18
ON THE JOB TRAINING REPORT Arranged by : XII TGB A 1. Arif Budi Kusuma (05) 2. Galih Prasetya (09) 3. Hesti Romadhoni (13) Svhs 2 wonogiri 2014

On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Embed Size (px)

DESCRIPTION

Tugas Akhir :)

Citation preview

Page 1: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

ON THE JOB TRAINING REPORTArranged by : XII

TGB A

1. Arif Budi Kusuma (05)

2. Galih Prasetya (09)

3. Hesti Romadhoni (13)Svhs 2 wonogiri2014

Page 2: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

PT. METROPOLITAN LAND TBk.

Metland Menteng Project

Metland Menteng is one of PT.

Metropolitand Land Tbk. Project. It is a

housing area in Ujung Menteng,

Cakung, East Jakarta. The wide of the

area is 120 ha.

Page 3: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

“CARLA TYPE HOUSE69/96”

PT METROPOLITAN LAND TbK.Metland Menteng Project

Page 4: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

PROJECT STRUCTURE Of METLAND MENTENG

First Stage

Metland Menteng

Second Stage

Tjikini Garden Harmoni Cluster·Gladiola

·Caliandra

·Mergareta

·Algania

·Cordia

Valeria Cluster·Regina

·Valbo

·Sienna

·Celsa

·Cascabella

·Calia

·Valeria

Teresta Cluster·Florice

·Jasmine

·Carla

·Stella

Page 5: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Site PlanIndonesia has tropical climate

character. Position of house in

common in facing east. But this

house desain is across north and

south, because this are position

and the arrangement of the doors

and windows can be done well. So

air can circulate fastly.

Page 6: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Wide of The Space

a. Prominent Bed Room = 100% x 3 x 6 = 18b. Bed Room = 100% x 3 x 3 = 9c. Living Room = 100% x 2,55 x 3 =

7,65d. Family Room = 100% x 3,3 x 3 =

9,9e. Kitchen & Dinning Room = 100% x 3,3 x 3

= 9,9f. Shared Bath Room = 100% x 1,43 x

2 = 2,86g. Front Porch = 50% x 1,2 x 2,1 =

1,26h. Back Porch = 50% x 0,8 x 1 = 0,4i. Balcony = 75% x 1,2 x 2,1 =

1,89j. Cartport = 50% x 3 x 5 =

7,5 68,4 69

Page 7: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Setting The Space

KETERANGAN :: RUANG PUBLIK: RUANG SEMI

PUBLIK: RUANG PRIVAT

: RUANG SERVICE

Page 8: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Building structure

FOUNDATIONFoundation is the bottom

structure of building that has

function the carry the burden of

the top of building’s foundation.

This house uses mini/strauss pile

type of foundation.

Page 9: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

SLOOF

Page 10: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

COLUMN

Page 11: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

STAIR

Stair functioned like connector

between floor in storied building.

Finishing of the stair uses wood

floor. It is Parqued

Page 12: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

BEAM

Page 13: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

FLOOR

Page 14: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

ROOF FRAMEWORK

Page 15: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

WALLWall function as

structure element for

support burden. This

house uses ageed and

paint.

Page 16: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

Any questions..?

Page 17: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

THANK YOU...!

Page 18: On The Job Training Report - Hesti Romadhoni - Smk N 2 Wonogiri

HESTI ROMADHONI/13/XII TGB A