quality control department (EN ISO 9001:2000)

ASNT Level II – Radiographic Test(RT)

ASNT Level II – Magnetic Particle Test(MPT)

ASNT Level II – Dye Penetrant Test(DPT)

OPITO Approved Basic offshore Induction and Emergency Training (BOSIET) Conducted by YKK in Atyrau Kazakhstan.

EDUCATIONAL QUALIFICATIONS

Diploma in Mechanical Engineering BTEB, Bangladesh

KEY SKILL

KEY SKILLS: Piping & Welding Inspection, Punch list and Hydro-Test coordinator ,

maintenance engineer, mechanical engineer, steel structural engineer, Radiographic Interpretation

KAZI NAZMUL HAQUE Isolux Corsan Bangladesh Ltd. QA/QC Mechanical Engineer

E-mail:[email protected]

MOBILE: 008801913257553,

008801844000797 (COMP. MOBILE)

Page 2: Kazi nazmul cv with all attachments

Page 2 of 24

Total years of Experience

15 years (oil & gas, power plant processing Industry and Levelling survey)

Overseas

Kingdom Saudi Arabic = 3.8 years

Republic of Kazakhstan = 1.9 years (offshore)

Abu Dhabi (UAE) = 1.8 years

Familiar with codes & Standards: ASME sec I, sec II, sec III, sec V, sec VIII, sec IX,

ANSI/ASME B31.1,B31.3,B31.4,B31.5,B31.8, ASTM CODE, AWS, API, Saudi Aramco and

International standards & codes for construction and Inspections.

Summary of Skills and Experience:

P&ID marking for test package preparation as per project designs Plan

Full knowledge with interpret the QCPs, ITPs, Project specifications, Materials, Oil

& Gas plants.

Implement/verify of ISO Standard Quality Management System.

Materials inspection & Review of material certificates and compliance as per project

specifications

Control and witness for the NDT.

Estimating material, construction, and labour costs, and project timescales

Involved in producing due diligence surveys

Liaising with local contractors

Load assessments of new and existing structures.

Giving PowerPoint presentations to managers and clients

Communicating with government agencies and local authorities

Evaluating, organizing & prioritizing work within the overall project schedule.

Preparing sketches, marking-up drawings and writing specifications etc

Liaising with architects, engineering technicians and IT staff.

Structural inspections/assessments and making appropriate recommendations

Page 3: Kazi nazmul cv with all attachments

Page 3 of 24

Providing expert technical advice including structural reports, crack monitoring.

Witness & review the Mechanical destructive tests.

Utility piping systems

Wastewater sewers lines

Excavation and back filling

Textile mechanic (mechanical)

Internal and external coatings

Insulation purpose, type and thickness inspection

Valves installation inspection

Biocide and Ozone treatment inspection

Checking weld joint preparation, fit up, dimensional inspection and alignment

Review and familiarize with the project specifications, codes and standards

Visual inspections as per code requirement

Monitoring welding activities as per WPS

Conducting hydro test as per the requirement of Project

Conducting pneumatic test and Leak test as per requirement of Project

Line walk with client/PMC to achieve the Mechanical Completion Certificates

System wise line checking & raising punch, close coordination with sub-contractors

to arrange the required materials & equipment’s to complete the punches.

Prepare inspection reports and documentation as per client requirements.

Close coordination with other team members to short out the piping materials &

equipment’s and to clear the mutual punches.

Making daily progress reports & submitting to the Management.

Checking daily progress with Charge-hand & analysing the work to be complete on

time.

Page 4: Kazi nazmul cv with all attachments

Page 4 of 24

EMPLOYMENT HISTORY:

01 September 2016 to until now

Employer : Isolux Corsan Bangladesh.

Designation : QA/QC Engineer Mechanical

Project : Siddhirgonj 335 MW Combined Cycle Power Plant Project

Client : Electricity Generation Company Of Bangladesh Ltd.

General Duties & Responsibilities:

Coordinate all site inspections with the site subcontractors

Ensure that all inspection reports are accurate and that all attached documents are current status

Ensure all work is correctly prepared prior to any inspection being undertaken

Review all inspection reports for compliance

Assist the site QC manager in the organization, maintenance and control of the quality system

Prepare nonconformance reports to the QA manager and assist in developing corrective actions

Assist the QC manager and construction manager in resolving any discrepancies and ambiguities

Coordinate with the customers QC inspectors for the resolution of site problems

Coordinate with the site subcontractors to ensure that communications exist and are maintained

Assist the site subcontractors in the resolution of drawing interpretation

Attend the weekly QC meetings

Review work procedures and method statements for compliance with good work practices and the customers contract specializations

The issuance of nonconformance reports in conjunction with the site QC manager

The completion of QC site instructions and coordinate their closure The review of inspection test packages during the course of construction activities

Compliance with the site's health and safety regulations

Review course and effects of welding defects and take remedial actions

Coordination with the field subcontractors and the Third Party NDT Inspection Company

Page 5: Kazi nazmul cv with all attachments

Page 5 of 24

Review of the radiographic film and all NDT reports on a daily basis

Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant, Magnetic Particle, and Ultrasonic inspections

Witnessing of welder qualifications testing and procedures qualification testing

Reviewing of the welding summery reports

Checking the hydrostatic test packages for NDT compliance prior to testing

Recording and listing of defective welds

Monitor the control and issue of welding electrodes

Actively monitor site radiation safety

Review day to day applications for x-raying of welds

Coordinate the issue of nonconformance reports through the site QC manager

Compete site quality instructions to sub-contractors when required

01 November 2015 to 31 August 2016

Employer : Technice construction Company Ltd.

Designation : QA/QC Engineer

General Duties & Responsibilities:

Implement and verify of ISO Standard Quality Management System.

Estimating material, construction, and labour costs, and project timescales

Liaising with local contractors

Load assessments of new and existing structures.

Communicating with government agencies and local authorities

Evaluating, organizing & prioritizing work within the overall project schedule.

Preparing sketches, marking-up drawings and writing specifications etc

Liaising with architects, engineering technicians and IT staff.

Page 6: Kazi nazmul cv with all attachments

Page 6 of 24

01 February 2016:

Project : Moheshkhali - Anowara Gas Transmission Pipeline Project

(30”ODx91Km) Section: B

Client : GAS TRANSMISSION COMPANY LIMITED (GTCL)

CONTRACTOR : TECHNICE CONSTRUCTION COMPANY LTD.

Project Duties & Responsibilities:

Preparing Welding Procedure Specification (WPS) For Mainline ,Tie & Repair As per API 1104, ASME Sec IX & GTCL Specification

Preparing Procedure Qualification Record (PQR) & Welder Qualification Record (WQR) base on Welding Procedure Specification (WPS )Mainline Works With Internal Clamp and Tie in External clamp

Materials ( API 5L Gr. X60 PSL 2 ) inspection & Review as per project specifications

Monitoring welding activities as per WPS

Prepare and submit daily welding report, Tie in report, weld joints Repair reports and

documentation as per client requirements.

Monitoring all NDT activities , radiographic interpretation as per API 1104 and client procedure

Communicating with client, Sub-contractor, NDT techniques (crawler and gamma

ray ir-192 ) and local authorities

Daily progress reports submitting ( sent by message or email ) to the company & client Management

05 March 2015 to 15 June 2015

Employer : TUV Rheinland Bangladesh Pvt. Ltd.

Designation : Third party Inspector Mechanical

Project : SHAHJALAL Fertilizer Project Fenchuganj, Sylhet, Bangladesh

Client : Bangladesh Chemical IndustriesCorportaion (BCIC)

Duties & Responsibilities:

Review of mill test report or certificates.

Review of drawing, calculations, PQR, WPS, and PWHT

Mechanical and technological testing of materials at the material manufacturer, mill etc.

Page 7: Kazi nazmul cv with all attachments

Page 7 of 24

In-process inspection and onsite inspection of steel structures (e.g. construction of large halls, bridges)

Quality inspection of technical components, acceptance tests, performance tests

Prepare inspection reports and documentation

Safety and Health Protection Coordinator

Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items, and initiate corrective actions to prevent recurrence of nonconformities.

Inspection certificate of acceptance or compliance with code to be issued to vendor

Close coordination with other team members to short out the piping materials & equipment’s and to clear the mutual punches

05 September 2013 to 09 may 2014

Employer : GS NEOTEK

Contractor : DAEWOO E & C

Designation : QA/QC ENGINEER

Project : RUWAIS Refinery expansion project,(Storage tanks blending system unit)

Client : TAKREER EPC-4

Duties & Responsibilities:

Test package prepared as per cline approval marking P&ID

Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project requirement

Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC Section Head with the Client (TAKREER)

Prepared the documentation to meets the requirements of the Project Quality Plan

Ensure that the documentation, Request for inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.

Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items, and initiate corrective actions to prevent recurrence of nonconformities.

Communicating with All department’s

04 August 2012 to 05 September 2013

Employer : GS NEOTEK

Contractor : G.S Engineering & construction

Page 8: Kazi nazmul cv with all attachments

Page 8 of 24

Designation : QA/QC supervisor

Project : RUWAIS Refinery expansion project, (Alkylation unit & Olefins Conversion unit) RRE 2

Client : TAKREER

Duties & Responsibilities:

P&ID marking for test package preparation as per project designs Plan.

Co-ordination the inspection, surveillance and testing requirements are done on behalf of the QC

Section Head with the Client (TAKREER)

Prepared the documentation to meets the requirements of the Project Quality Plan

Test package prepared as per cline approval marking P&ID

Review the test package, documentation ,ISO DWG,P&ID and NDT history sheet as per project

requirement

Ensure that the documentation, Notification for Inspection (N.I), Checklists, test pack and surveillance

meets the requirements of the Project Quality Plan.

16june-2010 to 05 may 2012

Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L.

Designation : QC-Inspector (piping, steel structural, NDT, test packs)

Project : Hook- up pre commissioning assistance

(AGIP KCO-ENI Offshore Project)

Client : AGIP Kazakhstan north Caspian operating company (N.V.) Atyrau, Republic of Kazakhstan

Duties & Responsibilities:

To perform all types of piping, material, fabrication and erection inspection

NDT Radiographic inspection

steel structure inspection as per Inspection Test plan (ITP)

Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.

Equipment Inspection (RFI), Checklists and ensure the ITR meet the requirements of the Project Quality

Plan.

Page 9: Kazi nazmul cv with all attachments

Page 9 of 24

Ensure all activities carried out by subordinates are performed in accordance with company

or client safety rules – men working are wearing protective clothing and using required safety

equipments

16August 2007 to 16- june-2010

Employer : CONSOLIDATED CONTRACTORS COMPANY (CCC) W.L.L. KSA

Designation : QC-Inspector Piping (Approved By Saudi Aramco)

Present Position : Test pack & hydro test coordinator

Project : Khursaniyah Gas Plant Project

Client : Saudi Aramco

Contractor : Bechtel & Technip Joint Venture

Saudi Armco SAP # 70008511

Duties & Responsibilities

To ensure the construction activities in compliance with Saudi Aramco Standards and other International Codes and standards, such as ANSI/ASME, ASTM, API, etc.

To perform all types of piping inspection as per Inspection and Test plan (ITP)

Co-ordination, inspection and test requirements are done on behalf of the QC Section Head with the Client (Saudi Aramco)

Complete relevant forms and prepare Request for Inspection (RFI), Checklists, reports on inspections and test undertaken for the conclusion in and inspection records.

Issue Non-Conformance Reports (NCR) for violations and investigate the reason of non-conforming items, and initiate corrective actions to prevent recurrence of nonconformities.

Ensure that the documentation, Request for Inspection (RFI), Checklists, test pack and surveillance meets the requirements of the Project Quality Plan.

Piping material inspection, fabrication and erection

Final punch listing, Test packs preparation for Hydro testing inspection.

Biocide and Ozone treatment inspection

Reinstatement and Bolt Torque inspection

05 May2006 31July 2007

Employer : SINHA TEXTILE GROUP, SONARGAO, NARAYANGONJ

Position : Sub Assistant Engineer

Page 10: Kazi nazmul cv with all attachments

Page 10 of 24

Department : Mechanical Department

Duties & Responsibilities:

Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine,

Soft winder Machine, Random winder machine, cranes etc.

Operation of various machines and tools in workshop with safety

26JUNE 2005 to 28th June2006

Employer : waste water Electric al (W.W.E Malaysia)

Position : Forman

Project : Wastewater sewers line Project K.S.A

Contractor : Civil Works Company

Duties & Responsibilities:

Excavation level, pipeline level check (by dumpy level)

Pipe laying and fixing as per ISO

Manhole inspection procedure as per drawing

Manhole backdrop inspection as per drawing

Presser testing pipelines (water and air) as per standard (SVCP Procedure).

Equipment side safety and environment procedure

20thNovember 2001 to 1th September2003

Employer : Maintenance Assistant

Position : Colour Muster Yrn Dyeing Ltd.

Duties & Responsibilities:

Inspection of all Pipelines and fabrication

Maintenance of dyeing Machine, Hydro Extractor Machine, R.F Dryer Machine, Press Machine, Soft

winder Machine, Random winder machine, cranes etc.

Utility pipelines

Materials inspection

Page 11: Kazi nazmul cv with all attachments

Page 11 of 24

Other Performances:

Strength

People orientation

Dynamic

Leadership and Organizing ability

Able to work under pressure

Language proficiency

English – Reading, Writing and Speaking

Bengali – Mother Tongue

Hindi – Speaking

Arabic – speaking

Training

Organization : Bangladesh industrial technical assistant centre

Professional training : fittings work welding process (GTAW, SMAW, TIG, and MIG) and visual inspection.

Duration : 11th February, 2001 to 04th April, 2001

Organization : Saudi vitrified clay pipe com. Ltd...

Professional training : clay pipe handling process,

Hydro testing procedures

Piping inspection procedures

Pipe laying and fixing procedures

Personal details:

Name : KAZI NAZMUL HAQUE

Father s name : Kazi abdul khaleque

Mother s name : Mrs. Feroza Begum

Date of Birth : 26th April 1979 (Original)

Page 12: Kazi nazmul cv with all attachments

Page 12 of 24

9th November 1981 (as per certificate)

Nationality : Bangladeshi (By birth)

Religion : Islam

Marital status : Married

Height : 171 cm

Computer Knowledge: Operating System-Windows 98, 2000, XP & Vista etc.

Applications are MS Office, Internet, and E-mail etc.

Present address : Name : kazi nazmul haque

c/o : Kazi abdul khaleque

Village : Alakher char

Post office : Durgapur

Police station: kotwali

District : Comilla, Bangladesh

Confidence: As a QC supervisor with engineering background and with experience in various projects, I am highly

eager to have an opportunity to work with some world leading organizations. In that case, my career will be step

forwarded for my dynamism, honesty and sincerity.

Regards

KAZI NAZMUL HAQUE

THANK YOU

Page 13: Kazi nazmul cv with all attachments

Page 13 of 24

Page 14: Kazi nazmul cv with all attachments

Page 14 of 24

Page 15: Kazi nazmul cv with all attachments

Page 15 of 24

Page 16: Kazi nazmul cv with all attachments

Page 16 of 24

Page 17: Kazi nazmul cv with all attachments

Page 17 of 24

Page 18: Kazi nazmul cv with all attachments

Page 18 of 24

Page 19: Kazi nazmul cv with all attachments

Page 19 of 24

Page 20: Kazi nazmul cv with all attachments

Page 20 of 24

Page 21: Kazi nazmul cv with all attachments

Page 21 of 24

Page 22: Kazi nazmul cv with all attachments

Page 22 of 24

Page 23: Kazi nazmul cv with all attachments

Page 23 of 24

Page 24: Kazi nazmul cv with all attachments

Page 24 of 24