Page 2: Scedule feasibility

What is schedule feasibility ? Schedule feasibility is defined as the likelihood of a

project being completed within its scheduled time frame.

If the project has a high likelihood of completion by the desired due date, then schedule feasibility is considered to be high.

Page 3: Scedule feasibility

Importance of schedule feasibility.....

Schedule feasibility ensures that a project can be completed before the project or technology becomes obsolete or unnecessary.

Page 4: Scedule feasibility

Schedule Chart

Schedule feasibility is also used in conjunction with technical feasibility, operational feasibility and economical feasibility.

Schedule feasibility is often shown in one of two different charts.

These are the Gantt and the PERT chart. These charts can be used together to show different

information.

Page 5: Scedule feasibility

How to calculate...... Schedule feasibility can be calculated using

operations research methods. In the real world, the time required to complete a

project step can vary. A software program can be used to determine the

odds of a project being completed within the desired completion date.